‫چک لیست بازرسی شیرتوپی‬ Inspection of Ball Valve Check

List

P. L. Item No.
Client:
No. in P. L. :

Request Clause No.


ITP No.
No.: in ITP

Acceptance Further
Item Inspection Title Fit for Purpose? Inspection Evidence
Criteria Action

Yes No
Mechanical
N. A. 

Yes No
Chemical
N. A. 

Yes No
Raw Material
of Coat/Paint
N. A. 
M.T.C.

Yes No
Shell Hydro
test
N. A. 

Yes No
Low Pressure
Closure
N. A. 

Yes No
Doc. Review

High Pressure
Closure
N. A. 

Calibration Certificate Yes No


for Measurement
Equipment / Elcometer N. A. 

Yes No
Calibration Certificate
for Hydro Test Gauge
N. A. 

Yes No
Calibration Certificate
for NDT Equipment
N. A. 

Yes No
Qualification Certificate
of Welders
N. A. 

Yes No
Fire Safe Design
Certificate
N. A. 

Qualification Certificate Yes No


of NDT Personnel

Date Revision Issue Form


MIC-CL-3201-01
1401.06.29 0 0
N. A. 

Yes No
NDT Procedures
N. A. 

Yes No
Heat Treatment
Procedure
N. A. 

Test Procedures Yes No

(performance/Hydro tests) N. A. 

Yes No
Preparation / Painting /
Coating Procedure
N. A. 

Yes No
Packing Procedure
N. A. 

Yes No
DWG
N. A. 
Doc. Review

Yes No
WPS
N. A. 

Yes No
PQR
N. A. 

Yes No
Shell Hydro test
N. A. 

Yes No
Low Pressure Closure
N. A. 

Yes No
High Pressure Closure
N. A. 

Corrosion, lamination,
Yes No
Pits, Internal Chamfer,
Blister, Slivers, Dents
N. A. 
etc. on any surface

Yes No
Marking, Name Plate Heat No.:
Visual

N. A. 

Yes No
Checking the Valve
Class/Size
N. A. 

Yes No
Deviations from Design/
Purchase Order
N. A. 

Issue Revision Date


0 0 1401.06.22
Yes No

Dimensional
L
N. A. 

Yes No
D
N. A. 

Yes No
D1
N. A. 

Yes No
D2
N. A. 

Yes No
d
N. A. 

Yes No
tf
N. A. 

Yes No
n - ɸd
N. A. 

RT UT MT PT Yes No


VT
NDT

N. A. 
Performed on:

Yes No
Microstructure
Evaluation
N. A. 

Macrostructure Yes No


Evaluation in order to
look for any Weld Line N. A. 

Yes No
Chemical Analysis
N. A. 
Tests Results of Samples

Yes No
Mechanical Analysis
N. A. 

Yes No
Low Pressure Air Tests
N. A. 

Shell Yes No


Hydro
test N. A. 

Low Yes No


Hydrostatic
Pressure
Testing
Closure N. A. 

High Yes No


Pressure
Closure N. A. 

Issue Revision Date


0 0 1401.06.22
‫‪Yes‬‬ ‫‪No‬‬
‫‪Visual‬‬

‫‪Painting/ Coating‬‬
‫‪N. A. ‬‬

‫‪Yes‬‬ ‫‪No‬‬
‫‪Thickness‬‬
‫‪N. A. ‬‬

‫‪Yes‬‬ ‫‪No‬‬
‫‪Adhesion‬‬
‫‪N. A. ‬‬

‫‪Yes‬‬ ‫‪No‬‬
‫‪Final Inspection‬‬

‫‪Packing & Loading‬‬


‫‪N. A. ‬‬

‫‪Yes‬‬ ‫‪No‬‬
‫‪Packing‬‬
‫‪N. A. ‬‬

‫‪Yes‬‬ ‫‪No‬‬
‫‪Loading‬‬
‫‪N. A. ‬‬

‫‪:‬لطفا این قسمت توسط پرسنل دفتر فنی تکمیل گردد‬

‫‪.‬بازرسی در موارد بررسی شده‪ ،‬فاقد مغایرت میباشد و صدور ریلیزنوت بالمانع است ‪‬‬

‫‪.‬فرآیند‪ G‬بازرسی تکمیل نشده و به بازرسی بعدی نیاز دارد ‪‬‬

‫‪.‬فرآیند‪ G‬بازرسی کامل شده و کاال به جهت مغایرتهای موجود‪ ،‬مردود اعالم میگردد ‪‬‬

‫‪:‬مدیر پروژه‬ ‫‪:‬مدیر فنی‬ ‫‪:‬کارشناس فنی‬ ‫‪:‬بازرس‬


‫‪:‬نام و نام خانودگی‬ ‫‪:‬نام و نام خانودگی‬ ‫‪:‬نام و نام خانودگی‬ ‫‪:‬نام و نام خانودگی‬
‫‪ :‬امضا‬ ‫‪ :‬امضا‬ ‫‪ :‬امضا‬ ‫‪ :‬امضا‬
‫‪:‬تاریخ‬ ‫‪:‬تاریخ‬ ‫‪:‬تاریخ‬ ‫‪:‬تاریخ‬

‫‪Issue‬‬ ‫‪Revision‬‬ ‫‪Date‬‬


‫‪0‬‬ ‫‪0‬‬ ‫‪1401.06.22‬‬

You might also like