You are on page 1of 1

- (*) All writings shall be fixed upon language decision.

388+500 388+600 388+700 388+800 - (**) Grounding & switching will be done during maintenance
- (***) See the infrastructure projects for infrastructure details
Siding Track 2 Siding Track 2 - See ground level plans and layout plans for detailed grading for the building
±0,000

Future Track Future Track


±0,000

Future Track Future Track


±0,000

Future Track Future Track


±0,000
SMALL RETAINING WALL

1060 1000 8207.5 2032.5 1600 2400 2400 1200 2800 6285

K
0005
J
0005

Siding Track 1 Siding Track 1

0201 ±0,000 ± 0.000


TD-8 +1.000 +1.000
-0.315 F E A A E 1 3

150
-0.315 -0.315 -0.315 -0.315 -0.315

75
-0.115 -0.165 -0.350 -0.165 -0.350 -0.165 -0.350

240

240

240
-0.350 -0.350 -0.350

410
-0.315 210x30x12cm -0.173
4 4 4 4 A A
±0.000

slope %1
Fence 210x30x12cm 210x30x20cm 210x30x20cm Concrete Stoper
Concrete Stoper Concrete Stoper Concrete Stoper slope %1
green area -0.350 -0.165
1300

slope %1
slope %1

slope %1
-0.355

600
840
slope
slope

slope

slope
slope %10 6085

490
3774.5

840
-0.165 ±0.000 -0.420
1

1300
0201 500 x Ø10 x 100cm
2 Car Parking 2 Car Parking Truck Weighbridge
-0.165 Steel Barrier
green area green area green area
TD-9

slope
B B +0.900 +0.900
Control

1844
2 -0.175 -0.184 2 -0.400

1969
Forklift Garage and

slope %1
200 2710 500 2790 120 1900 -0.420 -0.420
06
Maintenance Building
1 -0.411 -0.400 1 1 1
-0.190 -0.190

slope %1.70
04 05

500
slope %1.70
08 09
WC, Shower Building

730
1700 200 8167.5 -0.190 R200 R200
Mess Hall , Office Building
R20 -0.430 -0.430 -0.041

slope %1.74
slope %1.74
200 0

490
0201 0201
R A E 85

slope %10
01 TD-9 -0.469 -0.469 green area -0.469 -0.469 TD-9 -0.469
R1

R1
85

slope %1

R1
0 F E A 07

5417.5
60

R1

85
R200

85
R -0.272 -0.272 -0.272 -0.272 -0.272 -0.272 -0.272

1 Truck Parking 4 Truck Parking


5 R9 R185

%1
%1

%1

%1

%1
%1

%1
58 3

95

120

120
R -0.281 -0.281 -0.281 1 5

R4

R480

R80
-0.281

100 42.5
-0.481
R6

1425
-0.481 -0.481 -0.481 -0.281

3630
Fence 00 -0.481

R4 0
R5 -0.481
85

R4

15
100 1000 8207.5 2032.5 1600 2400 2400 1200 2800 6285

200

200
FD-05

0
200

slope %1
slope %1

slope %1
slope %1
680
42.5

815
Security Barrier 1

1510
370
400

370

370
FD-02 3 1 3500

0
200

R20
-0.555

400
370

-0.340
-0.350 5 -0.555 1

150
R18 -0.560 -0.560

130
-0.330
B B02
Truck Weighbridge

400

430

430
1 1
700

816

846

500
846
4180.5 green area 300 150 330

Security Control B.

