Gamma Education & Training Pty Ltd RTO Code: 41477 CRICOS PROVIDER CODE: 03580F V3.2 112019
This learner resource guide supports BSBRSK501 MANAGE RISK
All rights reserved. No part of this publication may be reproduced or transmitted in any form or
by any means, electronic or mechanical, including photocopying, scanning, recording, or any
information storage and retrieval system, without permission in writing from the Author.
Teachers, trainers and trainees are directed to the relevant legislation, regulations, and codes of
practice and guidance notes for an authoritative understanding of regulatory requirements. This
learner guide should be read in conjunction with relevant legislation and is not a substitute for
it.
Every effort has been made to trace and acknowledge copyrighted material. The author tenders
his/her apologies should any infringement have occurred. Images contained are used under
licence.
This learner resource will help you build the skills required to meet the performance criteria of
this unit:
It’s important that Learning and Assessment is conducted in a safe environment where your
assessment work demonstrates consistent performance of typical activities experienced in the
management and leadership field of work.
STUDENT INFORMATION
Throughout your training we are committed to your learning by providing a training and assessment framework
that ensures the knowledge gained through training is translated into practical on the job improvements.
Your ability to recognise common principles and actively use these on the job.
All of your assessment and training is provided as a positive learning tool. Your assessor will guide your learning
and provide feedback on your responses to the assessment materials until you have been deemed competent in
this unit.
What happens if your result is ‘Not Yet Competent’ for one or more assessment tasks?
Our assessment process is designed to answer the question “has the desired learning outcome been achieved
yet?” If the answer is “Not yet”, then we work with you to see how we can get there.
In the case that one or more of your assessments has been marked ‘NYC’, your trainer will provide you with the
necessary feedback and guidance, in order for you to resubmit your responses.
What if you disagree on the assessment outcome?
You can appeal against a decision made in regard to your assessment. An appeal should only be made if you
have been assessed as ‘Not Yet Competent’ against a specific unit and you feel you have sufficient grounds to
believe that you are entitled to be assessed as competent. You must be able to adequately demonstrate that you
have the skills and experience to be able to meet the requirements of units you are appealing the
assessment of.
Your trainer will outline the appeals process, which is available to the student. You can request a form to
make an appeal and submit it to your trainer, the course coordinator, or the administration officer. The RTO will
examine the appeal and you will be advised of the outcome within 14 days. Any additional information you wish
to provide may be attached to the appeal form.
Assessor Responsibilities
Assessors need to be aware of their responsibilities and carry them out appropriately. To do this they need to:
Ensure that participants are assessed fairly based on the outcome of the language, literacy and
numeracy review completed at enrolment.
Ensure that all documentation is signed by the student, trainer, workplace supervisor and assessor
when units and certificates are complete, to ensure that there is no follow-up required from an
administration perspective.
When required, request the manager or supervisor to determine that the student is
‘satisfactorily’ demonstrating the requirements for each unit. ‘Satisfactorily’ means consistently
meeting the standard expected from an experienced operator.
When required, ensure supervisors and students sign off on third party assessment forms or third-
party report.
For a book: Author surname, author initial Year of publication, Title of book, Publisher, City, State
Assessment Guide
The following table shows you how to achieve a satisfactory result against the criteria for each type of
assessment task. The following is a list of general assessment methods that can be used in assessing a unit of
competency. Check your assessment tasks to identify the ones used in this unit of competency.
You will receive an overall result of Competent or Not Yet Competent for the unit. The assessment process is made up of a number
of assessment methods. You are required to achieve a satisfactory result in each of these to be deemed competent overall. Your
assessment may include the following assessment types.
Questions All questions answered correctly Incorrect answers for one or more questions
Answers address the question in full; referring to Answers do not address the question in full.
appropriate sources from your workbook and/or Does not refer to appropriate or correct
workplace sources.
Third Party Report Supervisor or manager observes work performance Could not demonstrate consistency. Could
and confirms that you consistently meet the not demonstrate the ability to achieve the
standards expected from an experienced operator required standard
Written Activity The assessor will mark the activity against the detailed Does not follow guidelines/instructions
guidelines/instructions
Attachments if requested are attached Requested supplementary items are not attached
All requirements of the written activity are Response does not address the requirements in
addressed/covered. full; is missing a response for one or more areas.
