The document is an estimate from Samu Engineering and Contractors for civil work at a site in Pallavaram for a client called The Plank. It includes 6 items: 1) waterproofing bathroom walls and floors, 2) laying brick jelly in toilet, 3) electrical touchups, 4) laying floor tiles in bathroom, 5) laying wall panels in bathroom, and 6) laying wall tiles in a herringbone pattern. The total area and rates are provided for each item and the estimate is exclusive of GST if applicable.
The document is an estimate from Samu Engineering and Contractors for civil work at a site in Pallavaram for a client called The Plank. It includes 6 items: 1) waterproofing bathroom walls and floors, 2) laying brick jelly in toilet, 3) electrical touchups, 4) laying floor tiles in bathroom, 5) laying wall panels in bathroom, and 6) laying wall tiles in a herringbone pattern. The total area and rates are provided for each item and the estimate is exclusive of GST if applicable.
The document is an estimate from Samu Engineering and Contractors for civil work at a site in Pallavaram for a client called The Plank. It includes 6 items: 1) waterproofing bathroom walls and floors, 2) laying brick jelly in toilet, 3) electrical touchups, 4) laying floor tiles in bathroom, 5) laying wall panels in bathroom, and 6) laying wall tiles in a herringbone pattern. The total area and rates are provided for each item and the estimate is exclusive of GST if applicable.
(specialised in Building Construction,Renovation & Expansion)
10/148 THERUVEETHIAMMAN KOIL 3RD STREET,AYYAPPANTHANGALCHENNAI-600122 GST NO:33BYJPA3932R1Z5 PROPERTIER:A.ARAVIND KUMAR MOBILE:9710009599 CLIENT: The plank SITE: ALLIANCE, Pallavaram Description UNIT Sl No Area RATE CIVIL WORK water proofing on bathroom with 2 coats of brush 1 sqft 216.25 70.00 bond in vertically and horizontally Supply and laying of brick jelly in the ratio of 2 cft 22 210.00 1:5:10 on toilet inluding dampering,finishing etc 3 Electrical touchups with material Lsm - Laying of floor tile of bathroom with given tile in a 4 bed of 1:5 cement mortor with necessary sqft 44 75.00 spacer/grout etc., Laying of Wall on bathroom in myk latercrete 5 adhsive in the ratio of 1:3 including matchable sqft 172.25 80.00 grout. Laying of wall tile in Harringbone pattern in 6 adhesive in a ratio of 1:3 including sqft 108 90.00 pointing,cleaning , grouting etc.,