Professional Documents
Culture Documents
NOTES:
PROJECTS
MANAGEMENT SH. MAZEN OFFICE
P.M. OFFICE
TOILET-A
Ø7
5M
M
FD
DP
/U
Ø50MM VP/US
S
Ø110MM DP/US S
/U
DP
5 MM
Ø7 KEY PLAN:
WHB
WC FCO
PRIVATE MEETING
LEGEND DRAWING/LAYOUT NOTES: FHC
UP
DN
UP
DN
OPEN TO
ATRIUM
BELOW
FCU-7
AND EQUIPMENTS SHALL BE AS APPROVED BY THE
DP DRAIN PIPE AUTHORITIES AND LANDLORD.
LOUNGE
RD
FLOOR DRAIN
FCU-7
FD PROVIDER AND INCLUDE ALL ELEMENTS REQUIRED
TO SUPPLY A COMPLETE SYSTEMS SOLUTION FOR
DWP DRAINAGE WASTE PUMP THE PROJECT REQUIREMENT.
3. CONTRACTOR TO ISSUE ALL MATERIAL SUBMITTALS REV.
DATE DESCRIPTION
REV. CHKD.
NO. BY BY
FOR APPROVAL BEFORE PROCUREMENT. ALL
FCO FLOOR CLEANOUT DEVICES AND SERVICES FINISHES SHALL BE
SUBJECT TO THE ARCHITECT'S AND CLIENT'S
CO CLEANOUT APPROVAL.
ACCOUNTANT 4. PROPOSED MEP SERVICES DIMENSIONS /
ELEVATIONS MUST BE CONFIRMED ON SITE PRIOR TO
WCO WALL CLEANOUT THE SHOP DRAWING PREPARATION, WHERE THERE
ARE APPARENT DISCREPANCIES THE CONTRACTOR
Ø50MM VS ADMIN H/L HIGH LEVEL SHALL NOTIFY THE CONSULTANT IN WRITING AND
KITCHEN-C Ø110MM DS
OBTAIN CLARIFICATION BEFORE PROCEEDING WITH
Ø50MM VS
THE WORK.
ARCHIVE FD
Ø75MM DP
L/L LOW LEVEL 5. CONTRACTOR SHALL DEVELOP THIS SCHEMATIC
ENTERTAINMENT KITCHENETTE Ø50MM DP
DESIGN TO DETAILED DESIGN AND PRODUCE
KS
WC
THEY PENETRATE.
Ø7
OFFICE
TO BE NOMINATED
MAIN CONTRACTOR:
TO BE NOMINATED
PROJECT LOCATION:
DRAINAGE PIPING
LAYOUT PLAN
DRAWN BY: CHECK BY: DESIGN STAGE: