SMP I POTO TANO

+ 483.000

+ 485.500

+ 488.000

+ 490.500

+ 493.000

+ 495.500

+ 498.000
+ 9.051.500
BB.20

CP-34
X = 482591.626
Y = 9 049754.170
BB.21
Z = 38.503

CP-35
X = 482583.678 CP-43
LEGENDA
Y = 9 049812.522
CP-42 LEGEND
X = 484335.572
X = 484407.445
Z = 37.544 Y = 9 047829.400
Y = 9 046832.889
E. Tanah Olat Z = 36.748
Z = 36.832 Garis Tinggi
Contour Line
Sungai Dengan Aliran Menerus
River Tributaries With Continous Flow
+ 9.049.000
CP-39 Aliran
X = 486418.468 Flow Direction
Y = 9 047448.282 CP-38 Aliran Tidak Tetap
Intermittent Stream
Z = 31.818 X = 486477.755 Jalan Propinsi
B Tebo Y = 9 047419.434 Provincial Road (Surfaced Road)
Z = 29.729 Jalan Desa
Village Road
Bendung Permanen
Permanent Weir
Saluran Primer
Primary Canal
E Ai Olat BS. 2
Saluran Sekunder
23.0 ha 42.622 l/dt
Secondary Canal
Saluran Tersier
BB.16
SIPHON- 6 Tertiary Canal
Saluran Kwarter
S I P HON-5

B AO.2
38.0 ha 70.419 l/dt

Quarternary Canal
Saluran Pasangan
16.0 ha 29.650 l/dt 10.0 ha ...........l/dt Lined Canal
B AO.3 Bangunan Pengatur Muka Air
Check Structure
Kubur
BSG.5 Ki
1.0 ha ...........l/dt
Bangunan Bagi
BTK.1 Kn a Division Structure
B AO.4 BTK.1 Kna 2.5 ha ...........l/dt

Bangunan Sadap
Jl Dekat AkSal
+ 9.046.500 Off - Take Structure
13.0 ha 24.091 l/dt
Bangunan Bagi dan Sadap
Division Structure With Off - Take
22.0 ha 40.769 l/dt Box Tersier
Tertiary Box
Box Tersier dengan Pelimpah
Tertiary Box With Wasteway
B AO.5 Box Kwarter
CP-32 Quarternary Box (Farm Inlet)
CP-33 Gorong - Gorong Irigasi
X = 486173.386 X = 486204.422 Irrigation Culvert
Y = 9 044733.831 Y = 9 044744.281 Gorong - Gorong Pembuang
Z = 42.105 Z = 42.095 Drainage Culvert Below Irrigation Canal
Talang
Flume, Aquaduct
Terjunan (Vertikal/ Miring)
36.0 ha 66.713 l/dt

Drop Structure (Straight/ Inclined)


32.0 ha 59.300 l/dt
Got Miring
33.0 ha 61.154 l/dt
Inclined Canal
15.0 ha 27.797 l/dt

32.0 ha 59.300 l/dt


Bangunan Pelimpah Samping
Side Spillway
Bangunan Pembuang
Wasteway
21.0 ha 38.916 l/dt Jembatan
16.0 ha 29.650 l/dt Bridge
+ 9.044.000 6.0 ha 11.119 l/dt
Jembatan Orang
Foot Bridge
Tangga Cuci
18.0 ha 33.357 l/dt Washing Step
13.0 ha 24.091 l/dt
4.0 ha 7.413 l/dt
Titik Tetap (Patok Beton)
Benchmark
Titik Kontrol
Controlle Point
Bdg Sawe
Persilangan Grid
20.5 ha 37.989 l/dt
5.5 ha 10.192 l/dt

95.0 ha 176.048 l/dt

Grid Cross

CP-23
CP-22
X = 487564.718
X = 487603.916
Y = 9 041471.113
Y = 9 041445.412
Z = 26.623
Z = 29.631

+ 9.041.500 1

CP-7
X = 494468.386 CP-5
Y = 9 039437.370 X = 495592.438
CP-4
Z = 41.209 Y = 9 038833.707 X = 495618.911
100.0 ha 185.314 l/dt
Z = 41.389
6.0 ha 11.119 l/dt

