Project: Express train project Date: 01 April 2023 / ACTIVITY: Express train project PERSONS INVOLVED: GIECO Crew
Prepared by: Mr. Mostafa Mousa (Team Leader) Revised by: Eng. Mahmoud Saad (Sector Manager) Approved by: Eng. Tamer Hemdan (QHSE Director)
UNCONTROLLED
RISK RANK
S=severity
ACTION RESIDUAL RISK
L=Likelihood
HAZARD Hazard effect CONTROLS REQUIRED
R=S*P
RR=risk rate
EXPECTED
S L R RR RESPONSIBLE PERSON S P R RR
DATE
- Cranes must be certified and fit for
intended operations.
- Cranes must be positioned on level
ground which has been assessed as
suitable for the subjected load bearing
capabilities.
- All outriggers must be fully extended
and the cranes levelled as per
manufacturer's instructions.
- Possible single - The cranes must be configured to the
- Site Manager/Engineer
1. Crane becomes fatality manufacturer specification.
- Equipment supervisor.
unstable and - Injuries for 5 4 20 NC - Ensure crane load chart. -------------- 5 1 5 T
- Lifting Supervisor
tips over employees - Ensure the license of crane operator.
- HSE Supervisor
- Damage to - Ensure from hard barriers around work
equipment area, restrict access to authorized
personnel only.
- Lifted loads must not be transferred
above personnel.
- The cranes safe load indicator must be
calibrated and be accurate to within the
manufactures recommended tolerance.
- The cranes safe operating radius must
not be exceeded.
- The cranes must be operated smoothly
and all necessary precautions taken to
avoid crane shock loading
- The designated Supervisor shall be
responsible for overseeing the
Operations.
- All personnel must be trained and
educated about these control measures.
- Applying PTW and lifting plan.
- Applying rescue plan in case of
emergency case.
- Provide the appropriate PPE for all
workers.
1. Weather condition
(rain/storm/wind
speed/high swell). - in case of unstable weather diving
Lack of awareness of operation must stop more than 20 kt - Diving supervisor
the rules and Diver injury /damage of 5 3 15 H - Site Engineer -------------- 5 1 5 T
procedure in bad diving equipment. - review weather condition daily with
- HSE Supervisor
weather. safety diving.
4. Loss of
communication
between diving - maintain diving equipment/ follow up
supervisor and diver. diving equipment checklist. - HSE Supervisor
Using unsafe diving diver injury / fatality for 5 3 15 H - Diving supervisor -------------- 5 1 5 T
equipment with no diver /emergency. - diving safety to follow up certificate
- Site Engineer
maintenance / no equipment and check list.
maintain for
connection.
) ةيلامتحلااLikelihood(
1-5 Minor
None T (Trivial) 10 8 6 4 2 2 Possible 2 طيسب ررض 2
ثودحلا
) ةميقلاValue(
) ةميقلاValue(
Injury
Supervi طسوتم High
sion M (Medium) 6-10 15 12 9 6 3 3 Likely ثودحلا 3 Injury ريبك ررض 3
+Contr 12- Very Major
ols H (High) 16 20 16 12 8 4 4 ثودحلا ريتك 4 ديدش ررض 4
Likely Injury
N (Not 20-
NC
Acceptable) 25 25 20 15 10 5 5 Imminent كيشو 5 Fatality لتاق ررض 5