160

130

130
03

350
A A 1
Truck Weighbridge
-0.420

130
R2
00

400

430
-0.440
370

-0.430

565
R18
-0.640
400 3 1

370

370

370

370
5
FD-02 200 -0.675 -0.675 -0.675 -0.675 -0.675

120 150
105 400

120 135
Security Barrier -0.525 -0.525 -0.525 -0.525 -0.525

1143
-0.542 -0.542 -0.542 -0.542 -0.542

120

120

120
-0.695 -0.695 -0.695 -0.695 -0.695

280

280

280

280
green area

600

600
Fence Fence Fence Fence Fence
See "All connection road" design for Freight Yard road connection Fence
CURB CENTER COORDINATE LIST

200

200

200

200
POINT NO X Y
0201 0201 0201
TD-13 TD-13 TD-13 01 582.407,306 1.308.995,049

±0.00 = 1.468,080
22700 02 582.411,570 1.309.009,073
03 582.415,176 1.309.011,698
04 582.384,476 1.309.021,845
05 582.383,887 1.309.022,653
06 582.362,073 1.309.051,178
07 582.297,998 1.309.146,008
08 582.287,945 1.309.154,893
SITE PLAN (freight yard) 09 582.279,117 1.309.167,020
2 1 : 200
K
0005
J
0005
10
11
582.180,991
582.146,963
1.309.318,913
1.309.356,631
12 582.146,375 1.309.357,440
13 582.117,472 1.309.397,150
14 582.109,036 1.309.408,739
15 581.966,667 1.309.598,247
16 581.958,986 1.309.592,656
17 581.936,073 1.309.631,842
18 581.926,284 1.309.645,291

ETHIOPIAN RAILWAYS CORPORATION (ERC)

AWASH - KOMBOLCHA - HARA GEBAYA


RAILWAY PROJECT
THIS DRAWING MUST NOT BE EITHER LOANED, COPIED OR OTHERWISE REPRODUCED IN WHOLE OR IN PART OR USED FOR ANY PURPOSE

Siding Track 1 Siding Track 1 Future Track Future Track Siding Track 1
6.560 6.560

5.890 5.890

Mimarlık Hizmetleri Ltd. Şti.


Architectural Ltd. Co.
REACH STACKERS WORKING AREA

STATIONS & AUXILIARY BUILDINGS


1
Freightyard Area Freightyard Area
Otta Seal 1 Otta Seal
Granular RoadBase GB1 15 cm
Otta Seal Granular RoadBase GB1 15 cm
1.277 Cement or lime stabilised roadbase CB1 (125mm) 1.277 Cement or lime stabilised roadbase CB1 (125mm) 1.277 Otta Seal S.O.G 20cm
Granular RoadBase GB1 15 cm Otta Seal Cement or lime stabilised roadbase CB2 (175mm)
Fence Concrete Block Pavement 6 cm
Cement or lime stabilised roadbase CB1 (125mm)
Cement or lime stabilised roadbase CB2 (175mm) 0.435
Cement or lime stabilised roadbase CB2 (175mm)
Capping Layer (Required for S1,S2,S3 subgrade) Fence Concrete Block Pavement 6 cm
Granular RoadBase GB1 15 cm
Cement or lime stabilised roadbase CB1 (125mm)
Concrete Block Pavement 6 cm
Sand 5 cm
Capping Layer (Required for S1,S2,S3 subgrade)
Compacted in situ Sub-Grade Fence Concrete Block Pavement 6 cm
Granular RoadBase GB1 15 cm
Cement or lime stabilised roadbase CB1 (125mm)
Lean Concrete 10cm
Layer III (CBGM-C8/10) 20cm HARAGEBAYA STATION
Sand 5 cm Capping Layer (Required for S1,S2,S3 subgrade) Compacted in situ Sub-Grade Sand 5 cm Cement or lime stabilised roadbase CB2 (175mm) Sand 5 cm Cement or lime stabilised roadbase CB2 (175mm) Layer II (CBGM-C8/10) 20cm
Stabilized Filling 10 cm
slope %1 Stabilized Filling 10 cm Compacted in situ Sub-Grade
slope %1
-0.211 -0.183
slope %1
R.C Curtain Wall Border (30cm, h:120cm)
-0.315
0.000 (1468.080) slope %1 Stabilized Filling 10 cm
Fill
Capping Layer (Required for S1,S2,S3 subgrade)
%1 Compacted in situ Sub-Grade
-0.213 Fill slope %1 R.C Curtain Wall Border (30cm, h:120cm)
-0.315
0.000 (1468.080) 0.000 (1468.080) slope %1 Stabilized Filling 10 cm
Fill
Capping Layer (Required for S1,S2,S3 subgrade)
Compacted in situ Sub-Grade slope %1
Layer I (CBGM-C8/10) 20cm
Crushed Rock 15cm slope %1 slope %1 -0.315
0.000 (1468.080)
FREIGHT YARD SITE PLAN 1#3
WITHOUT THE PRIOR WRITTEN PERMISSION OF YAPI MERKEZİ.

