You are on page 1of 1

389+200 389+300 389+400

650

650
- (*) All writings shall be fixed upon language decision.
Siding Track 2 Siding Track 2
- (**) Grounding & switching will be done during maintenance
- (***) See the infrastructure projects for infrastructure details
- See ground level plans and layout plans for detailed grading for the building
650

650
Future Track Future Track
650

650
Future Track Future Track

510
Future Track Future Track
E
SMALL RETAINING WALL 0003
SMALL RETAINING WALL
1460

20000 1600 1800 1679.5 230 2246 230 3934.5 480

950
F Rail Weighbridge D
-0.415 0003 0003

Siding Track 1 Siding Track 1 1


± 0.000 ± 0.000 ± 0.000
325

325
Ø200 Per. HDPE

325
± 0.000
-0.315 -0.315 -0.315 -0.315 -0.315 -0.315

135 30
Faucet + Drain
C A 1 2

00
-0.324

R2

240
1700
5
R18 -0.124
2 2 B B

slope %1
slope %1
slope %1

slope %1
16 Hose holder

slope %1
1
1000

Fence

slope %1
Rail Weighbridge
A A Control 18

slope %1
17

1350

1200
-0.200
REACH STACKERS
Wc Building
5
685 R18
WORKING AREA
-0.213 R2
00

00

R18
-0.413

R2
2305

-0.415 1 2

5
15 1 1
GANTRY CRANE

5000
R2
00
1 1
polymer concrete rainwater channel

R18
1305

Loading Machine Garage

5
C and Repair B.(Canopy) (t1) A
10000 1600 2700 855.1 380 R1667

4380.2
slope %1
slope %1

slope %1
1470
-0.546 Water Outlet -0.546
Fence

LOADING AREA LOADING AREA


605

1
350

350
1
1
370

370
-0.675 -0.675 -0.675 -0.675
-0.525 -0.525 -0.525 -0.525
-0.542 -0.542 -0.542 -0.542
120

120
-0.695 -0.695 -0.695 -0.695
280

280
Fence Fence Fence Fence
Fence
200

200
0201 0201 0201
TD-13 TD-13 TD-13
10000 12200

Reach Stackers Working Area

±0.00 = 1.468,080
F E D
0003 0003 0003
SITE PLAN (freight yard)
4 1 : 200

B A
Siding Track 1

5.450 5.379
5.020 5.020
150

1
Freightyard Area
0.01
1.277 Forklift Garage and Repair
Otta Seal
Granular RoadBase GB1 15 cm
CURB CENTER COORDINATE LIST Fence Concrete Block Pavement 6 cm Cement or lime stabilised roadbase CB1 (125mm)
R.C Curtain Wall Border
Sand 5 cm Cement or lime stabilised roadbase CB2 (175mm)
slope %1 Stabilized Filling 10 cm Capping Layer (Required for S1,S2,S3 subgrade) -0.042 slope %1 0.000 (1468.080) (30cm, h:120cm) 0.000 (1468.080)
POINT NO X Y Fill Compacted in situ Sub-Grade slope %10 -0.150 -0.165 -0.315
-0.545 -0.525 slope %1 slope %1 -0.481
01 582.407,306 1.308.995,049 -0.753 -0.723
02 582.411,570 1.309.009,073 -1.193 -0.350
03 582.415,176 1.309.011,698 -0.695 -0.675Channel
Ø200 Per. HDPE slope %1.5
04 582.384,476 1.309.021,845 1
75:
Concrete curb Trapezodial
05 582.383,887 1.309.022,653 1. Mortar Foundation 30 cm
channel 75
Lean concrete 10 cm
06 582.362,073 1.309.051,178 Lean concrete 10cm D Type Manhole degree wall angle
Fill
07 582.297,998 1.309.146,008

Building Axis
08 582.287,945 1.309.154,893
09 582.279,117 1.309.167,020

Freightyard Line Edge


A Type Manhole

Siding Track Axis 1


10 582.180,991 1.309.318,913 600 240 325
11 582.146,963 1.309.356,631

Building Axis
12 582.146,375 1.309.357,440 300 280 140 700 2910
582.117,472 1.309.397,150 PAVEMENT TWO WAY DRIVE LOADING AREA FORKLIFT GARAGE and REPAIR

ETHIOPIAN RAILWAYS CORPORATION (ERC)


13 NATURAL LAND
14 582.109,036 1.309.408,739
15 581.966,667 1.309.598,247 FREIGHTYARD
16 581.958,986 1.309.592,656
17 581.936,073 1.309.631,842 SECTION J-J
18 581.926,284 1.309.645,291 8
AWASH - KOMBOLCHA - HARA GEBAYA
1 : 100
LEGEND FREIGHT YARD ARRANGEMENT AREAS
RAILWAY PROJECT
Station Arrangement Area Forklift Garage and Repair Building 87 m²

Pedestrian Area, Rail Weighbridge Control Area


Loading Machine Garage and Repair B(Canopy) 270 m²
Concrete block pavement 6cm
Freight Yard Area
Mess Hall Office 169 m²
Otta Seal
Platform & Working Area
Warehouse 852 m²
Concrete 20cm Siding Track 1 Future Track Future Track Future Track Siding Track 2 CL (Mainline) Future Track Siding Track 3

Shelter, Waste Water Treatment Area


WC Building 24 m²
Macadam 1 4
Green Area WC,Shower & Dressing Building 179 m²
4.1084.193 Mimarlık Hizmetleri Ltd. Şti.
3.774 3.774 Architectural Ltd. Co.

