You are on page 1of 33

CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From :3/11/2022 To:3/11/2022

GRADE OF CONCRETE M30 With 298+52OPC ( 28 DAYS ) Nov-22

CUBE STRENGTH AVG DIFF


SL.NO Date of Testing (B-A)2 sq å(B-A)2)/(n-1)
A N/mm2 B N/mm2 B-A 0.151
1 2/10/2022 36.44 36.44 0.00 0.00
STANDARD DEVIATION = 0.81 N/mm2
2 2/10/2022 35.84 36.44 0.60 0.36
3 2/10/2022 36.58 36.44 -0.14 0.02
4 2/10/2022 36.44 36.44 0.00 0.00
5 4/10/2022 36.29 36.44 0.15 0.02
6 5/10/2022 36.58 36.44 -0.14 0.02 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 5/10/2022 36.88 36.44 -0.44 0.20
8 6/10/2022 36.58 36.44 -0.14 0.02
9 6/10/2022 35.99 36.44 0.45 0.20 45.00 45.00
10 6/10/2022 36.14 36.44 0.30 0.09 40.00 M30
Compressive strength

11 6/10/2022 36.29 36.44 0.15 0.02 35.00


12 7/10/2022 36.88 36.44 -0.44 0.20 30.00

13 10/10/2022 36.73 36.44 -0.29 0.09 25.00


40.00
14 17/10/22 37.03 36.44 -0.59 0.35 20.00

15 17/10/22 36.88 36.44 0.20 15.00


-0.44
36.44 10.00
16 17/10/22 37.33 -0.89 0.80
5.00
17 23/10/22 36.44 36.44 0.00 0.00
0.00 35.00
18 25/10/22 36.59 36.44 -0.15 0.02 0 10 20 30
19 29/10/22 36.73 36.44 -0.29 0.09 No.Of Samples
20 16/11/22 37.03 36.44 -0.59 0.35
21 24/11/22 35.70 36.44 0.74 0.54 Column D Column C Column E
22 25/11/22 34.21 36.44 2.23 4.96

Averege compressive 36.44 N/mm2


strength

Maximum Value 37.33 N/mm2


Minimum Value 34.21 N/mm2
Standard Deviation 0.64 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur Client:


M/s.Salarpuria Real Estate Private Limited. Consultant:
M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From : From :2/10/2023 To:2/2/2023

GRADE OF CONCRETE M30 With 298+52OPC ( 28 DAYS ) Jan-22

CUBE STRENGTH AVG DIFF


SL.NO Date of Testing (B-A)2 sq å(B-A)2)/(n-1)
A N/mm2 B N/mm2 B-A 0.173
1 2/10/2022 36.44 36.02 -0.42 0.18
STANDARD DEVIATION = 0.81 N/mm2
2 2/10/2022 35.84 36.02 0.18 0.03
3 2/10/2022 36.58 36.02 -0.56 0.32
4 2/10/2022 36.44 36.02 -0.42 0.18
5 4/10/2022 36.29 36.02 -0.27 0.08
6 5/10/2022 36.58 36.02 -0.56 0.32 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 5/10/2022 36.88 36.02 -0.86 0.75
8 6/10/2022 36.58 36.02 -0.56 0.32
9 6/10/2022 35.99 36.02 0.03 0.00 45.00 45.00
10 6/10/2022 36.14 36.02 -0.12 0.02 40.00 M30

Compressive strength
11 6/10/2022 36.29 36.02 -0.27 0.08 35.00
12 7/10/2022 36.88 36.02 -0.86 0.75 30.00

13 10/10/2022 36.73 36.02 -0.71 0.51 25.00


40.00
14 17/10/22 37.03 36.02 -1.01 1.03 20.00

15 17/10/22 36.88 36.02 0.75 15.00


-0.86
36.02 10.00
16 17/10/22 37.33 -1.31 1.73
36.02 5.00
17 23/10/22 36.44 -0.42 0.18
0.00 35.00
18 25/10/22 36.59 36.02 -0.57 0.33 0 10 20 30
19 29/10/22 36.73 36.02 -0.71 0.51 No.Of Samples
20 16/11/22 37.03 36.02 -1.01 1.03
21 24/11/22 35.70 36.02 0.32 0.10 Column D Column C Column E
22 25/11/22 34.21 36.02 -0.12 0.02
23 11/16/2022 35.11 36.02 -0.27 0.08
24 11/20/2022 34.51 36.02 -0.86 0.75
25 11/25/2022 34.96 36.02 -0.71 0.51
26 12/2/2022 34.51 36.02 -1.01 1.03
27 12/2/2022 35.7 36.02 -0.86 0.75
28 12/14/2022 35.11 36.02 -1.31 1.73
29 12/18/2022 34.51 36.02 -0.42 0.18
30 12/23/2022 34.96 36.02 -0.57 0.33
31 12/30/2022 34.51 36.02 -0.71 0.51
32 12/30/2022 35.7 36.02 -1.01 1.03
33 6/1/2023 35.85 36.02 0.32 0.10
34 9/1/2023 36.14 36.02 1.81 3.26
35 10/1/2023 36.14 36.02 0.91 0.82
36 19/1/2023 36.73 36.02 1.51 2.27
37 21/1/2023 35.99 36.02 1.06 1.11
38 7/2/2023 35.25 36.02 1.51 2.27
39 21/2/23 36.88 36.02 0.32 0.10
40 22/2/23 36.44 36.02 0.91 0.82
Averege compressive 36.02 N/mm2
strength
Maximum Value 37.33 N/mm2
Minimum Value 34.21 N/mm2
Standard Deviation 0.84 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From 20/2/2023 To:31/3/2023

GRADE OF CONCRETE M35 With 380kgsOPC ( 28 DAYS ) Mar-23

CUBE STRENGTH AVG DIFF


SL.NO Date of Testing (B-A)2 sq å(B-A)2)/(n-1)
A N/mm2 B N/mm2 B-A #DIV/0!
1 21/2/2023 41.03 41.03 0.00 0.00 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
41.03 41.03 1683.46
41.03 41.03 1683.46
41.03 41.03 1683.46 45.00 45.00
41.03 41.03 1683.46 M35

Compressive strength
41.03 41.03 1683.46
41.03 41.03 1683.46
41.03 41.03 1683.46
41.03 41.03 1683.46 40.00 40.00
41.03 41.03 1683.46
41.03 41.03 1683.46
41.03 41.03 1683.46
41.03 41.03 1683.46
41.03 41.03 1683.46 35.00 35.00
0 10 20 30
41.03 41.03 1683.46
No.Of Samples
41.03 41.03 1683.46
41.03 41.03 1683.46
41.03 41.03 1683.46 Column D Column C Column E
41.03 41.03 1683.46
41.03 41.03 1683.46
41.03 41.03 1683.46
41.03 41.03 1683.46
41.03 41.03 1683.46
41.03 41.03 1683.46
41.03 41.03 1683.46
41.03 41.03 1683.46
41.03 41.03 1683.46
41.03 41.03 1683.46
41.03 41.03 1683.46
41.03 41.03 1683.46
41.03 41.03 1683.46
41.03 41.03 1683.46

Averege compressive 41.03 N/mm2


strength
Maximum Value 41.03 N/mm2
Minimum Value 41.03 N/mm2
Standard Deviation #DIV/0! N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From : From :10/02/2022 To:1/1/2023

GRADE OF CONCRETE M30 With 298+52OPC ( 28 DAYS ) Dec-22

CUBE STRENGTH AVG DIFF


SL.NO Date of Testing (B-A)2 sq å(B-A)2)/(n-1)
A N/mm2 B N/mm2 B-A 0.180
1 2/10/2022 36.44 35.97 #REF! #REF!
STANDARD DEVIATION = 0.81 N/mm2
2 2/10/2022 35.84 35.97 #REF! #REF!
3 2/10/2022 36.58 35.97 #REF! #REF!
4 2/10/2022 36.44 35.97 #REF! #REF!
5 4/10/2022 36.29 35.97 #REF! #REF!
6 5/10/2022 36.58 35.97 #REF! #REF! * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 5/10/2022 36.88 35.97 #REF! #REF!
8 6/10/2022 36.58 35.97 #REF! #REF!
9 6/10/2022 35.99 35.97 #REF! #REF! 45.00 45.00
10 6/10/2022 36.14 35.97 #REF! #REF! 40.00 M30
Compressive strength

11 6/10/2022 36.29 35.97 -0.32 0.10 35.00


12 7/10/2022 36.88 35.97 -0.91 0.82 30.00

13 10/10/2022 36.73 35.97 -0.47 0.22 25.00


40.00
14 17/10/22 37.03 35.97 0.13 0.02 20.00

15 17/10/22 36.88 35.97 0.37 15.00


-0.61
35.97 10.00
16 17/10/22 37.33 -0.47 0.22
5.00
17 23/10/22 36.44 35.97 -0.32 0.10
0.00 35.00
18 25/10/22 36.59 35.97 -0.61 0.37 0 10 20 30
19 29/10/22 36.73 35.97 -0.91 0.82 No.Of Samples
20 16/11/22 37.03 35.97 -0.61 0.37
21 24/11/22 35.70 35.97 -0.02 0.00 Column D Column C Column E
22 25/11/22 34.21 35.97 -0.17 0.03
23 11/16/2022 35.11 35.97 -0.32 0.10
24 11/20/2022 34.51 35.97 -0.91 0.82
25 11/25/2022 34.96 35.97 -0.76 0.57
26 12/2/2022 34.51 35.97 -1.06 1.11
27 12/2/2022 35.7 35.97 -0.91 0.82
28 12/14/2022 35.11 35.97 -1.36 1.84
29 12/18/2022 34.51 35.97 -0.47 0.22
30 12/23/2022 34.96 35.97 -0.62 0.38
31 12/30/2022 34.51 35.97 -0.76 0.57
32 12/30/2022 35.7 35.97 -1.06 1.11
Averege compressive 35.97 N/mm2
strength
Maximum Value 37.33 N/mm2
Minimum Value 34.21 N/mm2
Standard Deviation 0.91 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From :3/3/2022 To:3/4/2022

