Professional Documents
Culture Documents
Check List
P. L. Item No.
Client:
No. in P. L. :
Request Clause
ITP No.
No.: No. in ITP
Acceptance Further
Item Inspection Title Fit for Purpose? Inspection Evidence
Criteria Action
Yes No
Mechanical
N. A.
Yes No
Chemical
N. A.
Yes No
Raw Material
of Coat/Paint
N. A.
Yes No
Shell Hydro
M.T.C.
test
N. A.
Yes No
Backseat test
N. A.
Yes No
Doc. Review
Low Pressure
Closure
N. A.
Yes No
High Pressure
Closure
N. A.
Yes No
Calibration Certificate
for Hydro Test Gauge
N. A.
Yes No
Calibration Certificate
for NDT Equipment
N. A.
Yes No
Qualification Certificate
of Welders
N. A.
Yes No
Qualification Certificate
of NDT Personnel
N. A.
Yes No
NDT Procedures
N. A.
Yes No
Heat Treatment
Procedure
N. A.
(performance/Hydro tests) N. A.
Yes No
Preparation / Painting /
Coating Procedure
N. A.
Yes No
Packing Procedure
N. A.
Yes No
DWG
N. A.
Yes No
Doc. Review
WPS
N. A.
Yes No
PQR
N. A.
Yes No
Shell Hydro test
N. A.
Yes No
Backseat test
N. A.
Yes No
Low Pressure Closure
N. A.
Yes No
High Pressure Closure
N. A.
Corrosion, lamination,
Yes No
Pits, Internal Chamfer,
Blister, Slivers, Dents etc.
N. A.
Visual
on any surface
N. A.
Yes No
Deviations from Design/
Purchase Order
N. A.
Yes No
L
N. A.
Yes No
D
N. A.
Yes No
D1
N. A.
Dimensional
Yes No
D2
N. A.
Yes No
d
N. A.
Yes No
tf
N. A.
Yes No
n - ɸd
N. A.
N. A.
Performed on:
Yes No
Microstructure
Evaluation
N. A.
Yes No
Chemical Analysis
N. A.
Yes No
Mechanical Analysis
N. A.
Yes No
Visual
Painting/ Coating
N. A.
Yes No
Thickness
N. A.
Yes No
Adhesion
N. A.
Yes No
Final Inspection
Packing & Loading
N. A.
Yes No
Packing
N. A.
Yes No
Loading
N. A.
.بازرسی در موارد بررسی شده ،فاقد مغایرت میباشد و صدور ریلیزنوت بالمانع است
.فرآیند Gبازرسی کامل شده و کاال به جهت مغایرتهای موجود ،مردود اعالم میگردد