Soil Area Security Control Building 63 m²


2.933

STATIONS & AUXILIARY BUILDINGS


3.700 3.700
Pedestrian Area, Rail Weighbridge Control Area 1 Freightyard Area
Roof 1.725 m²
Concrete block pavement 6cm 2.858
0-04 0-11
Freight Yard Area 1.277 Corridor
Cleaning Room

Fence 18.767 m²
Otta Seal Fence Concrete Block Pavement 6 cm Concrete Paver 6 cm
Concrete Block Pavement 6 cm
Sand 5 cm slope %1.74 slope %1 R.C Curtain Wall Border
HARAGEBAYA STATION
Sand 5 cm Stabilized Filling 10 cm 0.150 0.180 0.100 (30cm, h:120cm)
F
Flag
Platform & Working Area
7.934 m²
slope %1 Stabilized Filling 10 cm
Sand 5 cm
Stabilized Filling 10 cm -0.281 slope %1 Fill -0.190 -0.165 -0.185
0.000 (1468.080)
FREIGHT YARD SITE PLAN 3#3
WITHOUT THE PRIOR WRITTEN PERMISSION OF YAPI MERKEZİ.

-0.545 Fill -0.525 slope %1


Concrete 20cm -0.753 -0.723 -0.640 -0.585 Fill

-1.193
-0.481
-0.150
-0.350 -0.315
-0.945
CROSS SECTIONS
Green Area 2.461 m² -0.695 -0.675 Channel
slope %1.5 slope %1.5 slope %1.67 slope %1.5 slope %1.5 slope %1.5
Ø200 Per. HDPE slope %1.5 slope %1.5
Otta Seal Concrete Block Pavement 6 cm
-1.384 Concrete curb Foundation 30 cm Trapezodial Trapezodial Trapezodial
Siding Track Axis 1

Granular RoadBase GB1 15 cm Sand 5 cm


Mortar Lean concrete 10 cm
IM00, WASTE WATER, SHELTER A. Soil Area 5.186 m² Lean concrete 10cm D Type Manhole Cement or lime stabilised roadbase CB1 (125mm) Stabilized Filling 10 cm channel 75
degree wall angle
channel 75
degree wall angle
channel 75
degree wall angle DRAWN BY DESIGNED BY CHECKED BY APPROVED BY APPROVED BY APPROVED BY APPROVED BY

Siding Track 2

Siding Track 3
Cement or lime stabilised roadbase CB2 (175mm) Fill

CL (Mainline)
H.L. ALPER T. AYGUN Z. ONDER I. UNSAL L. HOROZOGLU Z. UYGUN E. CENGIZ
Fill

Future Track

Future Track

Future Track

Future Track
Capping Layer (Required for S1,S2,S3 subgrade)
Compacted in situ Sub-Grade

IM00-Typ.Integrated Maintenance Workshop 686 m² Concrete Curb 396 m² A Type Manhole


300 280 140 100 30 400 160 400 30 1410 840 240 325 950 510 650 650 650 1400 650
HARAGEBAYA STATION - FREIGHT YARD 1840 2490 325 5460
TW00-Train Washing Facility 92 m² 38.985 m² Ø300 Cor. HDPE Ø300 Cor. HDPE Ø300 Cor. HDPE
TOTAL AREA
NATURAL LAND PAVEMENT TRUCK WEIGHBRIDGE LOADING AREA MESSHALL OFFICE BUILDING TRAIN ROAD ORIGINAL
A0+2A4
DRAWING NO
C2 Type Manhole C2 Type Manhole C2 Type Manhole FORMAT
Waste Water Treatment 39 m² SCALE OF
AKH - YMI - DD - FY10X - D - AR - DWG - 0113 - 1
Soil area + Green Aea = 7.647 m² / 5 (%20) = 1.529,4 m² green area
OR.FORMAT 1/200, 1/100
2.461 m² < 1.529 m² SECTION K-K
Shelter Buildings (x 2) 49 x 2 = 98 m² 9 1 : 100
DATE 27.11.2017
PROJECT ORGANIZATION STAGE LOCATION CATEGORY DISCIPLINE TYPE OF DOCUMENT NUMBER VERSION

PAGE 1/1