GRADE OF CONCRETE M30 With 310kgsOPC ( 28 DAYS ) Mar-22

CUBE STRENGTH AVG DIFF


SL.NO Date of Testing (B-A)2 sq å(B-A)2)/(n-1)
A N/mm2 B N/mm2 B-A 0.140
1 1/9/2022 36.44 36.43 -0.01 0.00
STANDARD DEVIATION = 0.81 N/mm2
2 2/9/2022 35.84 36.43 0.59 0.34
3 2/9/2022 36.88 36.43 -0.45 0.21
4 2/9/2022 35.40 36.43 1.03 1.05
5 2/9/2022 36.29 36.43 0.14 0.02
6 4/9/2022 36.58 36.43 -0.15 0.02 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 10/9/2022 37.33 36.43 -0.90 0.82
8 10/9/2022 35.69 36.43 0.74 0.54
9 10/9/2022 35.25 36.43 1.18 1.38 45.00 45.00
10 10/9/2022 36.29 36.43 0.14 0.02 40.00 M30
Compressive strength

35.00
11 13/9/22 36.44 36.43 -0.01 0.00 30.00
12 14/9/22 36.88 36.43 -0.45 0.21 25.00
40.00
13 16/9/22 36.73 36.43 -0.30 0.09 20.00
36.43 15.00
14 16/9/22 36.58 -0.15 0.02
10.00
15 21/9/22 36.29 36.43 0.14 0.02 5.00
16 21/9/22 37.03 36.43 -0.60 0.37 0.00 35.00
0 10 20 30
17 21/9/22 36.88 36.43 -0.45 0.21
No.Of Samples
18 23/9/22 36.44 36.43 -0.01 0.00
19 23/9/22 36.43 36.43 0.00 0.00 Column D Column C Column E
20 24/9/22 36.44 36.43 -0.01 0.00
21 24/9/22 36.14 36.43 0.29 0.08
22 27/9/22 36.88 36.43 -0.45 0.21
23 27/9/22 35.84 36.43 0.59 0.34
24 29/9/22 36.88 36.43 -0.45 0.21
25 29/9/22 37.03 36.43 -0.60 0.37
26 29/9/22 35.99 36.43 0.44 0.19
27 29/9/22 36.44 36.43 -0.01 0.00
28 29/9/22 36.58 36.43 -0.15 0.02

Averege compressive 36.43 N/mm2


strength

Maximum Value 37.33 N/mm2


Minimum Value 35.25 N/mm2
Standard Deviation 0.55 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From :3/3/2022 To:3/4/2022

GRADE OF CONCRETE M30 With 310kgsOPC ( 28 DAYS ) Mar-22

CUBE STRENGTH AVG DIFF


SL.NO Date of Testing (B-A)2 sq å(B-A)2)/(n-1)
A N/mm2 B N/mm2 B-A 0.152
1 29/7/22 37.32 36.39 -0.93 0.86
STANDARD DEVIATION = 0.81 N/mm2
2 29/7/22 35.85 36.39 0.54 0.29
3 29/7/22 35.40 36.39 0.99 0.98
4 29/7/22 37.18 36.39 -0.79 0.62
5 30/7/22 36.88 36.39 -0.49 0.24
6 30/7/22 35.55 36.39 0.84 0.71 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 1/8/2022 35.99 36.39 0.40 0.16
8 1/8/2022 36.88 36.39 -0.49 0.24
9 2/8/2022 36.73 36.39 -0.34 0.11 45.00 45.00
10 4/8/2022 36.29 36.39 0.10 0.01 40.00 M30
Compressive strength

35.00
11 4/8/2022 37.62 36.39 -1.23 1.51 30.00
12 4/8/2022 35.70 36.39 0.69 0.48 25.00
40.00
13 4/8/2022 35.99 36.39 0.40 0.16 20.00
36.39 15.00
14 11/8/2022 35.55 0.84 0.71
10.00
15 11/8/2022 35.99 36.39 0.40 0.16 5.00
16 11/8/2022 35.99 36.39 0.40 0.16 0.00 35.00
0 10 20 30
17 13/8/22 37.32 36.39 -0.93 0.86
No.Of Samples
18 13/8/22 36.14 36.39 0.25 0.06
19 13/8/22 36.29 36.39 0.10 0.01 Column D Column C Column E
20 16/8/22 36.29 36.39 0.10 0.01
21 17/8/22 35.69 36.39 0.70 0.49
22 17/8/22 37.03 36.39 -0.64 0.41
23 18/8/22 37.03 36.39 -0.64 0.41
24 21/8/22 37.03 36.39 -0.64 0.41
25 22/8/22 36.88 36.39 -0.49 0.24
26 22/8/22 36.14 36.39 0.25 0.06
27 22/8/22 36.73 36.39 -0.34 0.11
28 25/8/22 35.84 36.39 0.55 0.30
29 25/8/22 34.96 36.39 1.43 2.05
30 25/8/22 36.88 36.39 -0.49 0.24
31 26/8/22 36.44 36.39 -0.05 0.00
32 29/8/22 36.73 36.39 -0.34 0.11
33 30/8/22 36.58 36.39 -0.19 0.04

Averege compressive 36.39 N/mm2


strength

Maximum Value 37.62 N/mm2


Minimum Value 34.96 N/mm2
Standard Deviation 0.64 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From :3/3/2022 To:3/4/2022

GRADE OF CONCRETE M30 With 310kgsOPC ( 28 DAYS ) Mar-22

CUBE STRENGTH AVG DIFF


SL.NO Date of Testing (B-A)2 sq å(B-A)2)/(n-1)
A N/mm2 B N/mm2 B-A 0.148
1 5/7/2022 36.29 36.39 0.10 0.01
STANDARD DEVIATION = 0.81 N/mm2
2 5/7/2022 35.40 36.39 0.99 0.98
3 7/7/2022 36.58 36.39 -0.19 0.04
4 7/7/2022 35.99 36.39 0.40 0.16
5 8/7/2022 37.18 36.39 -0.79 0.62
6 8/7/2022 35.40 36.39 0.99 0.98 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 8/7/2022 36.14 36.39 0.25 0.06
8 8/7/2022 36.73 36.39 -0.34 0.11
9 9/7/2022 36.88 36.39 -0.49 0.24 45.00 45.00
10 9/7/2022 36.58 36.39 -0.19 0.04 40.00 M30
Compressive strength

35.00
11 10/7/2022 35.99 36.39 0.40 0.16 30.00
12 10/7/2022 37.33 36.39 -0.94 0.88 25.00
40.00
13 10/7/2022 35.70 36.39 0.69 0.48 20.00
36.39 15.00
14 12/7/2022 36.44 -0.05 0.00
10.00
15 12/7/2022 35.84 36.39 0.55 0.30 5.00
16 12/7/2022 37.33 36.39 -0.94 0.88 0.00 35.00
0 10 20 30
17 12/7/2022 35.84 36.39 0.55 0.30
No.Of Samples
18 16/7/22 36.58 36.39 -0.19 0.04
19 16/7/22 35.69 36.39 0.70 0.49 Column D Column C Column E
20 16/7/22 37.33 36.39 -0.94 0.88
21 16/7/22 35.85 36.39 0.54 0.29
22 19/7/22 36.96 36.39 -0.57 0.32
23 19/7/22 35.84 36.39 0.55 0.30
24 19/7/22 37.18 36.39 -0.79 0.62
25 19/7/22 35.70 36.39 0.69 0.48
26 19/7/22 37.18 36.39 -0.79 0.62
27 19/7/22 36.14 36.39 0.25 0.06
28 21/7/22 36.14 36.39 0.25 0.06
29 21/7/22 36.14 36.39 0.25 0.06
30 21/7/22 37.32 36.39 -0.93 0.86
31 23/7/22 36.44 36.39 -0.05 0.00

Averege compressive 36.39 N/mm2


strength

Maximum Value 37.33 N/mm2


Minimum Value 35.40 N/mm2
Standard Deviation 0.62 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From :1/3/2022 To:30/3/2022

GRADE OF CONCRETE M50 With 450kgsOPC+40 kgs of Alcofines ( 28 DAYS ) MAR'22

CUBE STRENGTH AVG DIFF sq å(B-A)2)/(n-1)


SL.NO Date of Testing (B-A)2
A N/mm 2
B N/mm 2 B-A 0.116
1 6/7/2022 58.07 58.68 0.61 0.37
STANDARD DEVIATION = 1.62 N/mm2
2 10/7/2022 58.81 58.68 -0.13 0.02
3 10/7/2022 58.96 58.68 -0.28 0.08
4 11/7/2022 59.40 58.68 -0.72 0.52
5 12/7/2022 58.36 58.68 0.32 0.10
6 14/7/22 58.51 58.68 0.17 0.03 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 14/7/22 57.92 58.68 0.76 0.57
8 14/7/22 57.77 58.68 0.91 0.82
65.00 65
9 14/7/22 59.40 58.68 -0.72 0.52
10 14/7/22 58.36 58.68 0.32 0.10
Compressive strength

11 15/7/22 58.96 58.68 -0.28 0.08


12 15/7/22 59.10 58.68 -0.42 0.18 60.00 60
13 17/7/22 58.51 58.68 0.17 0.03
M50
14 17/7/22 58.95 58.68 -0.27 0.07
15 17/7/22 58.36 58.68 0.32 0.10 55.00 55
16 17/7/22 59.40 58.68 -0.72 0.52
17 19/7/22 58.66 58.68 0.02 0.00
18 19/7/22 58.66 58.68 0.02 0.00
58.68 50.00 50
19 19/7/22 58.51 0.17 0.03
20 20/7/22 58.51 58.68 0.17 0.03
21 20/7/22 59.10 58.68 -0.42 0.18
45.00 45
22 21/7/22 58.66 58.68 0.02 0.00 0 10 20 30 40