Responses must refer to appropriate sources from One or more of the requirements are
your workbook and/or workplace answered incorrectly.
Does not refer to or utilise appropriate or
correct sources of information
Observation All elements, criteria, knowledge and performance Could not demonstrate elements, criteria,
/Demonstration evidence and critical aspects of evidence, are knowledge and performance evidence and/or
demonstrated at the appropriate AQF level critical aspects of evidence, at the
appropriate AQF level
Case Study All comprehension questions answered correctly; Lack of demonstrated comprehension of the
demonstrating an application of knowledge of the underpinning knowledge (remove) required
topic case study. to complete the case study questions correctly.
One or more questions are answered
incorrectly.
Answers address the question in full; referring to Answers do not address the question in full; do
appropriate sources from your workbook and/or not refer to appropriate sources.
workplace
Practical Activity All tasks in the practical activity must be competed Tasks have not been completed effectively and
and evidence of completion must be provided to evidence of completion has not been
your trainer/assessor. provided.
All tasks have been completed accurately and
evidence provided for each stated task.
Attachments if requested are attached Requested supplementary items are not attached
STUDENT ASSESSMENT AGREEMENT
Make sure you read through the assessments in this booklet before you fill out and sign the
agreement below. If there is anything that you are unsure of, consult your assessor prior to
signing this agreement.
Have you read the assessment requirements for this unit? Yes No
Do you understand the requirements of the assessments for this unit? Yes No
Do you agree to the way in which you are being assessed? Yes No
Do you have any specific needs that should be considered? Yes No
If so, explain these in the space below.
Do you understand your rights to re-assessment? Yes No
Do you understand your right to appeal the decisions made in an assessment?
Yes No
Student name
Student number
Student signature
Start date
Assessor name
ASSESSMENT 1 COVER SHEET
Student Declaration
To be filled out and submitted with assessment responses
I declare that this task is all my own work and I have not cheated or plagiarised the work or
colluded with any other student(s).
I understand that if I am found to have plagiarised, cheated or colluded, action will be taken
against me according to the process explained to me.
I have correctly referenced all resources and reference texts throughout these assessment
tasks.
Student name
Student ID number
Student signature
Assessor declaration
I hereby certify that this student has been assessed by me and that the assessment has
been carried out according to the required assessment procedures.
Assessor name
Assessor signature
A copy of this page must be supplied to the office and kept in the student’s file with the evidence.
ASSESSMENT 1 – ESTABLISH RISK CONTEXT
INSTRUCTIONS
The assessment must be written using an industry standard software package such as
Microsoft Word, Excel, PowerPoint, etc. Alternatively, a paper-based assessment can be
provided.
Name the file using the assessment task number and then save your file.
Ensure your submission identifies the unit code and title, the assessment task number and
the name of the assessment at the top of the page. Alternatively, you may place this
information in the document header.
Add your name and student number to the header or footer of every page.
On completion, submit your assessment to your assessor
However, you must discuss this with your assessor and gain approval prior to commencing the
relevant assessment task. Any assumptions about organisational policies or procedures or
operational processes which affect the responses to an assessment task must be listed at the
start of your assessment.
Slips, trips and falls in aisles, register area and the outdoor plant area from watered • Any spills need to be quickly identified and alerted with appropriate signage
plants or hoses (wet floor – spill hazard) and then mopped up immediately
• Mops are placed in plant area and the register area
• Weekly profit/ loss statements need to be produced for each section of the
Loss of income due to economic conditions. These include centre, and reported to the senior management committee
lack of customers in both the garden centre and café
Loss of income due to environmental conditions. These • Weekly report of expenditures incurred due to reactive
include heatwave causing extra costs for watering, or flooding in some environmental management. These may include extra staff for watering
locations incurring damage or stock loss. and relocation of stock in the face of heat waves, severe storms or
flooding events. These need to be reported to the senior management
committee
Legal issue due to insurance claim from injured customer • Conduct monthly compliance audits to identify and potential issues and create
action plan to address these
Gamma Education & Training Pty Ltd RTO Code: 41477 CRICOS PROVIDER CODE: 03580F V3.2 112019
BSBRSK501 Manage Student Assessment Tasks
risk
Using the risk management standards AS/NZS ISO 31000:2009 Risk management –
Principles and guidelines from the unit Manage risk, Topic 1, screen 7, list all the gaps
between Kingfisher’s current risk management process and the standards.
