You are on page 1of 1

Sr No.

Project Status UOM


1 BOS Oderin
a Structure Oderi ng Lot
b ACDB Oderi ng Lot
c Wal kway & Cabl e tray Oderi ng Lot
d DC & AC Cabl e Lot
e Earthi ng Material Oderi ng Lot
f Mi sc.Item Odering Lot

2 BOS Receiving
a Structure Recei vi ng Lot
b ACDB Recei ving Lot
c Wal kway & Cabl e tray Recei ving Lot
d DC & AC Cabl e Lot
e Earthi ng Material Reci ei vi ng Lot
f Mi sc.Item Reci ei vi ng Lot

3 Key Component Receiving - URE


a Sol ar Module Nos
b Sol ar Inverter Nos

4 Execu on Ac vity
a Short Rai l Errec on Nos
b Modul e Errec on Nos
c Wal kway Errec on Mtr
d Cable tray Errec on Mtr
e Earthi ng Stri p Errec on Mtr
f LA Errec on Nos
g 35 sq.mm Cabl e Errec on (For inverter & LA) Mtr
h 6 sq.mm Earthi ng Cabl e Errec on Mtr
i Lifel ine Mtr
j DC Cabl ing Mtr
k AC Cabl i ng - 185 s q.mm Mtr
AC Cabl i ng - 150 sq.mm Mtr
AC Cabl i ng - 35 sq.mm Mtr
l DC Termina on - MC4 Connec on Nos
m AC Termi na on Nos
n Earthi ng Errec on Nos
o Earthi ng Pi t Errec on Nos
p Pl umbi ng Ac vi ty Mtr
q Inverter Errec on Nos
r ACDB Errec on Nos
s Pl ant Tes ng Nos
t Pl ant Commi ssi oning Nos

You might also like