23 21/7/22 58.51 58.68 0.17 0.03 No.Of Samples

24 24/7/22 58.81 58.68 -0.13 0.02


25 24/7/22 59.25 58.68 -0.57 0.33
26 24/7/22 58.51 58.68 0.17 0.03
27 26/7/22 58.81 58.68 -0.13 0.02
28 27/7/22 58.96 58.68 -0.28 0.08 Column C Column A Column D
29 27/7/22 59.25 58.68 -0.57 0.33
30 31/7/22 59.11 58.68 -0.43 0.19
31 31/7/22 57.33 58.68 1.35 1.81
32 31/7/22 58.07 58.68 0.61 0.37
33 2/8/2022 58.96 58.68 -0.28 0.08
34 2/8/2022 58.51 58.68 0.17 0.03
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58

Averege compressive 58.68 N/mm2


strength
Maximum Value 59.40 N/mm2
Minimum Value 57.33 N/mm2
Standard Deviation 0.48 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From :1/3/2022 To:30/3/2022

GRADE OF CONCRETE M50 With 450kgsOPC+40 kgs of Alcofines ( 28 DAYS ) MAR'22

CUBE STRENGTH AVG DIFF sq å(B-A)2)/(n-1)


SL.NO Date of Testing (B-A)2
A N/mm 2
B N/mm 2 B-A 0.114
1 6/2/2022 58.66 58.59 -0.07 0.01
STANDARD DEVIATION = 1.62 N/mm2
2 6/2/2022 57.18 58.59 1.41 1.97
3 6/3/2022 57.92 58.59 0.67 0.44
4 6/3/2022 58.21 58.59 0.38 0.14
5 6/4/2022 58.96 58.59 -0.37 0.14
6 6/4/2022 58.36 58.59 0.23 0.05 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 6/6/2022 58.66 58.59 -0.07 0.01
8 6/6/2022 57.77 58.59 0.82 0.66
65.00 65
9 6/11/2022 58.51 58.59 0.08 0.01
10 6/11/2022 58.07 58.59 0.52 0.27
Compressive strength

11 6/13/2022 58.51 58.59 0.08 0.01


12 6/13/2022 58.51 58.59 0.08 0.01 60.00 60
13 6/15/2022 58.51 58.59 0.08 0.01
M50
14 6/19/2022 58.21 58.59 0.38 0.14
15 6/19/2022 58.66 58.59 -0.07 0.01 55.00 55
16 6/19/2022 57.77 58.59 0.82 0.66
17 6/19/2022 58.21 58.59 0.38 0.14
18 6/20/2022 58.81 58.59 -0.22 0.05
58.59 50.00 50
19 6/21/2022 58.07 0.52 0.27
20 6/21/2022 58.51 58.59 0.08 0.01
21 6/22/2022 58.96 58.59 -0.37 0.14
45.00 45
22 6/23/2022 58.36 58.59 0.23 0.05 0 10 20 30 40

23 6/24/2022 58.21 58.59 0.38 0.14 No.Of Samples

24 6/24/2022 58.51 58.59 0.08 0.01


25 6/25/2022 58.36 58.59 0.23 0.05
26 6/27/2022 58.81 58.59 -0.22 0.05
27 6/27/2022 58.96 58.59 -0.37 0.14
28 7/1/2022 59.40 58.59 -0.81 0.66 Column C Column A Column D
29 7/4/2022 59.25 58.59 -0.66 0.44
30 6/7/2022 58.07
31 10/7/2022 58.81
32 10/7/2022 58.96
33 11/7/2022 59.40
34 12/7/2022 58.36
35 14/7/22 58.51
36 14/7/22 57.92
37 14/7/22 57.77
38 14/7/22 59.40
39 14/7/22 58.36
40 15/7/22 58.96
41 15/7/22 59.10
42 17/7/22 58.51
43 17/7/22 58.95
44 17/7/22 58.36
45 17/7/22 59.40
46 19/7/22 58.66
47 19/7/22 58.66
48 19/7/22 58.51
49 20/7/22 58.51
50 20/7/22 59.10
51 21/7/22 58.66
52 21/7/22 58.51
53 24/7/22 58.81
54 24/7/22 59.25
55 24/7/22 58.51
56 26/7/22 58.81
57 27/7/22 58.96
58 27/7/22 59.25

Averege compressive 58.59 N/mm2


strength
Maximum Value 59.40 N/mm2
Minimum Value 57.77 N/mm2
Standard Deviation 0.47 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From :3/3/2022 To:3/4/2022

GRADE OF CONCRETE M30 With 310kgsOPC ( 28 DAYS ) Mar-22

CUBE STRENGTH AVG DIFF


SL.NO Date of Testing (B-A)2 sq å(B-A)2)/(n-1)
A N/mm2 B N/mm2 B-A 0.140
1 2/5/2022 36.29 35.94 -0.35 0.12
STANDARD DEVIATION = 0.81 N/mm2
2 4/5/2022 35.10 35.94 0.84 0.71
3 17/5/22 36.58 35.94 -0.64 0.41
4 26/5/22 35.84 35.94 0.10 0.01
5 30/5/22 35.70 35.94 0.24 0.06
6 6/4/2022 35.84 35.94 0.10 0.01 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 6/18/2022 36.44 35.94 -0.50 0.25
8 6/20/2022 34.59 35.94 1.35 1.83
9 6/20/2022 36.43 35.94 -0.49 0.24 45.00 45.00
10 6/23/2022 35.69 35.94 0.25 0.06 40.00 M30
Compressive strength

35.00
11 6/23/2022 36.14 35.94 -0.20 0.04 30.00
12 6/25/2022 35.99 35.94 -0.05 0.00 25.00
40.00
13 6/25/2022 35.40 35.94 0.54 0.29 20.00
35.94 15.00
14 6/26/2022 36.29 -0.35 0.12
10.00
15 6/27/2022 35.99 35.94 -0.05 0.00 5.00
16 7/1/2022 36.73 35.94 -0.79 0.62 0.00 35.00
0 10 20 30
17 7/4/2022 35.99 35.94 -0.05 0.00
No.Of Samples

Column D Column C Column E

Averege compressive 35.94 N/mm2


strength

Maximum Value 36.73 N/mm2


Minimum Value 34.59 N/mm2
Standard Deviation 0.55 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From :24/1/2022 To:14/2/2022

GRADE OF CONCRETE M30 With 310kgsOPC ( 28 DAYS ) Mar-22

CUBE STRENGTH AVG DIFF


SL.NO Date of Testing (B-A)2 sq å(B-A)2)/(n-1)
A N/mm2 B N/mm2 B-A 0.144
1 2/5/2022 48.58 48.30 -0.28 0.08
STANDARD DEVIATION = 0.81 N/mm2
2 5/5/2022 48.29 48.30 0.01 0.00
3 5/5/2022 49.33 48.30 -1.03 1.06
4 5/5/2022 48.58 48.30 -0.28 0.08
5 5/5/2022 49.03 48.30 -0.73 0.53
6 5/5/2022 48.59 48.30 -0.29 0.08 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 5/5/2022 48.14 48.30 0.16 0.03
8 5/5/2022 48.29 48.30 0.01 0.00
9 5/5/2022 48.88 48.30 -0.58 0.33
10 8/5/2022 48.44 48.30 -0.14 0.02 45.00 45.00

11 8/5/2022 49.03 48.30 0.53


M4
-0.73
12 11/5/2022 48.44 48.30 0.02
0
-0.14
Compressive strength

40.00
13 12/5/2022 48.14 48.30 0.16 0.03
14 12/5/2022 48.14 48.30 0.16 0.03
15 12/5/2022 48.88 48.30 -0.58 0.33 35.00
16 12/5/2022 46.51 48.30 1.79 3.21
17 12/5/2022 48.44 48.30 -0.14 0.02
18 14/5/22 47.70 48.30 0.60 0.36 30.00
19 14/5/22 47.70 48.30 0.60 0.36
20 14/5/22 48.88 48.30 -0.58 0.33
21 14/5/22 47.55 48.30 0.75 0.57 25.00

22 14/5/22 48.29 48.30 0.01 0.00 40.00


23 14/5/22 48.44 48.30 -0.14 0.02
20.00
24 14/5/22 48.29 48.30 0.01 0.00
25 16/5/22 47.25 48.30 1.05 1.11
26 16/5/22 48.73 48.30 -0.43 0.18 15.00
27 18/5/22 48.59 48.30 -0.29 0.08
28 20/5/22 48.29 48.30 0.01 0.00
29 20/5/22 48.29 48.30 0.01 0.00 10.00
30 20/5/22 47.84 48.30 0.46 0.21
31 20/5/22 48.73 48.30 -0.43 0.18
32 20/5/22 48.14 48.30 0.16 0.03 5.00

33 20/5/22 48.44 48.30 -0.14 0.02


34 20/5/22 47.69 48.30 0.61 0.37
0.00 35.00
35 28/5/22 48.14 48.30 0.16 0.03 0 10 20 30
36 28/5/22 48.29 48.30 0.01 0.00
No.Of Samples
37 28/5/22 47.85 48.30 0.45 0.20
38 28/5/22 49.18 48.30 -0.88 0.77
39 28/5/22 48.88 48.30 -0.58 0.33
40 28/5/22 47.25 48.30 1.05 1.11
41 28/5/22 47.99 48.30 0.31 0.10
42 28/5/22 47.84 48.30 0.46 0.21
43 6/8/2022 48.88 48.30 -0.58 0.33
44 6/8/2022 47.55 48.30 0.75 0.57
45 6/14/2022 48.44 48.30 -0.14 0.02 Column D Column C Column E
46 6/14/2022 49.03 48.30 -0.73 0.53
47 24/6/22 48.88 48.30 -0.58 0.33
48 21/7/22 49.47 48.30 -1.17 1.36
49 23/7/22 49.47 48.30 -1.17 1.36
50 4/8/2022 48.88 48.30 -0.58 0.33
Averege compressive 48.30 N/mm2
strength

Maximum Value 49.47 N/mm2


Minimum Value 46.51 N/mm2
Standard Deviation 0.60 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From :1/3/2022 To:30/3/2022

GRADE OF CONCRETE M50 With 450kgsOPC+40 kgs of Alcofines ( 28 DAYS ) MAR'22

CUBE STRENGTH AVG DIFF sq å(B-A)2)/(n-1)


SL.NO Date of Testing (B-A)2
A N/mm 2
B N/mm 2 B-A 0.129
1 30/4/22 58.96 58.27 -0.69 0.48
STANDARD DEVIATION = 1.62 N/mm2
2 30/4/22 57.33 58.27 0.94 0.88
3 30/4/22 58.81 58.27 -0.54 0.29
4 2/5/2022 58.36 58.27 -0.09 0.01
5 5/5/2022 57.47 58.27 0.80 0.64
6 5/5/2022 58.36 58.27 -0.09 0.01 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 5/5/2022 58.36 58.27 -0.09 0.01
8 5/5/2022 58.66 58.27 -0.39 0.15
65.00 65
9 8/5/2022 57.77 58.27 0.50 0.25
10 9/5/2022 58.96 58.27 -0.69 0.48
Compressive strength

11 9/5/2022 57.92 58.27 0.35 0.12


12 10/5/2022 58.21 58.27 0.06 0.00 60.00 60
13 11/5/2022 58.36 58.27 -0.09 0.01
M50
14 12/5/2022 57.92 58.27 0.35 0.12
15 13/5/22 58.06 58.27 0.21 0.04 55.00 55
16 14/5/22 58.06 58.27 0.21 0.04
17 14/5/22 57.62 58.27 0.65 0.42
18 14/5/22 58.51 58.27 -0.24 0.06
58.27 50.00 50
19 16/5/22 58.96 -0.69 0.48
20 18/5/22 57.77 58.27 0.50 0.25
21 19/5/22 58.81 58.27 -0.54 0.29
45.00 45
22 19/5/22 57.77 58.27 0.50 0.25 0 10 20 30 40

23 20/5/22 58.36 58.27 -0.09 0.01 No.Of Samples

24 20/5/22 58.07 58.27 0.20 0.04


25 20/5/22 57.62 58.27 0.65 0.42
26 20/5/22 58.21 58.27 0.06 0.00
27 23/5/22 57.77 58.27 0.50 0.25
28 23/5/22 58.07 58.27 0.20 0.04 Column C Column A Column D
29 25/5/22 58.81 58.27 -0.54 0.29
30 25/5/22 58.07 58.27 0.20 0.04
31 26/5/22 58.81 58.27 -0.54 0.29
32 26/5/22 57.47 58.27 0.80 0.64
33 28/5/22 58.07 58.27 0.20 0.04
34 28/5/22 58.21 58.27 0.06 0.00
35 58.36 58.27 -0.09 0.01
36 57.92 58.27 0.35 0.12
37 58.22 58.27 0.05 0.00
38 58.51 58.27 -0.24 0.06
39 58.81 58.27 -0.54 0.29
40 57.62 58.27 0.65 0.42
41 59.11 58.27 -0.84 0.71
42 57.77 58.27 0.50 0.25
43 58.51 58.27 -0.24 0.06
44 58.21 58.27 0.06 0.00
45 59.99 58.27 -1.72 2.96
46 58.81 58.27 -0.54 0.29

Averege compressive 58.27 N/mm2


strength
Maximum Value 59.99 N/mm2
Minimum Value 57.47 N/mm2
Standard Deviation 0.60 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From :24/1/2022 To:14/2/2022

GRADE OF CONCRETE M30 With 310kgsOPC ( 28 DAYS ) Mar-22

CUBE STRENGTH AVG DIFF


SL.NO Date of Testing (B-A)2 sq å(B-A)2)/(n-1)
A N/mm2 B N/mm2 B-A 0.121
1 3/4/2022 48.58 48.75 0.17 0.03
STANDARD DEVIATION = 0.81 N/mm2
2 3/4/2022 49.03 48.75 -0.28 0.08
3 3/4/2022 48.29 48.75 0.46 0.21
4 3/4/2022 48.47 48.75 0.28 0.08
5 3/4/2022 49.18 48.75 -0.43 0.19
6 3/4/2022 48.29 48.75 0.46 0.21 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 4/4/2022 48.88 48.75 -0.13 0.02
8 26/4/22 48.88 48.75 -0.13 0.02
9 26/4/22 49.18 48.75 -0.43 0.19 45.00
40.00
M4
Compressive strength

10 26/4/22 47.84 48.75 0.91 0.82 30.00


11 26/4/22 48.73 48.75 0.02 0.00 20.00 0 40.00
12 26/4/22 48.88 48.75 -0.13 0.02 10.00
13 26/4/22 49.47 48.75 -0.72 0.53 0.00 35.00
0 10 20 30
14 26/4/22 48.73 48.75 0.02 0.00
No.Of Samples
15 48.75 2376.08 Column D Column C Column E
48.75

Averege compressive 48.75 N/mm2


strength

Maximum Value 49.47 N/mm2


Minimum Value 47.84 N/mm2
Standard Deviation 0.43 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From :1/3/2022 To:30/3/2022

GRADE OF CONCRETE M50 With 450kgsOPC+40 kgs of Alcofines ( 28 DAYS ) MAR'22

CUBE STRENGTH AVG DIFF sq å(B-A)2)/(n-1)


SL.NO Date of Testing (B-A)2
A N/mm 2
B N/mm 2 B-A 0.125
1 31/3/22 58.51 58.23 -0.28 0.08
STANDARD DEVIATION = 1.62 N/mm2
2 1/4/2022 57.77 58.23 0.46 0.22
3 1/4/2022 58.66 58.23 -0.43 0.18
4 1/4/2022 58.36 58.23 -0.13 0.02
5 2/4/2022 59.11 58.23 -0.88 0.77
6 3/4/2022 58.21 58.23 0.02 0.00 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 3/4/2022 57.18 58.23 1.05 1.11
8 3/4/2022 57.33 58.23 0.90 0.82
65.00 65
9 5/4/2022 58.96 58.23 -0.73 0.53
10 5/4/2022 57.47 58.23 0.76 0.58
Compressive strength

11 6/4/2022 57.47 58.23 0.76 0.58


12 7/4/2022 58.07 58.23 0.16 0.03 60.00 60
13 7/4/2022 58.66 58.23 -0.43 0.18
M50
14 2/4/2022 57.77 58.23 0.46 0.22
15 8/4/2022 57.92 58.23 0.31 0.10 55.00 55
16 9/4/2022 57.92 58.23 0.31 0.10
17 10/4/2022 58.36 58.23 -0.13 0.02
18 11/4/2022 57.62 58.23 0.61 0.38
58.23 50.00 50
19 11/4/2022 58.22 0.01 0.00
20 12/4/2022 58.36 58.23 -0.13 0.02
21 13/4/22 57.77 58.23 0.46 0.22
45.00 45
22 13/4/22 57.92 58.23 0.31 0.10 0 10 20 30 40

23 13/4/22 58.36 58.23 -0.13 0.02 No.Of Samples

24 14/4/22 57.77 58.23 0.46 0.22


25 17/4/22 58.06 58.23 0.17 0.03
26 19/4/22 58.66 58.23 -0.43 0.18
27 20/4/22 58.06 58.23 0.17 0.03
28 20/4/22 57.92 58.23 0.31 0.10 Column C Column A Column D
29 20/4/22 58.07 58.23 0.16 0.03
30 21/4/22 58.81 58.23 -0.58 0.33
31 21/4/22 58.07 58.23 0.16 0.03
32 21/4/22 58.66 58.23 -0.43 0.18
33 22/4/22 58.81 58.23 -0.58 0.33
34 23/4/22 58.07 58.23 0.16 0.03
35 24/4/22 58.36 58.23 -0.13 0.02
36 24/4/22 57.92 58.23 0.31 0.10
37 24/4/22 58.22 58.23 0.01 0.00
38 24/4/22 58.51 58.23 -0.28 0.08
39 26/4/22 58.81 58.23 -0.58 0.33
40 26/4/22 57.62 58.23 0.61 0.38
41 27/4/22 59.11 58.23 -0.88 0.77
42 27/4/22 57.77 58.23 0.46 0.22
43 29/4/22 58.51 58.23 -0.28 0.08
44 29/4/22 58.21 58.23 0.02 0.00
45 29/4/22 59.99 58.23 -1.76 3.08
46 29/4/22 58.81 58.23 -0.58 0.33

Averege compressive 58.23 N/mm2


strength
Maximum Value 59.99 N/mm2
Minimum Value 57.62 N/mm2
Standard Deviation 0.56 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From :3/3/2022 To:3/4/2022

GRADE OF CONCRETE M30 With 310kgsOPC ( 28 DAYS ) Mar-22

CUBE STRENGTH AVG DIFF


SL.NO Date of Testing (B-A)2 sq å(B-A)2)/(n-1)
A N/mm2 B N/mm2 B-A 0.271
1 13/4/22 35.70 36.66 0.96 0.93
STANDARD DEVIATION = 0.81 N/mm2
2 20/4/22 35.84 36.66 0.82 0.68
3 20/4/22 35.11 36.66 1.55 2.41
4 21/4/22 35.69 36.66 0.97 0.95
5 21/4/22 37.03 36.66 -0.37 0.13
6 21/4/22 35.84 36.66 0.82 0.68 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 21/4/22 35.70 36.66 0.96 0.93
8 21/4/22 35.84 36.66 0.82 0.68
9 21/4/22 36.58 36.66 0.08 0.01 45.00 45.00
10 21/4/22 35.84 36.66 0.82 0.68 40.00 M30
Compressive strength

35.00
11 22/4/22 35.25 36.66 1.41 2.00 30.00
12 22/4/22 37.03 36.66 -0.37 0.13 25.00
40.00
13 22/4/22 36.14 36.66 0.52 0.27 20.00
36.66 15.00
14 22/4/22 35.84 0.82 0.68
10.00
15 24/4/22 36.59 36.66 0.07 0.01 5.00
16 24/4/22 36.14 36.66 0.52 0.27 0.00 35.00
0 10 20 30
17 2/5/2022 36.29 36.66 0.37 0.14
No.Of Samples
18 4/5/2022 35.10 36.66 1.56 2.44
19 17/5/22 36.58 36.66 0.08 0.01 Column D Column C Column E
20 26/5/22 35.84 36.66 0.82 0.68
21 30/5/22 35.70 36.66 0.96 0.93
22 38.07 36.66 -1.41 1.98
23 40.29 36.66 -3.63 13.16
24 40.00 36.66 -3.34 11.14
20 39.85 36.66 -3.19 10.16
21 39.70 36.66 -3.04 9.22
22 35.10 36.66 1.56 2.44
23 36.29 36.66 0.37 0.14
24 34.95 36.66 1.71 2.93
20 35.84 36.66 0.82 0.68
21 38.51 36.66 -1.85 3.41
22 41.03 36.66 -4.37 19.07
23 36.14 36.66 0.52 0.27
24 35.10 36.66 1.56 2.44

Averege compressive 36.66 N/mm2


strength

Maximum Value 41.03 N/mm2


Minimum Value 34.95 N/mm2
Standard Deviation 2.06 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From :1/3/2022 To:30/3/2022

GRADE OF CONCRETE M50 With 450kgsOPC+40 kgs of Alcofines ( 28 DAYS ) MAR'22

CUBE STRENGTH AVG DIFF sq å(B-A)2)/(n-1)


SL.NO Date of Testing (B-A)2
A N/mm 2
B N/mm 2 B-A 0.154
1 1/3/2022 57.42 57.60 0.18 0.03
STANDARD DEVIATION = 1.62 N/mm2
2 1/3/2022 57.27 57.60 0.33 0.11
3 2/3/2022 54.81 57.60 2.79 7.77
4 3/3/2022 58.07 57.60 -0.47 0.22
5 3/3/2022 57.60 57.60 0.00 0.00
6 3/3/2022 57.48 57.60 0.12 0.01 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 4/3/2022 56.78 57.60 0.82 0.67
8 5/3/2022 56.74 57.60 0.86 0.74
65.00 65
9 6/3/2022 57.48 57.60 0.12 0.01
10 7/3/2022 56.14 57.60 1.46 2.12
Compressive strength

11 8/3/2022 55.85 57.60 1.75 3.05


12 9/3/2022 56.44 57.60 1.16 1.34 60.00 60
13 10/3/2022 57.77 57.60 -0.17 0.03
M50
14 10/3/2022 55.55 57.60 2.05 4.19
15 10/3/2022 56.29 57.60 1.31 1.71 55.00 55
16 11/3/2022 57.19 57.60 0.41 0.17
17 11/3/2022 58.96 57.60 -1.36 1.86
18 12/3/2022 57.77 57.60 -0.17 0.03
57.60 50.00 50
19 13/3/22 58.07 -0.47 0.22
20 15/3/22 58.51 57.60 -0.91 0.83
21 15/3/22 57.92 57.60 -0.32 0.10
45.00 45
22 15/3/22 60.29 57.60 -2.69 7.25 0 10 20 30 40

23 15/3/22 57.77 57.60 -0.17 0.03 No.Of Samples

24 16/3/22 58.48 57.60 -0.88 0.78


25 17/3/22 58.22 57.60 -0.62 0.39
26 17/3/22 58.37 57.60 -0.77 0.60
27 19/3/22 57.63 57.60 -0.03 0.00
28 21/3/22 58.07 57.60 -0.47 0.22 Column C Column A Column D
29 21/3/22 57.92 57.60 -0.32 0.10
30 22/3/22 57.18 57.60 0.42 0.17
31 22/3/22 57.77 57.60 -0.17 0.03
32 23/3/22 58.96 57.60 -1.36 1.86
33 23/3/22 57.62 57.60 -0.02 0.00
34 23/3/22 58.07 57.60 -0.47 0.22
35 23/3/22 57.33 57.60 0.27 0.07
36 24/3/22 56.88 57.60 0.72 0.51
37 25/3/22 58.22 57.60 -0.62 0.39
38 25/3/22 58.51 57.60 -0.91 0.83
39 25/3/22 56.44 57.60 1.16 1.34
40 25/3/22 58.36 57.60 -0.76 0.58
41 27/3/22 58.36 57.60 -0.76 0.58
42 27/3/22 57.33 57.60 0.27 0.07
43 28/3/22 57.10 57.60 0.50 0.25
44 29/3/22 57.03 57.60 0.57 0.32
45 29/3/22 59.99 57.60 -2.39 5.72
46 30/3/22 57.47 57.60 0.13 0.02

Averege compressive 57.60 N/mm2


strength
Maximum Value 59.99 N/mm2
Minimum Value 56.44 N/mm2
Standard Deviation 0.85 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From :3/3/2022 To:3/4/2022

GRADE OF CONCRETE M30 With 310kgsOPC ( 28 DAYS ) Mar-22

CUBE STRENGTH AVG DIFF


SL.NO Date of Testing (B-A)2 sq å(B-A)2)/(n-1)
A N/mm2 B N/mm2 B-A 0.268
1 3/3/2022 38.07 37.71 -0.36 0.13
STANDARD DEVIATION = 0.81 N/mm2
2 3/3/2022 39.56 37.71 -1.85 3.43
3 3/3/2022 39.56 37.71 -1.85 3.43
4 3/3/2022 40.15 37.71 -2.44 5.97
5 4/3/2022 34.56 37.71 3.15 9.90
6 4/3/2022 35.11 37.71 2.60 6.74 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 4/3/2022 35.26 37.71 2.45 5.99
8 4/3/2022 35.70 37.71 2.01 4.03
9 6/3/2022 41.48 37.71 -3.77 14.24 45.00 45.00
10 8/3/2022 39.48 37.71 -1.77 3.14 M30
Compressive strength

11 8/3/2022 39.48 37.71 -1.77 3.14 40.00


12 9/3/2022 37.63 37.71 0.08 0.01
40.00
13 9/3/2022 37.48 37.71 0.23 0.05
37.71 35.00
14 9/3/2022 35.35 2.36 5.55
15 9/3/2022 35.70 37.71 2.01 4.03
16 9/3/2022 35.20 37.71 2.51 6.28 30.00 35.00
0 10 20 30
17 9/3/2022 36.89 37.71 0.82 0.67
No.Of Samples
18 9/3/2022 37.92 37.71 -0.21 0.05
19 10/3/2022 38.36 37.71 -0.65 0.43 Column D Column C Column E
20 11/3/2022 39.26 37.71 -1.55 2.41
21 12/3/2022 38.96 37.71 -1.25 1.57
22 13/3/22 38.07 37.71 -0.36 0.13
23 15/3/22 40.29 37.71 -2.58 6.67
24 15/3/22 40.00 37.71 -2.29 5.26
20 15/3/22 39.85 37.71 -2.14 4.59
21 19/3/22 39.70 37.71 -1.99 3.97
22 23/3/22 35.10 37.71 2.61 6.80
23 24/3/22 36.29 37.71 1.42 2.01
24 25/3/22 34.95 37.71 2.76 7.60
20 27/3/22 35.84 37.71 1.87 3.48
21 30/3/22 38.51 37.71 -0.80 0.65
22 1/4/2022 41.03 37.71 -3.32 11.04
23 3/4/2022 36.14 37.71 1.57 2.45
24 3/4/2022 35.10 37.71 2.61 6.80

Averege compressive 37.71 N/mm2


strength

Maximum Value 41.48 N/mm2


Minimum Value 34.56 N/mm2
Standard Deviation 2.01 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From :24/1/2022 To:14/2/2022

GRADE OF CONCRETE M30 With 310kgsOPC ( 28 DAYS ) Mar-22

CUBE STRENGTH AVG DIFF


SL.NO Date of Testing (B-A)2 sq å(B-A)2)/(n-1)
A N/mm2 B N/mm2 B-A 0.116
1 3/4/2022 48.58 48.64 0.06 0.00
STANDARD DEVIATION = 0.81 N/mm2
2 3/4/2022 49.03 48.64 -0.39 0.15
3 3/4/2022 48.29 48.64 0.35 0.12
4 3/4/2022 48.47 48.64 0.17 0.03
5 3/4/2022 49.18 48.64 -0.54 0.29
6 3/4/2022 48.29 48.64 0.35 0.12 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7
8
9 45.00 45.00
10 40.00 M4
Compressive strength

35.00
11 30.00
0
12 25.00
40.00
13 20.00
15.00
14
10.00
15 5.00
16 0.00 35.00
0 10 20 30
17
No.Of Samples
18
19 Column D Column C Column E
20
21
22
23
24
25
26
27
28

Averege compressive 48.64 N/mm2


strength

Maximum Value 49.03 N/mm2


Minimum Value 48.29 N/mm2
Standard Deviation 0.38 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From :24/1/2022 To:14/2/2022

GRADE OF CONCRETE M30 With 310kgsOPC ( 28 DAYS ) Feb-22

CUBE STRENGTH AVG DIFF


SL.NO Date of Testing (B-A)2 sq å(B-A)2)/(n-1)
A N/mm2 B N/mm2 B-A 0.265
1 14/2/22 35.99 35.88 -0.11 0.01
STANDARD DEVIATION = 0.81 N/mm2
2 16/2/22 35.40 35.88 0.48 0.23
3 18/2/22 35.84 35.88 0.04 0.00
4 22/2/22 35.84 35.88 0.04 0.00
5 27/2/22 35.11 35.88 0.77 0.59
6 27/2/22 35.84 35.88 0.04 0.00 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 27/2/22 36.43 35.88 -0.55 0.31
8 27/2/22 35.99 35.88 -0.11 0.01
9 27/2/22 36.44 35.88 -0.56 0.32 45.00 45.00
10 3/3/2022 38.07 35.88 -2.19 4.82 40.00 M30
Compressive strength

35.00
11 3/3/2022 39.56 35.88 -3.68 13.58 30.00
12 3/3/2022 39.56 35.88 -3.68 13.58 25.00
40.00
13 3/3/2022 40.15 35.88 -4.27 18.27 20.00
35.88 15.00
14 4/3/2022 34.56 1.32 1.73
10.00
15 4/3/2022 35.11 35.88 0.77 0.59 5.00
16 4/3/2022 35.26 35.88 0.62 0.38 0.00 35.00
0 10 20 30
17 4/3/2022 35.70 35.88 0.18 0.03
No.Of Samples
18 6/3/2022 41.48 35.88 -5.60 31.41
19 8/3/2022 39.48 35.88 -3.60 12.99 Column D Column C Column E
20 8/3/2022 39.48 35.88 -3.60 12.99
21 9/3/2022 37.63 35.88 -1.75 3.08
22 9/3/2022 37.48 35.88 -1.60 2.57
23 9/3/2022 35.35 35.88 0.53 0.28
24 9/3/2022 35.70 35.88 0.18 0.03

Averege compressive 35.88 N/mm2


strength

Maximum Value 35.99 N/mm2


Minimum Value 35.40 N/mm2
Standard Deviation 1.96 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From :1/1/2022 To:25/2/2022

GRADE OF CONCRETE M50 With 450kgsOPC+40 kgs of Alcofines ( 28 DAYS ) Feb'22

CUBE STRENGTH AVG DIFF sq å(B-A)2)/(n-1)


SL.NO Date of Testing (B-A)2
A N/mm 2
B N/mm 2 B-A 0.121
1 26/2/22 58.51 58.14 -0.37 0.14
STANDARD DEVIATION = 1.62 N/mm2
2 27/2/22 57.77 58.14 0.37 0.14
3 58.14 0.72 0.52
4 58.14 0.87 0.76
5 58.14 3.33 11.09
6 58.14 0.07 0.00 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 58.14 0.54 0.29
8 58.14 0.66 0.44 65.00 65
9 58.14 1.36 1.85
Compressive strength

10 58.14 1.40 1.96 60.00 60


11 58.14 0.66 0.44 M50
12 58.14 2.00 4.00 55.00 55

13 58.14 2.29 5.24


58.14 50.00 50
14 1.70 2.89
15 58.14 0.37 0.14
45.00 45
16 58.14 2.59 6.71 0 10 20 30 40
17 58.14 1.85 3.42 No.Of Samples
18 58.14 0.95 0.90
19 58.14 -0.82 0.67 Column C Column A Column D
20 58.14 0.37 0.14
21 58.14 0.07 0.00
22 58.14 -0.37 0.14
23 58.14 0.22 0.05
24 58.14 -2.15 4.62
25 58.14 0.37 0.14
26 58.14 -0.34 0.12
27 58.14 -0.08 0.01
28 58.14 -0.23 0.05
29 58.14 0.51 0.26
30 58.14 0.07 0.00

Averege compressive 58.14 N/mm2


strength
Maximum Value 58.51 N/mm2
Minimum Value 57.77 N/mm2
Standard Deviation 0.52 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From :24/1/2022 To:14/2/2022

GRADE OF CONCRETE M30 With 310kgsOPC ( 28 DAYS ) Feb-22

CUBE STRENGTH AVG DIFF


SL.NO Date of Testing (B-A)2 sq å(B-A)2)/(n-1)
A N/mm2 B N/mm2 B-A 0.136
1 24/1/22 35.70 36.11 0.41 0.17
STANDARD DEVIATION = 0.81 N/mm2
2 26/1/22 35.84 36.11 0.27 0.07
3 26/1/22 35.70 36.11 0.41 0.17
4 27/1/22 35.40 36.11 0.71 0.50
5 27/1/22 35.84 36.11 0.27 0.07
6 27/1/22 35.99 36.11 0.12 0.01 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 27/1/22 36.29 36.11 -0.18 0.03
8 28/1/22 36.59 36.11 -0.48 0.23
9 1/2/2022 37.62 36.11 -1.51 2.29 45.00 45.00
10 3/2/2022 35.99 36.11 0.12 0.01 40.00 M30
Compressive strength

35.00
11 3/2/2022 35.99 36.11 0.12 0.01 30.00
12 3/2/2022 34.81 36.11 1.30 1.68 25.00
40.00
13 4/2/2022 36.29 36.11 -0.18 0.03 20.00
36.11 15.00
14 5/2/2022 35.69 0.42 0.17
10.00
15 6/2/2022 36.29 36.11 -0.18 0.03 5.00
16 6/2/2022 36.14 36.11 -0.03 0.00 0.00 35.00
0 10 20 30
17 7/2/2022 35.99 36.11 0.12 0.01
No.Of Samples
18 7/2/2022 36.58 36.11 -0.47 0.22
19 9/2/2022 35.85 36.11 0.26 0.07 Column D Column C Column E
20 13/2/22 36.14 36.11 -0.03 0.00
21 23/2/22 35.84 36.11 0.27 0.07
22 13/2/22 36.58 36.11 -0.47 0.22
23 13/2/22 35.85 36.11 0.26 0.07
24 14/2/22 35.84 36.11 0.27 0.07

Averege compressive 36.11 N/mm2


strength

Maximum Value 35.84 N/mm2


Minimum Value 35.40 N/mm2
Standard Deviation 0.52 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From :1/1/2022 To:25/2/2022

GRADE OF CONCRETE M50 With 450kgsOPC+40 kgs of Alcofines ( 28 DAYS ) Feb'22

CUBE STRENGTH AVG DIFF sq å(B-A)2)/(n-1)


SL.NO Date of Testing (B-A)2
A N/mm 2
B N/mm 2 B-A 0.097
1 27/1/2022 58.51 58.51 0.00 0.00
STANDARD DEVIATION = 1.62 N/mm2
2 29/1/2022 58.96 58.51 -0.45 0.20
3 3/2/2022 57.77 58.51 0.74 0.55
4 3/2/2022 59.10 58.51 -0.59 0.35
5 3/2/2022 58.07 58.51 0.44 0.20
6 3/2/2022 58.66 58.51 -0.15 0.02 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 6/2/2022 58.36 58.51 0.15 0.02
8 8/2/2022 58.96 58.51 -0.45 0.20 65.00 65
9 8/2/2022 58.07 58.51 0.44 0.20
Compressive strength

10 10/2/2022 58.66 58.51 -0.15 0.02 60.00 60


11 11/2/2022 58.66 58.51 -0.15 0.02 M50
12 12/2/2022 58.22 58.51 0.29 0.09 55.00 55

13 12/2/2022 58.66 58.51 -0.15 0.02


58.51 50.00 50
14 13/2/2022 58.66 -0.15 0.02
15 14/2/2022 58.36 58.51 0.15 0.02
45.00 45
16 17/2/2022 58.36 58.51 0.15 0.02 0 10 20 30 40
17 17/2/2022 58.81 58.51 -0.30 0.09 No.Of Samples
18 17/2/2022 58.07 58.51 0.44 0.20
19 17/2/2022 58.51 58.51 0.00 0.00 Column C Column A Column D
20 21/2/2022 58.22 58.51 0.29 0.09
21 21/2/2022 58.96 58.51 -0.45 0.20
22 22/2/2022 58.07 58.51 0.44 0.20
23 24/2/2022 58.81 58.51 -0.30 0.09
24 24/2/2022 58.51 58.51 0.00 0.00
25 24/2/2022 58.22 58.51 0.29 0.09
26 24/2/2022 58.36 58.51 0.15 0.02
27 24/2/2022 58.36 58.51 0.15 0.02
28 25/2/2022 58.96 58.51 -0.45 0.20
29 25/2/2022 58.51 58.51 0.00 0.00
30 25/2/2022 58.66 58.51 -0.15 0.02

Averege compressive 58.51 N/mm2


strength
Maximum Value 59.10 N/mm2
Minimum Value 57.77 N/mm2
Standard Deviation 0.34 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From :1/1/2022 To:21/1/2022

GRADE OF CONCRETE M30 With 310kgsOPC ( 28 DAYS ) Jan-21

CUBE STRENGTH AVG DIFF


SL.NO Date of Testing (B-A)2 sq å(B-A)2)/(n-1)
A N/mm2 B N/mm2 B-A 0.119
1 1/1/2022 35.84 35.73 -0.11 0.01
STANDARD DEVIATION = 0.81 N/mm2
2 1/1/2021 35.10 35.73 0.63 0.39
3 2/1/2022 35.99 35.73 -0.26 0.07
4 4/1/2022 35.69 35.73 0.04 0.00
5 5/1/2022 35.70 35.73 0.03 0.00
6 6/1/2022 36.14 35.73 -0.41 0.17 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 8/1/2022 35.69 35.73 0.04 0.00
8 8/1/2022 35.40 35.73 0.33 0.11
9 8/1/2022 35.99 35.73 -0.26 0.07 45.00 45.00
10 8/1/2022 35.25 35.73 0.48 0.23 40.00 M30
Compressive strength