CP-11 Y = 9038759.330
89.0 ha 164.929 l/dt CP-6 Z = 50.425
83.0 ha 153.811 l/dt

82.0 ha 151.957 l/dt


X = 468392.099 X = 494775.193 INL.5
SIPHON- 1
95.0 ha 176.048 l/dt

Y = 9 038979.169 Y = 9 039431.898 SIPHON- 2


Z = 47.843 Z = 47.566
2.5 ha 4.633 l/dt

SIPHON- 3

TALANG -5
CP-10
BB.4
S UP LES I KESELOTO
X = 468467.974 CP-2
Y = 9 038967.007 X = 496072.111
GR. P EMBAWA-2
BB.2
Z = 47.627 Y = 9 037911.466
103 ha 190.873 l/dt
INL.6
9.0 ha 16.678 l/dt
Z = 43.185
TALANG - 4
GR. P EMBAWA-4 0 2500 5000 75000 100000 125000 m
+ 9.039.000 GR. S I LANG-7
GR. S I LANG-6
48.0 ha 88.951 l/dt
TALANG -2
INL.7 6.0 ha 11.119 l/dt

3.0 ha 5.559 l/dt


I N L .7Ki
SKALA 1 : 5000
4.5 ha .... lt/dt 18.0 ha 33.357 l/dt
INL.9
6.5 ha 12.045 l/dt

DANAU TALIWANG / LEBUK CP-3


5.0 ha 9.266 l/dt
48.0 ha 88.951 l/dt
4.5 ha 8.339 l/dt INL.2
INL.11
1.5 ha 2.780 l/dt
2.5 ha 4.633 l/dt
X = 496109.716
11.0 ha 20.385 l/dt

84.0 ha 155.664 l/dt


GR. S I LANG-1
Y = 9 037934.122
3.0 ha 5.559 l/dt
Z = 45.652 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT PROVINSI
BS.1 Ka Ka.1
BS.1 Ka Ka.2
2.0 ha 3.706 l/dt

TALANG -1
DI REKTO RAT J ENDERAL SUM BER DAYA AIR NUSA TENGGARA BARAT
BALAI WILAYAH SUNGAI NUSA TENGGARA I
7.0 ha 12.972 l/dt
1.91 ha 3.706 l/dt

8.0 ha 14.825 l/dt KABUPATEN


7.0 ha 12.972 l/dt
SATUAN KERJA BALAI WILAYAH SUNGAI NUSA TENGGARA I SUMBAWA BARAT
SATUAN KEGIATAN PERENCANAAN DAN PROGRAM
37.0 ha 68.566 l/dt

14.34 ha 26.57 l/dt

22.0 ha 40.769 l/dt


7.0 ha 12.972 l/dt Jl. Sandubaya KM.7 No. 1 Gerimak-Mataram 83371 Telp. (0370) 672282 Fax. 672345 PEKERJAAN
REVIEW DESAIN JARINGAN IRIGASI DAN
20.0 ha 37.063 l/dt
PENYEMPURNAAN DESAIN TEROWONGAN
27.0 ha 50.035 l/dt
DI. BINTANG BANO
GAMBAR :
SITUASI UMUM NO. REGISTER :
17.0 ha 31.503 l/dt
( IRIGASI BINTANG BANO )
+ 9.036.500
33.0 ha 61.154 l/dt
NO. LEMBAR : 01 / 29
SL Tuah

PT. INDRA KARYA (PERSERO) WILAYAH I DIRENCANA TANGGAL SK NOMOR :


9.0 ha 16.678 l/dt
CONSULTING ENGINEERS
INK IN DO 3 07 1/T/02 72 .JTM
TRUST & KNOWLEDGE
I NDR A KARYA
I S O 9001
I K RCS No. 3411188 DIGAMBAR
29 MARET 2018 IK.02.04-AS/SAT.BWS 16
14.0 ha 25.944 l/dt
2.5 ha 4.633 l/dt

2.0 ha 3.706 l/dt


DIPERIKSA Direksi Pekerjaan : Made Mira Charisma, ST., M.Eng. /SPK-PP/2356/2018

DISETUJUI PPK Perenc. & Program : Sri Utami Sudiarti, ST., MT.
SALURAN I N D U K REA KIRI
INL.2 BKR Ki 1 BKR Ki 2 INL.3 BKR Ki 3 BKR Ki 4 BKR Ki 5 INL.4 BKR Ki 6 BJ 1 BJ 2 BJ 3 INL.5 BJ 4 BJ 5 INL.6 INL.7 BJ 6 BJW 3 BJW 4 BJW 5 BJW 6 BJW 7 BJW 8