Situations
• Political- Ban on imports from China. Increase of investment and creating of stricter regulations for
environmental protection.
• Economic- There is a steady growth of profit for past three years in all the sectors.
• Social- Environment protection policies are undertaken with the use of good quality products in social,
seeds etc.
• Legal- The legal are policies are all re negotiated with the addition of some new policies.
• Technological- Developing and making the total system up to date.
• Policy- The policies are carefully revised according to the changes in government policy.
• Staffing- Proper and eligible staff are employed.
Locations
There are around four head office and three garden center locations.
• Head Office in Fairfield, Victoria
• South Morang, Victoria
• Kenmore, Queensland
• Willoughby, New South Wales
Stakeholders
Internal stakeholders
• National General Manager
• National Manager of Operations
• National Manager of Finance & Legal
• National Manager – Legal Services
• National Manager of Human Resources
External stakeholders
• Plant supplier
• Seafood supplier
• Meat supplier
• Alcoholic beverage supplier
• Non-alcoholic beverage supplier
Gamma Education & Training Pty Ltd RTO Code: 41477 CRICOS PROVIDER CODE: 03580F V3.2 112019
Task 1.4 Identify stakeholders and their issues
List at least three internal and three external stakeholders, and any possible issues that
they may have in the risk management process. Base your answer on the Kingfisher
background information.
• National coordinator of garden center The coordinator does not supervise its subordinates in doing
any job.
• Food and Beverage manager The quality of food supplied is not up to the mark and the
foods are not fresh.
• National coordinators for customer service The coordinator lacks a lot, the customer
are not taken successfully.
• Fresh produce supplier • The products such as fresh products are not at all
fresh and prices are high compared to other shops.
Political
Keeping of proper records of expense Profit recorded may show wrong balance.
Economic
Management of shop products Causes problem to the customers.
Social
Context
At least 2 Issues to Possible effect
consider
Legal
New points to be added to old New policy covers all the changes.
policy
Policy
Task 1.6 Review legislation
Complete an internet search and find three pieces of legislation or codes of practice that could
have an impact on the Kingfisher Garden Centre’s risk management process.
Include the following details:
Name of the legislation/code of practice
Explain how it impacts the risk management process of the Kingfisher Garden Centre
Environment
Workplace
Health
and safety
Task 1.7 Review strengths and weaknesses of existing arrangements
What are the strengths and weaknesses, opportunities and threats of the Kingfisher
Garden Centre’s current risk management process?
Strengths Weaknesses
Goodwill Risk are not calculated
Easy accessibility Accidents not taken into account
Frequent use by old people Changes in suppliers not known (Ho et al. 2015)
No communication between the new groups
Opportunities Threats
Provide insights and support to the Board of financial uncertainty, legal liabilities, strategic management
Directors. errors, accidents and natural disasters.
Get credit for cooperation.
Build a better defence to class-actions.
Reduce business liability.
Frame regulatory issues.
Remember:
Strengths are aspects of the risk management process that can help it to succeed.
Weaknesses are aspects of the risk management process that can cause it to fail.
Opportunities can be actions or stakeholders that could help the risk management process to
succeed.
Threats can be actions or stakeholders that could cause the risk management process to fail.
Task 1.8 Document goals
Using all the background information you have collected from 1.1 to 1.7, create at least
three goals and critical success factors for the risk management process. List them below.
Critical Success Factors are aspects of the goal or risk management plan that will ensure that it
will succeed.
Task 1.9 Communicate with relevant parties
Outline the communication processes you will use to communicate each step of the risk
management process to managers, team members and other stakeholders.