-0.545 Fill -0.525 -0.459 -0.545 -0.525 slope -0.459


slope %2 -0.545 -0.525 -0.545 Compacted Fill
-0.753 -0.723 -0.753 -0.723 -0.753 -0.723
-1.193 -0.413 -1.193 -0.413
-0.189 -1.193 CROSS SECTIONS
-0.695 -0.675
Channel -0.695 -0.675Channel slope %1.5 -0.695 -0.675Channel
slope %1.5
Ø200 Per. HDPE slope %1.5 5:1 slope %1.5
5 :1 Concrete curb slope %1.5 Trapezodial 5: 1 Concrete curb Trapezodial Trapezodial 1.7 Concrete curb Trapezodial
1.7 Mortar
Foundation 30 cm
1.7 Mortar
Foundation 30 cm
channel 75 Mortar
DRAWN BY DESIGNED BY CHECKED BY APPROVED BY APPROVED BY APPROVED BY APPROVED BY
Lean concrete 10 cm channel 75 Lean concrete 10 cm channel 75 channel 75
Lean concrete 10cm D Type Manhole degree wall angle Lean concrete 10cm D Type Manhole degree wall angle degree wall angle Lean concrete 10cm D Type Manhole degree wall angle
H.L. ALPER T. AYGUN Z. ONDER I. UNSAL L. HOROZOGLU Z. UYGUN E. CENGIZ
Fill Fill Fill
Freightyard Line Edge

300 280 140 700 605 705 1600 325

Freightyard Line Edge


A Type Manhole A Type Manhole A Type Manhole
PAVEMENT TWO WAY DRIVE WAITING AREA 3 ROWS OF CONTEINER REACH STACKERS WORKING AREA
Siding Track Axis 1

Siding Track Axis 1

Siding Track Axis 1


NATURAL LAND

Freightyard Line
Freightyard Line

300 280 140 3610 150 175 950 510

Freightyard Line

Platform Edge
Platform Edge

Platform Edge

Future Track

Future Track
300 280 140 3610 150 175 300 280 140 1305 2305 150 175
Ø300 Cor. HDPE Ø300 Cor. HDPE Ø300 Cor. HDPE Ø300 Cor. HDPE
PAVEMENT PAVEMENT NATURAL LAND PAVEMENT OTTA SEAL FLOORING CONCRETE FLOORING ORIGINAL DRAWING NO
A0+4A4
NATURAL LAND TRUCK MANEUVER SPACE NATURAL LAND TRUCK MANEUVER SPACE RAIL WEIGHBRIDGE CONTROL
Type Manhole C2 Type Manhole C2 Type Manhole C2 Type Manhole C2 Type Manhole FORMAT
FREIGHTYARD FREIGHTYARD FREIGHTYARD
SCALE OF

SECTION D-D SECTION E-E Rail Weighbridge


SECTION F-F OR.FORMAT 1/200, 1/100
AKH - YMI - DD - FY10X - D - AR - DWG - 0111 - 1
2 1 : 100
3 1 : 100
4 1 : 100
DATE 27.11.2017
PROJECT ORGANIZATION STAGE LOCATION CATEGORY DISCIPLINE TYPE OF DOCUMENT NUMBER VERSION

PAGE 1/1

You might also like