757 757 580 302 512 SALURAN SEKUNDER J AWAT

BTS 1 BP 1
BJR 1
INL.1 SALURAN SEKUNDER TERAS BJR 2
BMTS 1 INL.8 SALURAN SEKUNDER PONYOK
BJR 3 BJR 4 BJR 5 BJR 6
BP 2

Brang Rea
BP 3
BMB
Bendung Kalimantong-2
Siphon BMP

BB 1

SAL. SEKUNDER BILAH


Pekerjaan Fisik Paket 1

BR Ka 8 BR Ka 13a BR Ka 15 BR Ka 17
BR Ka 12 BR Ka 13
BR Ka 1 BR Ka 2 INL.1 BR Ka 3 BR Ka 4 BR Ka 5 INL.1a BR Ka 6 BR Ka 7 BR Ka 10 BR Ka 11 INL.3 INL.4 INL.5 BR Ka 14 INL.6 BR Ka 16 INL.7

SALURAN IN D U K REA KANAN SALURAN IN D U K REA KANAN SALURAN


SEKUNDER
GR. Pembawa - 2 (BB.2n)

GR. Pembawa - 3 (BB.2p)


GR. Pembawa - 4 (BB.2q)

GR. Pembawa - 6 (BB.3a)


GR. Pembawa - 1 (BB.2d)

GR. Pembawa - 5 (BB.2r)

GR. Silang - 11 (BB.4b)


GR. Silang - 10 (BB.4a)

GR. Silang - 12 (BB.4e)


JEROK TIRAM
GR. Silang - 4 (BB.2m)

GR. Silang - 9 (BB.3m)


GR. Silang - 5 (BB.3b)

GR. Silang - 6 (BB.3d)

GR. Silang - 7 (BB.3g)


GR. Silang - 1 (BB.2c)

GR. Silang - 8 (BB.3k)


GR. Silang - 3 (BB.2k)

BR Ka 9 INL.2
GR. Silang - 2 (BB.2j)

Jembatan Orang - 1

Jembatan Orang - 2

Jembatan Orang - 3

Jembatan Orang - 4

Jembatan Orang - 5
Talang - 4a(BB.4f)
Siphon - 2(BB.2o)
Talang - 1(BB.2a)

SUPLESI SELOTO BJT 1 BMJT

Talang - 4(BB.4f)
Talang - 2(BB.2f)

Siphon - 1(BB.2i)

Talang - 3(BB.3j)
LANG TUAH & AI NGERO
BMR Ka.9

SALURAN MUKA KANAN


BB.5 Ki
MR Ka 9
Terowongan Moteng

BB.1 INL.1 INL.2 INL.3 INL.4 INL.5 BB.2 INL.6 INL.7 INL.8 INL.9 INL.10 INL.11 BB.3 INL.12 BB.4 INL.13
BB.5
SALURAN I NDUK BI NTANG BANO
GR. Silang - 13 (BB.7a)
BB.6
Jembatan Orang - 6
Pekerjaan Fisik Paket 2 BB.7 Pekerjaan Fisik Paket 3
Jembatan Orang - 7
BB.8
GR. Silang - 14 (BB.9s)
GR. Silang - 15 (BB.9u)
Talang - 5(BB.9a)
GR. Silang - 13a (BB.7a)
BB.9
BB.10
P.666 Talang - 6(BB.11a) & SAWE
Jembatan Orang - 5 106.5 ha

BB.11
GR. Silang - 16 (BB.12a) P.704
GR. Silang - 17 (BB.12s) P.707
GR. Silang - 18 P.708
GR. Silang - 19 P.712
BAO.5
Pekerjaan Fisik Paket 3 GR. Silang - 20 P.716
INL.14
GR. Silang - 21 R.2
BB.12 BAO.4
GR. Silang - 22 P.753
BSG.5 Ki

GR. Pembawa - 10 (BB.18 a)


BB.13
BAO.3
Jembatan Orang - 8

P.873
P.841 Talang - 7(BB.14 a)
GR. Pembawa - 7 (BB.14s) BAO.2
Jembatan Orang - 9 SUPLESI TEBO
BSG.4 Ki
13.0 ha SUPLESI BATANG, AI TUI,
BB.14 RB. BATU & MERARAN
162 ha
SUPLESI TIU KAWA,
GR. Pembawa - 8 (BB.15a) KULIR & LUTUK
696 ha
Jembatan Orang - 10 BB.15 SALURAN I NDUK BI NTANG BANO
GR. Pembawa - 8 (BB.15 a)
BB.18 SAL. SEKUNDER AI OLAT

