Description of Item of Work: White Washing With Lime To Give An Even Shade
Description of Item of Work: White Washing With Lime To Give An Even Shade
4 117052 Old work (one or more coats) 500 Sqm 4.98 2490.00
5 117073 Old work (one or more coats) with lime 1000 Sqm 5.05 5050.00
Total= 377356.00
Add 11.10% below SOR 2010= 41886.516
G/Total= 335469.48
The work herein mentioned are required to be complete on or before (date) 30.06.2021. The quantities provided
herein are approximate and subject to variation under clause 42 of the General Condition of Contract.
Work Order Under Zone Cantract.
Work Order No. Date
Name of Work- Repair to w/washing & c/washing MNQ to FBD Station Under ADEN/NCR/FZD.
Authority -Sr. DEN/IV/ALD Letter no. 74-w 10263/Bills/Date 06.08.21 DOC-30.06.2022
The Contracter -M/S Vimal Kumar Contractor,New sanjay nagar Etah-207001 U.P
SL NO. SOR Description of Item of Work QTY. Unit Rate Amount
111040 12 mm cement plaster of mix - KOZ Gate no. 221,22,3B ,38 ,MNQ
1 111041 1:4 (1cement: 4coarse sand) Station ,Circulating area, s/building , GRP
Thana, S/qtrs etc.
2 115080 Finishing walls with Deluxe Multi surface TAKHA Station , koz station, MNQ S/building,
paint system for interiors and exteriors Circulating area , running room etc
using Primer as per manufacturers
specifications with two or more coats
3 115110 applied
Finishing@walls
1.25ltr/10 sqm over
with water and
proofing BUBT Station, koz station, AON station , TAKHA
including one coat of Special primer
cement paint of required shade two or station , gate no. 22,24,29, TNUE
applied @ 0.75
more coats ltr/10sqm
on new work applied @ 3.84 Station ,35,3B,38,MNQ S/building etc.
Kg/10 sqm
117050 White washing with lime to give an even BUBT station, Aon station, TAKHA station,
shade KOZ station, gate no. 22,24,29, TNUE
4 117052 Old work (one or more coats) Station ,35,3B,38,S/building , Circulating
area etc
117070 Colour washing such as green, blue or buff to BUBT station, Aon station, TAKHA station,
give an even shade KOZ station, gate no. 22,24,29, TNUE
5 117073 Old work (one or more coats) with lime Station ,35,3B,38,S/building , Circulating
area etc.
The work herein mentioned are required to be complete on or before (date) 30.06.2022. The quantities provided
herein are approximate and subject to variation under clause 42 of the General Condition of Contract.
Contractor SSE/W/FZD ADEN/NCR/FZD
Divisional Engineer N.C.
Railway For President of India Date.
Work Order Under Zone Cantract.
Work Order No. 03 Date
Name of Work- Repair to w/washing & c/washing Station building S/Qtrs MNQ to FBD
Under ADEN/NCR/FZD.
Authority -Sr. DEN/IV/ALD Letter no. 74-w 10263/Bills/Date 06.08.21 DOC-30.06.2022
The Contracter -M/S Vimal Kumar Contractor,New sanjay nagar Etah-207001 U.P
SL NO. SOR Description of Item of Work QTY. Unit Rate Amount
111040 12 mm cement plaster of mix -
1 111041 1:4 (1cement: 4coarse sand) 1000 Sqm 62.37 62370.00
2 115080 Finishing walls with Deluxe Multi 3500 Sqm 81.29 284515.00
surface paint system for interiors and
exteriors using Primer as per
manufacturers specifications with two
or more coats applied @ 1.25ltr/10 sqm
over and including one coat of Special
primer applied @ 0.75 ltr/10sqm
3 115110 Finishing walls with water proofing 2000 Sqm 33.36 66720.00
cement paint of required shade two or
more coats on new work applied @
3.84 Kg/10 sqm
4 117052 Old work (one or more coats) 1000 Sqm 4.98 4980.00
Total= 433735.00
Add 11.10% below SOR 2010= 48144.585
G/Total= 385590.42
The work herein mentioned are required to be complete on or before (date) 30.06.2021. The quantities provided
herein are approximate and subject to variation under clause 42 of the General Condition of Contract.
v
Work Order Under Zone Cantract.
Work Order No. 03 Date
Name of Work-Painting door , window, shade , fencing , s/building , s/qtrs SKB to FBD
Under ADEN/NCR/FZD.
