Professional Documents
Culture Documents
388+500 388+600 388+700 388+800 - (**) Grounding & switching will be done during maintenance
- (***) See the infrastructure projects for infrastructure details
Siding Track 2 Siding Track 2 - See ground level plans and layout plans for detailed grading for the building
±0,000
1060 1000 8207.5 2032.5 1600 2400 2400 1200 2800 6285
K
0005
J
0005
150
-0.315 -0.315 -0.315 -0.315 -0.315
75
-0.115 -0.165 -0.350 -0.165 -0.350 -0.165 -0.350
240
240
240
-0.350 -0.350 -0.350
410
-0.315 210x30x12cm -0.173
4 4 4 4 A A
±0.000
slope %1
Fence 210x30x12cm 210x30x20cm 210x30x20cm Concrete Stoper
Concrete Stoper Concrete Stoper Concrete Stoper slope %1
green area -0.350 -0.165
1300
slope %1
slope %1
slope %1
-0.355
600
840
slope
slope
slope
slope
slope %10 6085
490
3774.5
840
-0.165 ±0.000 -0.420
1
1300
0201 500 x Ø10 x 100cm
2 Car Parking 2 Car Parking Truck Weighbridge
-0.165 Steel Barrier
green area green area green area
TD-9
slope
B B +0.900 +0.900
Control
1844
2 -0.175 -0.184 2 -0.400
1969
Forklift Garage and
slope %1
200 2710 500 2790 120 1900 -0.420 -0.420
06
Maintenance Building
1 -0.411 -0.400 1 1 1
-0.190 -0.190
slope %1.70
04 05
500
slope %1.70
08 09
WC, Shower Building
730
1700 200 8167.5 -0.190 R200 R200
Mess Hall , Office Building
R20 -0.430 -0.430 -0.041
slope %1.74
slope %1.74
200 0
490
0201 0201
R A E 85
slope %10
01 TD-9 -0.469 -0.469 green area -0.469 -0.469 TD-9 -0.469
R1
R1
85
slope %1
R1
0 F E A 07
5417.5
60
R1
85
R200
85
R -0.272 -0.272 -0.272 -0.272 -0.272 -0.272 -0.272
%1
%1
%1
%1
%1
%1
%1
58 3
95
120
120
R -0.281 -0.281 -0.281 1 5
R4
R480
R80
-0.281
100 42.5
-0.481
R6
1425
-0.481 -0.481 -0.481 -0.281
3630
Fence 00 -0.481
R4 0
R5 -0.481
85
R4
15
100 1000 8207.5 2032.5 1600 2400 2400 1200 2800 6285
200
200
FD-05
0
200
slope %1
slope %1
slope %1
slope %1
680
42.5
815
Security Barrier 1
1510
370
400
370
370
FD-02 3 1 3500
0
200
R20
-0.555
400
370
-0.340
-0.350 5 -0.555 1
150
R18 -0.560 -0.560
130
-0.330
B B02
Truck Weighbridge
400
430
430
1 1
700
816
846
500
846
4180.5 green area 300 150 330
Security Control B.
160
130
130
03
350
A A 1
Truck Weighbridge
-0.420
130
R2
00
400
430
-0.440
370
-0.430
565
R18
-0.640
400 3 1
370
370
370
370
5
FD-02 200 -0.675 -0.675 -0.675 -0.675 -0.675
120 150
105 400
120 135
Security Barrier -0.525 -0.525 -0.525 -0.525 -0.525
1143
-0.542 -0.542 -0.542 -0.542 -0.542
120
120
120
-0.695 -0.695 -0.695 -0.695 -0.695
280
280
280
280
green area
600
600
Fence Fence Fence Fence Fence
See "All connection road" design for Freight Yard road connection Fence
CURB CENTER COORDINATE LIST
200
200
200
200
POINT NO X Y
0201 0201 0201
TD-13 TD-13 TD-13 01 582.407,306 1.308.995,049
±0.00 = 1.468,080
22700 02 582.411,570 1.309.009,073
03 582.415,176 1.309.011,698
04 582.384,476 1.309.021,845
05 582.383,887 1.309.022,653
06 582.362,073 1.309.051,178
07 582.297,998 1.309.146,008
08 582.287,945 1.309.154,893
SITE PLAN (freight yard) 09 582.279,117 1.309.167,020
2 1 : 200
K
0005
J
0005
10
11
582.180,991
582.146,963
1.309.318,913
1.309.356,631
12 582.146,375 1.309.357,440
13 582.117,472 1.309.397,150
14 582.109,036 1.309.408,739
15 581.966,667 1.309.598,247
16 581.958,986 1.309.592,656
17 581.936,073 1.309.631,842
18 581.926,284 1.309.645,291
Siding Track 1 Siding Track 1 Future Track Future Track Siding Track 1
6.560 6.560
5.890 5.890
Freightyard Line
Freightyard Line
Freightyard Line
Platform Edge
Platform Edge
Platform Edge
Future Track
Future Track
300 280 140 3610 150 175 300 280 140 1305 2305 150 175
Ø300 Cor. HDPE Ø300 Cor. HDPE Ø300 Cor. HDPE Ø300 Cor. HDPE
PAVEMENT PAVEMENT NATURAL LAND PAVEMENT OTTA SEAL FLOORING CONCRETE FLOORING ORIGINAL DRAWING NO
A0+4A4
NATURAL LAND TRUCK MANEUVER SPACE NATURAL LAND TRUCK MANEUVER SPACE RAIL WEIGHBRIDGE CONTROL
Type Manhole C2 Type Manhole C2 Type Manhole C2 Type Manhole C2 Type Manhole FORMAT
FREIGHTYARD FREIGHTYARD FREIGHTYARD
SCALE OF
PAGE 1/1