Talang - 8(BB.16 s)
Talang - 9(BB.16 c)
BB.16 BB.17

GR. Silang - 25
GR. Pembawa - 9 (BB.16 c)

GR. Silang - 23

GR. Silang - 24
Jembatan Orang - 13
Jembatan Orang - 14
Jembatan Orang - 12
Jembatan Orang - 11
Outlet Talang-9
Terowongan Senayan

SAL. SEKUNDER BINTANG BANO


BB.19

634 ha BB.21
BB.20
BB.22

Renc. Ekstensifikasi
748.12 I/dt B.Muka-1

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT PROVINSI


DIREKTORAT JENDERAL SUMBER DAYA AIR NUSA TENGGARA BARAT
BALAI WILAYAH SUNGAI NUSA TENGGARA I KABUPATEN
SATUAN KERJA BALAI WILAYAH SUNGAI NUSA TENGGARA I SUMBAWA BARAT
SATUAN KEGIATAN PERENCANAAN DAN PROGRAM
PEKERJAAN
Jl. Sandubaya KM.7 No. 1 Gerimak-Mataram 83371 Telp. (0370) 672282 Fax. 672345 REVIEW DESAIN JARINGAN IRIGASI DAN
PENYEMPURNAAN DESAIN TEROWONGAN
DI. BINTANG BANO
GAMBAR :
SKEMA BANGUNAN IRIGASI NO. REGISTER :
BINTANG BANO

PT. INDRA KARYA (PERSERO) WILAYAH I DIRENCANA TANGGAL SK NOMOR :


CONSULTING ENGINEERS INK IN DO 3 07 1/T/02 72 .JTM
TRUST & KNOWLEDGE
IND RA KARYA
I S O 9001
I K RCS No. 3411188
DIGAMBAR
29 MARET 2018 IK.02.04-AS/SAT.BWS 16
DIPERIKSA Direksi Pekerjaan : Made Mira Charisma, ST., M.Eng. /SPK-PP/2356/2018

DISETUJUI PPK Perenc. & Program : Sri Utami Sudiarti, ST., MT.
INL.7
4.00 ha ... I/dt
JW 6 Ki JW 8 Ki
10.00 ha ... I/dt 33.00 ha ... I/dt
INL.4 Ki JW 5 Ki JW 7 Ki
BJ 4 Ki
2.00 ha ... I/dt
13.00 ha ... I/dt 56.00 ha ... I/dt 1.50 ha ... I/dt
SALURAN IN DU K REA KIRI
INL.2 BKR Ki 1 BKR Ki 2 INL.3 BKR Ki 3 BKR Ki 4 BKR Ki 5 INL.4 BKR Ki 6 BJ 1 BJ 2 BJ 3 INL.5 BJ 4 BJ 5 INL.6 INL.7 BJ 6 BJW 3 BJW 4 BJW 5 BJW 6 BJW 7 BJW 8
JW 8 Te
757 757 580 302 512 24.00 ha ... I/dt
SALURAN SEKUNDER JAWAT
BR Ki 1 Ka INL.3 BR Ki 4 Ka INL.4 Ka BJ 1 Ka BJ 3 Ka BJ 4 Ka INL.6 BJ 6 Ka JW 4 Ka JW 6 Ka JW 8 Ka
8.50 ha ... I/dt 4.00 ha ... I/dt 50.00 ha ... I/dt 1.00 ha ... I/dt 36.00 ha ... I/dt 40.50 ha ... I/dt 49.00 ha ... I/dt 57.00 ha ... I/dt 457.00 ha ... I/dt 9.25 ha ... I/dt 14.00 ha ... I/dt 55.00 ha ... I/dt

INL.2 BR Ki 2 Ka BR Ki 3 Ka BR Ki 3 Ki BR Ki 5 Ka BR Ki 6 Ka BJ 2 Ka INL.5 BJ 5 Ka JW 3 Ka JW 5 Ka JW 7 Ka
4.00 ha ... I/dt 21.50 ha ... I/dt 15.00 ha ... I/dt 78.20 ha ... I/dt 106.00 ha ... I/dt 40.50 ha ... I/dt 38.00 ha ... I/dt 7.00 ha ... I/dt 24.00 ha ... I/dt 39.00 ha ... I/dt 27.00 ha ... I/dt 12.00 ha ... I/dt