35.00
11 8/1/2022 35.40 35.73 0.33 0.11 30.00
12 9/1/2022 36.44 35.73 -0.71 0.51 25.00
40.00
13 9/1/2022 35.84 35.73 -0.11 0.01 20.00
35.73 15.00
14 10/1/2022 35.25 0.48 0.23
10.00
15 10/1/2022 35.84 35.73 -0.11 0.01 5.00
16 12/1/2022 35.69 35.73 0.04 0.00 0.00 35.00
0 10 20 30
17 16/1/22 35.99 35.73 -0.26 0.07
No.Of Samples
18 16/1/22 35.40 35.73 0.33 0.11
19 17/1/22 36.29 35.73 -0.56 0.32 Column D Column C Column E
20 18/1/22 35.40 35.73 0.33 0.11
21 18/1/22 35.99 35.73 -0.26 0.07
22 19/1/22 35.99 35.73 -0.26 0.07
23 19/1/22 36.73 35.73 -1.00 1.01
24 21/1/22 35.84 35.73 -0.11 0.01

Averege compressive 35.73 N/mm2


strength

Maximum Value 35.99 N/mm2


Minimum Value 35.10 N/mm2
Standard Deviation 0.40 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From :19/12/2021 To:1/1/2022

GRADE OF CONCRETE M50 With 450kgsOPC+40 kgs of Alcofines ( 28 DAYS ) Jan-21

CUBE STRENGTH AVG DIFF sq å(B-A)2)/(n-1)


SL.NO Date of Testing (B-A)2
A N/mm 2
B N/mm 2 B-A 0.097
1 19/12/21 57.77 58.43 0.66 0.44
STANDARD DEVIATION = 1.62 N/mm2
2 19/12/21 58.81 58.43 -0.38 0.14
3 19/12/21 57.77 58.43 0.66 0.44
4 19/12/21 58.51 58.43 -0.08 0.01
5 21/12/21 58.81 58.43 -0.38 0.14
6 21/12/21 58.36 58.43 0.07 0.01 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 22/12/21 58.96 58.43 -0.53 0.28
8 22/12/21 57.77 58.43 0.66 0.44 65.00 65
9 22/12/21 58.36 58.43 0.07 0.01
Compressive strength

10 23/12/21 58.96 58.43 -0.53 0.28 60.00 60


11 24/12/21 58.51 58.43 -0.08 0.01 M50
12 24/12/21 58.22 58.43 0.21 0.05 55.00 55

13 24/12/21 58.51 58.43 -0.08 0.01


58.43 50.00 50
14 24/12/21 58.66 -0.23 0.05
15 25/12/21 58.51 58.43 -0.08 0.01
45.00 45
16 25/12/21 58.36 58.43 0.07 0.01 0 10 20 30 40
17 25/12/21 58.66 58.43 -0.23 0.05 No.Of Samples
18 26/12/21 58.07 58.43 0.36 0.13
19 27/12/21 58.51 58.43 -0.08 0.01 Column C Column A Column D
20 27/12/21 58.96 58.43 -0.53 0.28
21 28/12/21 58.51 58.43 -0.08 0.01
22 28/12/21 58.22 58.43 0.21 0.05
23 29/12/21 58.51 58.43 -0.08 0.01
24 29/12/21 58.36 58.43 0.07 0.01
25 29/12/21 58.66 58.43 -0.23 0.05
26 29/12/21 58.66 58.43 -0.23 0.05
27 29/12/21 58.51 58.43 -0.08 0.01
28 30/12/21 58.66 58.43 -0.23 0.05
29 30/12/21 58.21 58.43 0.22 0.05
30 1/1/2022 58.22 58.43 0.21 0.05

Averege compressive 58.43 N/mm2


strength
Maximum Value 58.96 N/mm2
Minimum Value 57.77 N/mm2
Standard Deviation 0.34 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From :18/11/2021 To:15/12/2021

GRADE OF CONCRETE M50 With 450kgsOPC+40 kgs of Alcofines ( 28 DAYS ) Dec-21

CUBE STRENGTH AVG DIFF sq å(B-A)2)/(n-1)


SL.NO Date of Testing (B-A)2
A N/mm 2
B N/mm 2 B-A 0.105
1 18/11/21 58.66 58.47 -0.19 0.03
STANDARD DEVIATION = 1.62 N/mm2
2 19/11/21 58.22 58.47 0.25 0.06
3 20/11/21 57.77 58.47 0.70 0.49
4 22/11/21 58.81 58.47 -0.34 0.11
5 22/11/21 58.07 58.47 0.40 0.16
6 23/11/21 58.66 58.47 -0.19 0.03 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 23/11/21 58.81 58.47 -0.34 0.11
8 23/11/21 57.92 58.47 0.55 0.31 65.00 65
9 25/11/21 58.66 58.47 -0.19 0.03
Compressive strength

10 25/11/21 58.36 58.47 0.11 0.01 60.00 60


11 25/11/21 59.11 58.47 -0.64 0.41 M50
12 25/11/21 58.66 58.47 -0.19 0.03 55.00 55

13 25/11/21 58.22 58.47 0.25 0.06


58.47 50.00 50
14 26/11/21 58.66 -0.19 0.03
15 27/11/21 58.51 58.47 -0.04 0.00
45.00 45
16 28/11/21 58.07 58.47 0.40 0.16 0 10 20 30 40
17 30/11/21 58.36 58.47 0.11 0.01 No.Of Samples
18 30/11/21 58.36 58.47 0.11 0.01
19 4/12/2021 58.66 58.47 -0.19 0.03 Column C Column A Column D
20 4/12/2021 58.22 58.47 0.25 0.06
21 4/12/2021 58.96 58.47 -0.49 0.24
22 4/12/2021 58.07 58.47 0.40 0.16
23 5/12/2021 59.55 58.47 -1.08 1.16
24 5/12/2021 58.36 58.47 0.11 0.01
25 8/12/2021 58.07 58.47 0.40 0.16
26 10/12/2021 58.66 58.47 -0.19 0.03
27 11/12/2021 58.51 58.47 -0.04 0.00
28 11/12/2021 58.07 58.47 0.40 0.16
29 13/12/21 58.22 58.47 0.25 0.06
30 15/12/21 58.51 58.47 -0.04 0.00

Averege compressive 58.47 N/mm2


strength
Maximum Value 59.55 N/mm2
Minimum Value 57.77 N/mm2
Standard Deviation 0.40 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From :23/09/2021 To:28/12/2021

GRADE OF CONCRETE M30 With 310kgsOPC ( 28 DAYS ) Dec-21

CUBE STRENGTH AVG DIFF


SL.NO Date of Testing (B-A)2 sq å(B-A)2)/(n-1)
A N/mm2 B N/mm2 B-A 0.130
1 23/9/21 35.69 35.84 0.15 0.02
STANDARD DEVIATION = 0.81 N/mm2
2 24/9/21 35.40 35.84 0.44 0.20
3 24/9/21 35.25 35.84 0.59 0.35
4 24/9/21 36.88 35.84 -1.04 1.07
5 24/9/21 35.70 35.84 0.14 0.02
6 24/9/21 36.59 35.84 -0.75 0.56 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 24/9/21 36.29 35.84 -0.45 0.20
8 25/9/21 35.25 35.84 0.59 0.35
9 28/9/21 35.55 35.84 0.29 0.09 45.00 45.00
10 6/10/2021 35.25 35.84 0.59 0.35 40.00 M30
Compressive strength

35.00
11 8/10/2021 35.99 35.84 -0.15 0.02 30.00
12 8/10/2021 36.44 35.84 -0.60 0.35 25.00
40.00
13 8/10/2021 35.84 35.84 0.00 0.00 20.00
35.84 15.00
14 8/10/2021 36.44 -0.60 0.35
10.00
15 8/10/2021 35.99 35.84 -0.15 0.02 5.00
16 14/10/21 35.99 35.84 -0.15 0.02 0.00 35.00
0 10 20 30
17 11/16/2021 35.55 35.84 0.29 0.09
No.Of Samples
18 11/16/2021 35.99 35.84 -0.15 0.02
19 11/19/2021 36.29 35.84 -0.45 0.20 Column D Column C Column E
20 11/20/2021 35.84 35.84 0.00 0.00
21 25/11/21 34.96 35.84 0.88 0.78
22 28/11/21 35.40 35.84 0.44 0.20
23 28/11/21 35.84 35.84 0.00 0.00
24 6/12/2021 35.84 35.84 0.00 0.00
25 7/12/2021 35.25 35.84 0.59 0.35
26 7/12/2021 36.73 35.84 -0.89 0.78
27 10/12/2021 35.69 35.84 0.15 0.02
28 13/12/21 35.84 35.84 0.00 0.00
29 18/12/21 35.84 35.84 0.00 0.00
30 28/12/21 35.69 35.84 0.15 0.02

Averege compressive 35.84 N/mm2


strength

Maximum Value 36.88 N/mm2


Minimum Value 35.25 N/mm2
Standard Deviation 0.47 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From :10/09/2021 To:4/11/2021

GRADE OF CONCRETE M40 With 450kgsOPC+40 kgs of Alcofines ( 28 DAYS ) Nov-21

CUBE STRENGTH AVG DIFF sq å(B-A)2)/(n-1)


SL.NO Date of Testing (B-A)2
A N/mm 2
B N/mm 2 B-A 0.098
1 10/9/2021 49.03 48.81 -0.22 0.05
STANDARD DEVIATION = 1.62 N/mm2
2 10/9/2021 48.59 48.81 0.22 0.05
3 10/9/2021 48.10 48.81 0.71 0.50
4 10/9/2021 49.33 48.81 -0.52 0.27
5 10/9/2021 48.44 48.81 0.37 0.14
6 10/9/2021 48.44 48.81 0.37 0.14 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 11/9/2021 48.73 48.81 0.08 0.01
8 11/9/2021 49.33 48.81 -0.52 0.27 65.00 65
9 17/9/21 48.73 48.81 0.08 0.01
Compressive strength