Authority -Sr. DEN/IV/ALD Letter no. 74-w 10263/Bills/Date 06.08.21 DOC-30.06.2022
The Contracter -M/S Vimal Kumar Contractor,New sanjay nagar Etah-207001 U.P
SL NO. SOR Description of Item of Work QTY. Unit Rate Amount
121010 Applying Priming Coat :
121011 With ready mixed pink or grey 71 Sqm 21.40 1519.40
primer of approved brand and
manufacture on woodwork
(hard and soft wood)
1
121050 Painting with synthetic enamel
paint of approved brand and
manufacture to give an even
shade
121051 Two or more coats on new work 100 Sqm 45.30 4530.00
2
121052 One or more coats on old work 3800 Sqm 29.18 110884.00
3
121090 Painting with aluminium paint of
approved brand and
manufacture to give an even
shade
121092 One or more coats on old work 826 Sqm 26.60 21971.60
4
Total= 138905.00
Add 11.10% below SOR 2010= 15418.455
G/Total= 123486.55
Work Order Under Zone Cantract.
Date
Name of Work-Improvement of BGQ P/F No. 1&2 Pipe line connection of water booth in BGQ
Station in the section of SSE/W/FZD Under ADEN/NCR/FZD.
no. 74-w 10263/Bills/Date 06.08.21 DOC-30.06.2022
ar Contractor,New sanjay nagar Etah-207001 U.P
SL NO. SOR Description of Item of Work QTY. Unit Rate Amount
021010 Loading/Unloading F.P.S. /
Modular bricks including manual
lead upto 50m and stacking
1 properly into/from trucks, trailors 8000 1000 nos. 376.40 3011.17
or wagons
Date
Name of Work-Improvement of BGQ P/F No. 1&2 Pipe line connection of water booth in BGQ
Station in the section of SSE/W/FZD Under ADEN/NCR/FZD.
no. 74-w 10263/Bills/Date 06.08.21 DOC-30.06.2022
ar Contractor,New sanjay nagar Etah-207001 U.P
SL NO. SOR Description of Item of Work Remarks
021010 Loading/Unloading F.P.S. /
Modular bricks including manual
lead upto 50m and stacking
1 properly into/from trucks, trailors BGQ Malgodam dismentaling etc.
or wagons
074262 With 12mm mild steel U beading 100 Sqm 364.85 36485.00
Providing and fixing aluminium sliding door
bolts ISI marked anodised (anodic coating
not less than grade AC 10 as per IS: 1868)
078020 transparent or dyed to required colour or 0.00
shade with nuts and screws etc. complete
3 078021 300x16mm
Providing and fixing aluminium tower bolts
ISI marked anodised (anodic coating not
less than grade AC 10 as per IS: 1868)
078030 transparent or dyed to required colour or
shade with necessary screws etc. complete MNQ B.No. 20E , 30B , 3C Room etc.
4 078034 150x10mm
Providing and fixing aluminium handles ISI
marked anodised (anodic coating not less
than grade AC 10 as per IS: 1868)
078060 transparent or dyed to required colour or
shade with necessary screws etc. complete MNQ B.No. 20E , 30B , 3C Room etc.
5 078062 100mm
Structural steel work welded in built up
sections, trusses and framed work, girders,
stagings, racks, etc including cutting,
bending, straightening, hoisting, fixing in
position, including applying a priming coat
081030 of approved steel primer, complete - upto
MNQ B.No. 20E , 30B , 3C Room etc.
6m height above GL
Total= 419298.45
Add 11.10% below SOR 2010= 46542.13
G/Total= 372756.32
Work SHEET Under Zone Cantract.
Date
Name of Work-Repair to Plateform surface at SRDW Station in the section of SSE/W/FZD Under
ADEN/NCR/FZD.
Authority -Sr. DEN/IV/ALD Letter no. 74-w 10263/Bills/Date 06.08.21 DOC-30.06.2022
The Contracter -M/S Vimal Kumar Contractor,New sanjay nagar Etah-207001 U.P
SL NO. SOR Description of Item of Work Remarks
014090 Earth work in embankment from Railway land
for repairing of cess/formation/level crossing,
rain cuts etc. to make the surface to the desired
level and slope to the entire satisfaction of
Engineer-in-charge. The rate will include free
lead upto 200 M, all lifts, descends, ascends,
1 crossing of track/road/nallah etc. including SRDW Station plateform surface etc.
breaking of clods etc and compaction by
rollers/rammers/temping rods etc. Note - This
item is only to be paid when specially ordered
in writing.
43015 In slabs for drain covers, manhole covers, flue 0.2 cum 2695.23 0.00
tops etc.
045010 Supplying Reinforcement for R.C.C. work
including straightening, cutting, bending,
placing in position and binding all complete.