BTS 1 Ki BP 1 Ka BJR 1 Ka BJR 1


BTS 1 BP 1
34.00 ha ... I/dt 20.50 ha ... I/dt 12.75 ha ... I/dt
INL.1 BJR 4 Ki BJR 5 Ki BJR 6 Ki
9.00 ha ... I/dt SALURAN SEKUNDER TERAS INL.8 BJR 2 Ka BJR 2
18.50 ha ... I/dt 34.00 ha ... I/dt 27.00 ha ... I/dt
BMTS 1 2.00 ha ... I/dt SALURAN SEKUNDER PONYOK 15.00 ha ... I/dt
BJR 3 BJR 4 BJR 5 BJR 6
BMTS 1 BP 2 Ki
BP 2
43.00 ha ... I/dt 17.50 ha ... I/dt
Brang Rea BP 3 Ka BP 3 Ki
BP 3
BJR 3 Ki BJR 6 Ka BMB 1
11.10 ha ... I/dt 110.50 ha ... I/dt BMB
Bendung Kalimantong-2 15.00 ha ... I/dt 44.00 ha ... I/dt 23.00 ha ... I/dt

BMP
BR Ka 5 Ki BB 1 Ki BB 1 Ka
BMP
36.00 ha ... I/dt 63.00 ha ... I/dt
43.00 ha ... I/dt 50.70 ha ... I/dt BB 1

BR Ka 13 Ki
BR Ka 1 Ki INL.1 Ki BR Ka 4 Ki INL. 1a BR Ka 7 Ki BR Ka 10 Ki INL. 3 81.50 ha ... I/dt INL. 6 BR Ka 16 Ki BR Ka 17 Ki
71.00 ha ... I/dt 12.50 ha ... I/dt 44.00 ha ... I/dt 7.50 ha ... I/dt 50.50 ha ... I/dt 63.50 ha ... I/dt 13.00 ha ... I/dt 5.00 ha ... I/dt 45.00 ha ... I/dt 29.50 ha ... I/dt SAL. SEKUNDER BILAH
INL. 5
2.00 ha ... I/dt R Ka 17 Ka 1
BR Ka 2 Ki BR Ka 3 Ki BR Ka 6 Ki BR Ka 8 Ki BR Ka 11 Ki INL. 4 BR Ka 14 Ki 26.00 ha ... I/dt
51.50 ha ... I/dt INL. 7
66.00 ha ... I/dt 38.50 ha ... I/dt 51.50 ha ... I/dt 45.50 ha ... I/dt 17.50 ha ... I/dt 49.00 ha ... I/dt
15.00 ha ... I/dt

BR Ka 8 BR Ka 13a BR Ka 15 BR Ka 17

INL. 2 BR Ka 12 R Ka 17 Ka 2
BR Ka 1 BR Ka 2 INL.1 BR Ka 3 BR Ka 4 BR Ka 5 INL.1a BR Ka 6 BR Ka 7 BR Ka 10 BR Ka 11 INL.3 INL.4 BR Ka 13 INL.5 BR Ka 14 INL.6 BR Ka 16 INL.7
13.50 ha ... I/dt 37.50 ha ... I/dt
SALURAN I ND UK REA KANAN SALURAN IN DU K REA KANAN SALURAN
BJT 1 Ki
B.1 Ki.2 BR Ka 12 Ki BR Ka 15 Ki SEKUNDER 25.00 ha ... I/dt
SUPLESI SELOTO
37.0 ha 43.66 I/dt
B.2 Ki B.3 Ki LANG TUAH & AI NGERO 28.50 ha ... I/dt 45.50 ha ... I/dt JEROK TIRAM
BR Ka 9 INL.2 BMJT 1 Ka
48.0 ha 2.0 ha 2.36 I/dt 187.5 ha
B.1 Ki.1 56.64 I/dt
BR Ka 13 KA 13.00 ha ... I/dt
20.0 ha 23.60 I/dt B.5 Ki Ki BR Ka 9 Ki BJT 1 BMJT
INL.1 - INL.5 INL.6 - INL.11 INL.12 Ki B.4 Ki 39.50 ha ... I/dt
119 ha 140.42 I/dt 5.00 ha ... I/dt
48 ha 25 ha 3.0 ha 3.54 I/dt 9.0 ha 10.62 I/dt MR Ka 9A
BMR Ka.9 51.50 ha ... I/dt