10 23/9/21 48.44 48.81 0.37 0.14 60.00 60


11 30/9/21 49.47 48.81 -0.66 0.44 M40
12 30/9/21 49.03 48.81 -0.22 0.05 55.00 55

13 30/9/21 49.03 48.81 -0.22 0.05


48.81 50.00 50
14 30/9/21 48.58 0.23 0.05
15 1/10/2021 48.88 48.81 -0.07 0.00
45.00 45
16 1/10/2021 48.73 48.81 0.08 0.01 0 10 20 30 40
17 12/10/2021 48.88 48.81 -0.07 0.00 No.Of Samples
18 11/2/2021 48.44 48.81 0.37 0.14
19 11/2/2021 48.58 48.81 0.23 0.05 Column C Column A Column D
20 11/2/2021 48.59 48.81 0.22 0.05
21 11/2/2021 48.88 48.81 -0.07 0.00
22 11/2/2021 48.44 48.81 0.37 0.14
23 11/3/2021 48.29 48.81 0.52 0.27
24 11/3/2021 48.29 48.81 0.52 0.27
25 11/4/2021 48.58 48.81 0.23 0.05
26 11/4/2021 48.88 48.81 -0.07 0.00

Averege compressive 48.81 N/mm2


strength
Maximum Value 49.33 N/mm2
Minimum Value 48.10 N/mm2
Standard Deviation 0.34 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From :25/10/2021 To:17/11/2021

GRADE OF CONCRETE M50 With 450kgsOPC+40 kgs of Alcofines ( 28 DAYS ) Nov-21

CUBE STRENGTH AVG DIFF sq å(B-A)2)/(n-1)


SL.NO Date of Testing (B-A)2
A N/mm 2
B N/mm 2 B-A 0.097
1 10/25/2021 57.47 58.10 0.63 0.39
STANDARD DEVIATION = 1.62 N/mm2
2 10/25/2021 57.32 58.10 0.78 0.60
3 10/26/2021 58.36 58.10 -0.26 0.07
4 10/27/2021 57.92 58.10 0.18 0.03
5 10/28/2021 58.36 58.10 -0.26 0.07
6 10/28/2021 58.22 58.10 -0.12 0.02 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 10/29/2021 58.51 58.10 -0.41 0.17
8 10/29/2021 58.51 58.10 -0.41 0.17 65.00 65
9 11/1/2021 58.66 58.10 -0.56 0.32
Compressive strength

10 11/1/2021 58.22 58.10 -0.12 0.02 60.00 60


11 11/2/2021 57.92 58.10 0.18 0.03 M50
12 11/2/2021 58.07 58.10 0.03 0.00 55.00 55

13 11/3/2021 57.92 58.10 0.18 0.03


58.10 50.00 50
14 11/5/2021 58.22 -0.12 0.02
15 11/5/2021 57.77 58.10 0.33 0.11
45.00 45
16 11/5/2021 58.22 58.10 -0.12 0.02 0 10 20 30 40
17 11/6/2021 58.22 58.10 -0.12 0.02 No.Of Samples
18 11/6/2021 58.66 58.10 -0.56 0.32
19 11/8/2021 57.77 58.10 0.33 0.11 Column C Column A Column D
20 11/8/2021 58.51 58.10 -0.41 0.17
21 11/8/2021 58.21 58.10 -0.11 0.01
22 11/8/2021 58.51 58.10 -0.41 0.17
23 11/9/2021 58.22 58.10 -0.12 0.02
24 11/9/2021 58.21 58.10 -0.11 0.01
25 11/10/2021 57.77 58.10 0.33 0.11
26 11/13/2021 58.22 58.10 -0.12 0.02
27 11/14/2021 58.21 58.10 -0.11 0.01
28 11/14/2021 58.22 58.10 -0.12 0.02
29 11/15/2021 58.36 58.10 -0.26 0.07
30 11/17/2021 58.36 58.10 -0.26 0.07

Averege compressive 58.10 N/mm2


strength
Maximum Value 58.66 N/mm2
Minimum Value 57.32 N/mm2
Standard Deviation 0.34 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From :04/09/2021 To:21/10/2021

GRADE OF CONCRETE M50 With 450kgsOPC+40 kgs of Alcofines ( 28 DAYS ) Oct-21

CUBE STRENGTH AVG DIFF sq å(B-A)2)/(n-1)


SL.NO Date of Testing (B-A)2
A N/mm 2
B N/mm 2 B-A 0.085
1 4/9/2021 58.22 58.30 0.08 0.01
STANDARD DEVIATION = 1.62 N/mm2
2 6/9/2021 58.51 58.30 -0.21 0.05
3 6/9/2021 58.22 58.30 0.08 0.01
4 7/9/2021 58.66 58.30 -0.36 0.13
5 7/9/2021 58.22 58.30 0.08 0.01
6 10/9/2021 58.22 58.30 0.08 0.01 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 13/9/21 57.77 58.30 0.53 0.28
8 14/9/21 58.36 58.30 -0.06 0.00 65.00 65
9 14/9/21 58.51 58.30 -0.21 0.05
Compressive strength

10 14/9/21 58.21 58.30 0.09 0.01 60.00 60


11 16/9/21 58.22 58.30 0.08 0.01 M50
12 18/9/21 58.51 58.30 -0.21 0.05 55.00 55

13 23/9/21 58.22 58.30 0.08 0.01


58.30 50.00 50
14 26/9/21 57.92 0.38 0.14
15 26/9/21 58.66 58.30 -0.36 0.13
45.00 45
16 28/9/21 57.77 58.30 0.53 0.28 0 10 20 30 40
17 1/10/2021 57.92 58.30 0.38 0.14 No.Of Samples
18 1/10/2021 58.22 58.30 0.08 0.01
19 6/10/2021 58.07 58.30 0.23 0.05 Column C Column A Column D
20 7/10/2021 58.36 58.30 -0.06 0.00
21 7/10/2021 57.77 58.30 0.53 0.28
22 8/10/2021 58.36 58.30 -0.06 0.00
23 8/10/2021 58.36 58.30 -0.06 0.00
24 13/10/21 58.22 58.30 0.08 0.01
25 14/10/21 58.66 58.30 -0.36 0.13
26 19/10/21 58.21 58.30 0.09 0.01
27 19/10/21 59.10 58.30 -0.80 0.65
28 19/10/21 58.22 58.30 0.08 0.01
29 20/10/21 58.07 58.30 0.23 0.05
30 21/10/21 58.96 58.30 -0.66 0.44

Averege compressive 58.30 N/mm2


strength
Maximum Value 59.10 N/mm2
Minimum Value 57.77 N/mm2
Standard Deviation 0.26 N/mm2
CREATIVE PROJECTS & CONSTRUCTION PVTR LTD

Project: Sattva Endeavur


Client: M/s.Salarpuria Real Estate Private Limited.
Consultant: M/s.Innotech Engineering Consult Pvt.Ltd.
Standard Deviation

Duration of Results :: From :24/05/2021 To:03208/2021

GRADE OF CONCRETE M50 With 450kgsOPC+40 kgs of Alcofines ( 28 DAYS ) Jul-21

CUBE STRENGTH AVG DIFF sq å(B-A)2)/(n-1)


SL.NO Date of Testing (B-A)2
A N/mm 2
B N/mm 2 B-A #REF!
1 23/8/21 58.66 58.29 -0.37 0.14
STANDARD DEVIATION = 1.62 N/mm2
2 24/8/21 58.66 58.29 -0.37 0.14
3 25/8/21 57.92 58.29 0.37 0.14
4 25/8/21 58.22 58.29 0.07 0.00
5 26/8/21 58.36 58.29 -0.07 0.00
6 27/8/21 58.21 58.29 0.08 0.01 * The suggested value of standered diviation of concrete. As per IS 456 is 5 N/mm2
7 28/8/21 58.22 58.29 0.07 0.00
8 29/8/21 58.66 58.29 -0.37 0.14 65.00 65
9 29/8/21 58.36 58.29 -0.07 0.00
Compressive strength

10 30/8/21 58.36 58.29 -0.07 0.00 60.00 60


11 30/8/21 58.07 58.29 0.22 0.05 M50
12 31/8/21 57.77 58.29 0.52 0.27 55.00 55

13 31/8/21 58.36 58.29 -0.07 0.00


58.29 50.00 50
14 31/8/21 58.07 0.22 0.05
15 1/9/2021 58.36 58.29 -0.07 0.00
45.00 45
16 4/9/2021 58.22 58.29 0.07 0.00 0 10 20 30 40
17 6/9/2021 58.51 58.29 -0.22 0.05 No.Of Samples
18 6/9/2021 58.22 58.29 0.07 0.00
19 7/9/2021 58.66 58.29 -0.37 0.14 Column C Column A Column D
20 7/9/2021 58.22 58.29 0.07 0.00
21 10/9/2021 58.22 58.29 0.07 0.00
22 13/9/21 57.77 58.29 0.52 0.27
23 14/9/21 58.36 58.29 -0.07 0.00
24 14/9/21 58.51 58.29 -0.22 0.05
25 14/9/21 58.21 58.29 0.08 0.01
26 16/9/21 58.22 58.29 0.07 0.00
27 18/9/21 58.51 58.29 -0.22 0.05
28 23/9/21 58.22 58.29 0.07 0.00
29 26/9/21 57.92 58.29 0.37 0.14
30 26/9/21 58.66 58.29 -0.37 0.14

Averege compressive 58.29 N/mm2


strength
Maximum Value 58.66 N/mm2
Minimum Value 57.77 N/mm2
Standard Deviation 0.24 N/mm2

You might also like