053020 Honey-comb brick work 20/23 cm thick with 1.62 Sqm 441.27
bricks of class designation 7.5 in cement
mortar 1:4 (1 Cement : 4 coarse sand)
5 714.86
092012 40mm thick with 20mm nominal size stone 106 Sqm 113.50
7 aggregate 12031.00
094040 Precast Chequered factory made terrazzo tiles
22mm thick/ with graded marble chips size
upto 6mm in floors jointed with neat cement
slurry mixed with pigment to match the shade
of the tiles including rubbing of cement slurry
complete on 20mm thick bed of cement
mortar 1:4 (1cement : 4Coarse sand)
0.00
092012 40mm thick with 20mm nominal size stone 20 Sqm 113.50
7 aggregate 2270.00
109200 Providing and fixing permanently colour 28 Sqm 776.36
coated trapezoidal profiled sheet of depth
28-30mm at 195-205mm pitch distance with
precisely engineered “Rib & Flute” design.
Profiled sheets shall be min. 0.5mm
TCT/0.45mm BMT high tensile zinc
aluminium alloy coated zincalume /
galvalume steel sheet (550 mpa yield
strength) having a coating of mass of 150
gsm zinc-aluminium coating AZ-150 total on
both sides as per, AS 1397:1993 finished with
20 microns approved colour coating of
Silicon Modified Polyester (SMP) / Super
Polyester paint coat on exposed surface ..
Contd. - 21738.08
8
Total= 303030.48
Add 11.10% below SOR 2010= 33636.38
G/Total= 269394.09
Work Order Under Zone Cantract.
Date
Name of Work-Improvement of Protection wall at Gate no. 7B SPL & 63C BGQ & MOQ Station in the
section of SSE/W/FZD Under ADEN/NCR/FZD.
Authority -Sr. DEN/IV/ALD Letter no. 74-w 10263/Bills/Date 06.08.21 DOC-30.06.2022
The Contracter -M/S Vimal Kumar Contractor,New sanjay nagar Etah-207001 U.P
SL NO. SOR Description of Item of Work Remarks
031010 Providing and laying in position cement
concrete of specified proportion excluding
cost of cement, centering and shuttering - All
works upto Plinth level :
BGQ Gate no. 7B & 63C Protection wall etc
031011 1:3:6 (1 cement : 3 sand : 6 graded stone
1 aggregate 20mm nominal size)
033060 Supply and using cement at worksite :
BGQ Gate no. 7B & 63C Protection wall etc
2 033063 PPC
051010 Brick work with non-modular (FPS) bricks of
class designation 7.5 in foundation and plinth
in : BGQ Gate no. 7B & 63C Protection wall etc
051017 Cement mortar 1:4 (1 cement : 4 coarse
3 sand)
051040 Extra over item 051010 & 051020 for brick
4 work in superstructure beyond plinth level BGQ Gate no. 7B & 63C Protection wall etc
upto floor two level :
Structural steel work welded in built up
sections, trusses and framed work, girders,
stagings, racks, etc including cutting,
bending, straightening, hoisting, fixing in
081030 position, including applying a priming coat of
approved steel primer, complete - upto 6m BGQ Gate no. 7B Room & F/Verandah etc
height above GL
8
The work herein mentioned are required to be complete on or before (date) 30.06.2022. The quantities provided
herein are approximate and subject to variation under clause 42 of the General Condition of Contract.
1:2:4 (1 cement : 2 sand : 4 graded stone aggregate 1.5 cum 1883.40 2825.10
1 031023 20mm nominal size)
Providing and fixing to existing door frames 30mm 77 Sqm 3744.26 288308.02
thick factory made solid both side prelaminated
panel PVC door shutter consisting of frame made out
of M.S. tubes of 19 gauge thickness and size of 19mm
x 19mm for styles and15x15mm, top & bottom rails.
M.S. frame shall have a coat of steel primers of
approved make and manufacture. M.S. frame
covered with 5mm thick heat moulded prelaminated
PVC Foam Sheet ‘C channel as per drawing given in IR
Standard Specifications complete in all respect
8 078150
Total= 424320.79
Add 11.10% below SOR 2010= 47099.61
G/Total= 377221.18
Work Order Under Zone Cantract.
Date
Name of Work-Repair to Door , window , latrine, bathroom , kitchen s/qtrs at MNQ Station in the section
of SSE/W/FZD Under ADEN/NCR/FZD.
Authority -Sr. DEN/IV/ALD Letter no. 74-w 10263/Bills/Date 06.08.21 DOC-30.06.2022
The Contracter -M/S Vimal Kumar Contractor,New sanjay nagar Etah-207001 U.P
SL NO. SOR Description of Item of Work Remarks
Providing and laying cement concrete, up to plinth in
retaining walls, walls (any thickness) including
attached plasters, columns, pillars, posts, struts,
buttresses, string or lacing courses, parapets, coping,
031020 bed blocks, anchor blocks, plain window sills, fillets
etc, excluding the cost of cement and of shuttering, MNQ B.No. 1( A to D) , 29 ( A to B) ,
centering. 30 (A to B ), 22 ( A to B ) , 9( A to H) , 8 , 3
( A to D ), 33, 1 (A to C ) , 31 ( A to D ) etc.