BB.5 Ki
Terowongan Moteng SALURAN MUKA KANAN

BB.1 INL.1 - INL.5 BB.2 INL.12 BB.4 INL.13 Ki B.5 Ki Ka


INL.6 - INL.11BB.3
INL.13 11.0 ha 12.98 I/dt 84.0 ha 99.12 I/dt
MR Ka 9
SALURAN INDUK BINTANG BANO 60.00 ha ... I/dt
BB.5
B.5 Ki
48.0 ha 56.64 I/dt
B.6 Ki
BB.6 103 ha 121.54 I/dt
B.7 Ki
BB.7 89.0 ha 105.02 I/dt
B.8 Ki
BB.8 32.5 ha 38.35 I/dt
B.9 Ki
BB.9 12.0 ha 14.16 I/dt

B.10 Ki
BB.10 24.5 ha 28.91 I/dt
SUPLESI BRENGK. SERAN
& SAWE
106.5 ha AO.5
B.11 Ki 35.0 ha 41.30 I/dt
BB.11
34.0 ha 40.12 I/dt

INL.14 Ki
INL.14 16.0 ha 18.88 I/dt BAO.5

B.12 Ki BSG.5 Ki
BB.12 SG.5 Ki AO.4
46.0 ha 54.28 I/dt BAO.4
10.0 ha 11.80 I/dt 22.0 ha 25.96 I/dt

B.13 Ki
BB.13 B.14 Ki
22.0 ha 25.96 I/dt AO.3
13.0 ha 15.34 I/dt 16.0 ha 18.88 I/dt BAO.3

BSG.4 Ki AO.2
BB.14 SG.4 Ki
BAO.2
16.0 ha 18.88 I/dt 16.0 ha 18.88 I/dt

SUPLESI TIU KAWA,


SUPLESI BATANG, AI TUI,
BB.15 KULIR & LUTUK SUPLESI TEBO RB. BATU & MERARAN
696 ha 13.0 ha 162 ha
B.16 Ki B.17 Ki
38.0 ha 44.84 I/dt 23.0 ha 27.14 I/dt

BB.18 SAL. SEKUNDER AI OLAT


BB.16 BB.17
SALURAN INDUK BINTANG BANO Terowongan Senayan KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT PROVINSI
DIREKTORAT JENDERAL SUMBER DAYA AIR NUSA TENGGARA BARAT
SAL. SEKUNDER BINTANG BANO
BB.19 BALAI WILAYAH SUNGAI NUSA TENGGARA I KABUPATEN
SATUAN KERJA BALAI WILAYAH SUNGAI NUSA TENGGARA I SUMBAWA BARAT
SATUAN KEGIATAN PERENCANAAN DAN PROGRAM
B.19 Ka B.19 Ki PEKERJAAN
88.50 I/dt Jl. Sandubaya KM.7 No. 1 Gerimak-Mataram 83371 Telp. (0370) 672282 Fax. 672345 REVIEW DESAIN JARINGAN IRIGASI DAN
75.0 ha 140 ha 165.20 I/dt
PENYEMPURNAAN DESAIN TEROWONGAN
BB.21 GAMBAR :
DI. BINTANG BANO

BB.20
BB.22 SKEMA JARINGAN IRIGASI NO. REGISTER :
B.20 Ki B.22 Ki B.21 Ka BINTANG BANO
146 ha 172.28 I/dt 172 ha 202.96 I/dt 110 ha 129.800 I/dt
Renc. Ekstensifikasi
634 ha 748.12 I/dt B.Muka-1 B.21 Ki PT. INDRA KARYA (PERSERO) WILAYAH I DIRENCANA TANGGAL SK NOMOR :
CONSULTING ENGINEERS
137 ha 161.660 I/dt TRUST & KNOWLEDGE
INK IN DO 3 07 1/T/02 72 .JTM

IND RA KARYA
I S O 9001
I K RCS No. 3411188
DIGAMBAR
B.20 Tg 29 MARET 2018 IK.02.04-AS/SAT.BWS 16
236 ha 278.48 I/dt DIPERIKSA Direksi Pekerjaan : Made Mira Charisma, ST., M.Eng. /SPK-PP/2356/2018

DISETUJUI PPK Perenc. & Program : Sri Utami Sudiarti, ST., MT.