Professional Documents
Culture Documents
Last Inspection Next Inspection Due Last Proof Load Test Date Next Proof Load Test Due
N/A 28/ 02/ 2022 N/A After Major Repair or Rectification
PROOF LOAD
IDENTIFICATION NO DESCRIPTION OF EQUIPMENT QTY SWL
TEST
R01 DRILL PIPE ROLLER
R02
R03
FULLY WEDED STEEL CONSTRUCTION CONSISTS
R04 OF TWO ROLLERS WHICH USED FOR SUPPORTING
R05 PIPES 10 400 KG 800 KG
R06
R07
R08 CAPACITY: 400 KG
R09
R010
Applicable Reference
Examined According to CLIENT REQUIRMENT
Standard:
Was the examination carried out:
* Is this the first examination after installation or YES √ NO * Within an interval of 6 months? YES √ NO
assembly at a new site or location?
* Within an interval of 12 months? YES NO √
* If the answer to the above question is YES * In accordance with an
YES √ NO
examination scheme?
YES NO √
has the equipment been installed correctly?
* After the occurrence of
exceptional circumstances?
YES NO √
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect::
(If none state NONE)
None
Is the above a defect which is of immediate danger to persons YES NO √
Is the above a defect which is not yet but could become a danger to persons:
(If YES state the date by when)
NO √ YES By:
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
None
THIS IS TO CERTIFY THAT; a competent person did attend the above-mentioned owner’s work location on the date shown above
and the equipment described in this report was tested & inspected as per the requirements of Lifting Operations Lifting Equipment
Regulation “LOLER”. The result was found Satisfactory at the time of Inspection and considered Safe for Lifting.
Al TAKAMUL COMPANY FOR ENGINEERING TESTS
AND PROFESSIONAL SAFETY LIMITED
Basra, North Rumaila, Quality Control Yard - Iraq
Tel: +9647810009138 / +9647834964657
Email: OP@qualitycontrol-iraq.com / hany.akafi@qualitycontrol-iraq.com
Last Inspection Next Inspection Due Last Proof Load Test Date Next Proof Load Test Due
N/A 28/ 02/ 2022 N/A After Major Repair or Rectification
PROOF LOAD
IDENTIFICATION NO DESCRIPTION OF EQUIPMENT QTY SWL
TEST
R011 DRILL PIPE ROLLER
R012
R013
FULLY WEDED STEEL CONSTRUCTION CONSISTS
R014 OF TWO ROLLERS WHICH USED FOR SUPPORTING
R015 PIPES 10 400 KG 800 KG
R016
R017
R018 CAPACITY: 400 KG
R019
R020
Applicable Reference
Examined According to CLIENT REQUIRMENT
Standard:
Was the examination carried out:
* Is this the first examination after installation or YES √ NO * Within an interval of 6 months? YES √ NO
assembly at a new site or location?
* Within an interval of 12 months? YES NO √
* If the answer to the above question is YES * In accordance with an
YES √ NO
examination scheme?
YES NO √
has the equipment been installed correctly?
* After the occurrence of
exceptional circumstances?
YES NO √
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect::
(If none state NONE)
None
Is the above a defect which is of immediate danger to persons YES NO √
Is the above a defect which is not yet but could become a danger to persons:
(If YES state the date by when)
NO √ YES By:
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
None
THIS IS TO CERTIFY THAT; a competent person did attend the above-mentioned owner’s work location on the date shown above
and the equipment described in this report was tested & inspected as per the requirements of Lifting Operations Lifting Equipment
Regulation “LOLER”. The result was found Satisfactory at the time of Inspection and considered Safe for Lifting.
Al TAKAMUL COMPANY FOR ENGINEERING TESTS
AND PROFESSIONAL SAFETY LIMITED
Basra, North Rumaila, Quality Control Yard - Iraq
Tel: +9647810009138 / +9647834964657
Email: OP@qualitycontrol-iraq.com / hany.akafi@qualitycontrol-iraq.com
Last Inspection Next Inspection Due Last Proof Load Test Date Next Proof Load Test Due
N/A 28/ 02/ 2022 N/A After Major Repair or Rectification
PROOF LOAD
IDENTIFICATION NO DESCRIPTION OF EQUIPMENT QTY SWL
TEST
DRILL PIPE ROLLER
CAPACITY: 400 KG
Applicable Reference
Examined According to CLIENT REQUIRMENT
Standard:
Was the examination carried out:
* Is this the first examination after installation or YES √ NO * Within an interval of 6 months? YES √ NO
assembly at a new site or location?
* Within an interval of 12 months? YES NO √
* If the answer to the above question is YES * In accordance with an
YES √ NO
examination scheme?
YES NO √
has the equipment been installed correctly?
* After the occurrence of
exceptional circumstances?
YES NO √
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect::
(If none state NONE)
None
Is the above a defect which is of immediate danger to persons YES NO √
Is the above a defect which is not yet but could become a danger to persons:
(If YES state the date by when)
NO √ YES By:
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
None
THIS IS TO CERTIFY THAT; a competent person did attend the above-mentioned owner’s work location on the date shown above
and the equipment described in this report was tested & inspected as per the requirements of Lifting Operations Lifting Equipment
Regulation “LOLER”. The result was found Satisfactory at the time of Inspection and considered Safe for Lifting.
Al TAKAMUL COMPANY FOR ENGINEERING TESTS
AND PROFESSIONAL SAFETY LIMITED
Basra, North Rumaila, Quality Control Yard - Iraq
Tel: +9647810009138 / +9647834964657
Email: OP@qualitycontrol-iraq.com / hany.akafi@qualitycontrol-iraq.com
Last Inspection Next Inspection Due Last Proof Load Test Date Next Proof Load Test Due
N/A 28/ 02/ 2022 N/A After Major Repair or Rectification
PROOF LOAD
IDENTIFICATION NO DESCRIPTION OF EQUIPMENT QTY SWL
TEST
R021 DRILL PIPE ROLLER
R022
R023
FULLY WEDED STEEL CONSTRUCTION CONSISTS
R024
OF TWO ROLLERS WHICH USED FOR SUPPORTING
R025 PIPES
R026 10 400 KG 800 KG
R027
R028 CAPACITY: 400 KG
R029
R030
Applicable Reference
Examined According to CLIENT REQUIRMENT
Standard:
Was the examination carried out:
* Is this the first examination after installation or YES √ NO * Within an interval of 6 months? YES √ NO
assembly at a new site or location?
* Within an interval of 12 months? YES NO √
* If the answer to the above question is YES * In accordance with an
YES √ NO
examination scheme?
YES NO √
has the equipment been installed correctly?
* After the occurrence of
exceptional circumstances?
YES NO √
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect::
(If none state NONE)
None
Is the above a defect which is of immediate danger to persons YES NO √
Is the above a defect which is not yet but could become a danger to persons:
(If YES state the date by when)
NO √ YES By:
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
None
THIS IS TO CERTIFY THAT; a competent person did attend the above-mentioned owner’s work location on the date shown above
and the equipment described in this report was tested & inspected as per the requirements of Lifting Operations Lifting Equipment
Regulation “LOLER”. The result was found Satisfactory at the time of Inspection and considered Safe for Lifting.