4 078022 250x16mm
Providing and fixing aluminium tower bolts ISI
marked anodised (anodic coating not less than grade
AC 10 as per IS: 1868) transparent or dyed to
078030 required colour or shade with necessary screws etc. MNQ B.No. 1( A to D) , 29 ( A to B) ,
complete 30 (A to B ), 22 ( A to B ) , 9( A to H) , 8 , 3
( A to D ), 33, 1 (A to C ) , 31 ( A to D ) etc.
5 078034 150x10mm
Providing and fixing aluminium handles ISI marked
anodised (anodic coating not less than grade AC 10
as per IS: 1868) transparent or dyed to required
078060 colour or shade with necessary screws etc. complete MNQ B.No. 1( A to D) , 29 ( A to B) ,
30 (A to B ), 22 ( A to B ) , 9( A to H) , 8 , 3
( A to D ), 33, 1 (A to C ) , 31 ( A to D ) etc.
6 078062 100mm
Providing and fixing factory made P.V.C. door frame
of size 50x47mm with a wall thickness of 5mm, made
out of extruded 5mm rigid PVC foam sheet mitered
at corners and joined with 2 Nos. of 150mm long
brackets of 15x15mm M.S. square tube, the vertical
door profiles to be reinforced with 19x19mm M.S.
square tube of 19 gauge, EPDM rubber gasket
weather seal to be provided through out the frame. MNQ B.No. 1( A to D) , 29 ( A to B) ,
7 078130 The door frame to be fixed to the wall using M.S. 30 (A to B ), 22 ( A to B ) , 9( A to H) , 8 , 3
screws of 65/100mm size complete as per ( A to D ), 33, 1 (A to C ) , 31 ( A to D ) etc.
manufacturers specification and direction of
Engineer-in-Charge
The work herein mentioned are required to be complete on or before (date) 30.06.2022. The quantities provided herein
are approximate and subject to variation under clause 42 of the General Condition of Contract.
1
014070 Cleaning out silt from bed of 1000 10 cum 561.35 56135.00
reservoir/canals including 50m lead
and lift upto 1.5 m
2
021510 Hiring of JCB Machine (in good 100 Hour 664.96 66495.88
working condition) for leveling and
dressing ground / dismantling
structures including disposal of
debris through dumpers etc. with
contractor’s labour, JCB machine,
machine operator, fuel, etc. The
contractor shall arrange road permit
for vehicle for all the States of
operation, as per instructions of
engineer in-charge and vehicle shall
not be more than three years old.
Payment shall be made for actual
working hours at site.
3
Providing and laying cement 0.00
concrete, up to plinth in retaining
031020 walls, walls (any thickness) including
attached plasters, columns, pillars,
posts,
1:2:4 (1struts,
cementbuttresses,
: 2 sand : string or
4 graded 34 cum 1883.40 64035.60
4 031023 lacing courses, parapets, coping, bed
stone aggregate 20mm nominal size)
033060 blocks, and
Supply anchor blocks,
using plain
cement window
at worksite 0.00
sills,
: fillets etc, excluding the cost of
cement and of shuttering, centering.
5 033063 PPC 25 Tonne 5520.00 138000.00
051010 Brick work with non-modular (FPS) 0.00
bricks of class designation 7.5 in
foundation and plinth in :
6 051017 Cement mortar 1:4 (1 cement : 4 10 cum 2835.4 28354.00
051040 coarse sand) 1417.30
Extra over item 051010 & 051020 for 10 cum 141.73
7 brick work in superstructure beyond
plinth level upto floor two level : Total= 413886.09
Add 11.10% below SOR 2010= 45941.36
G/Total= 367944.73
Work sheet Under Zone Cantract.
Date
Name of Work-Repair to Plateform surface , Colony & Bridge SKB to FBD in the section of
SSE/W/FZD Under ADEN/NCR/FZD.
Authority -Sr. DEN/IV/ALD Letter no. 74-w 10263/Bills/Date 06.08.21 DOC-30.06.2022
The Contracter -M/S Vimal Kumar Contractor,New sanjay nagar Etah-207001 U.P
SL NO. SOR Description of Item of Work Remarks
014010 Dressing Surface (average
excavation or filling upto 15 cm)
including removing vegetation in all
kind of soil. Payment against this
item is to be made only if it is not SKB to FBD & MNQ to KAHL Section
1
included in earth work item station & colony etc