Testers Email
Student’s name:
Completed
Did the student provide a sufficient and successfully
Comments (If required)
clear answer that addresses the
suggested answer for the following? Yes No
Task 1
Task 2
Task 3
Task 4
Task 5
Task 6
Task 7
Task 8
Task 9
Assessor signature
Madan Lepcha
Assessor name
ASSESSMENT 2 COVER SHEET
Student Declaration
To be filled out and submitted with assessment responses
I declare that this task is all my own work and I have not cheated or plagiarised the work or
colluded with any other student(s).
I understand that if I am found to have plagiarised, cheated or colluded, action will be taken
against me according to the process explained to me.
I have correctly referenced all resources and reference texts throughout these assessment
tasks.
Student name
Student ID number
Student signature
Assessor declaration
I hereby certify that this student has been assessed by me and that the assessment has
been carried out according to the required assessment procedures.
Madan Lepcha
Assessor name
Assessor signature
A copy of this page must be supplied to the office and kept in the student’s file with the evidence.
ASSESSMENT 2 – IDENTIFY RISKS
INSTRUCTIONS
The assessment must be written using an industry standard software package such as
Microsoft Word, Excel, PowerPoint, etc. Alternatively, a paper-based assessment can be
provided.
Name the file using the assessment task number and then save your file.
Ensure your submission identifies the unit code and title, the assessment task number
and the name of the assessment at the top of the page. Alternatively, you may place this
information in the document header.
Add your name and student number to the header or footer of every page.
On completion, submit your assessment to your assessor
However, you must discuss this with your assessor and gain approval prior to commencing the
relevant assessment task. Any assumptions about organisational policies or procedures or
operational processes which affect the responses to an assessment task must be listed at the
start of your assessment.
Stage 2 – Tasks
Complete the following tasks using the information about the Kingfisher Garden Centre.
Remember you are able to add more information if you are unable to locate it on the Kingfisher
intranet or in the background information provided but discuss this with your assessor first.
Task 2.1 Complete a consultation plan of the activities you will run so that staff can assist with
the risk identification process.
Task 2.2 Outline all the tools and techniques you will use to identify risks.
Task 2.3 Identify all the risks in the Kingfisher Garden Centre. Place these in the risk
identification template.
Task 2.1 Consultation plan
Complete a consultation plan of the activities you will run so that staff can assist with the
risk identification process.
Consultation plan
Risk management project team Week 4 Each team attends a brainstorming session run by risk
Brainstorm All team members management project team.
Risk management project team Week 5 Go through existing risk logs/incident reports.
Worst-case scenario
All team members in team meetings 1. Determine what happened.
2. Determine why it happened.
3. Figure out what to do to reduce the likelihood that it
will happen again.
Risk management project team Week 4 A risk management expert is invited into the garden centre to
Walk-through workplace All team members in team meetings look around and check the documents and procedures
currently in place. They create a report of possible risks.
26
Gamma Education & Training Pty Ltd RTO Code: 41477 CRICOS PROVIDER CODE: 03580F V3.2 112019
Task 2.3 – Business risk identification
Using all the information you have gathered and the Kingfisher background information, identify all the
risks in the Kingfisher Garden Centre.
Go to your ‘Course files’ and open Assessment 2B Business risk identification template. Save the
template locally to your computer and complete the information.
Save and submit your template to your assessor when completed.
You must identify at least one risk from each of following topics. List these in your template under
‘Category of risk’.
Natural disasters
Pandemic
Legal
Global events
Technology
Regulatory and government policy changes
Environmental
Work health and safety
Property and equipment
Security
Staffing
Suppliers
Market
Utilities and services
Identify potential harm or consequences, category of risk, level of risk, location of risk, worst-case
scenario, who was consulted (each column in the template).
You must identify at least eight risks altogether.
Remember: you are identifying all the business risks which could affect the business’s success.
Pandemic- Fever
Environmental- Asbestos
Suppliers - Compliance
27
Gamma Education & Training Pty Ltd RTO Code: 41477 CRICOS PROVIDER CODE: 03580F V3.2 112019
BSBRSK501 MANAGE RISK
Task 2.3: Business risk identification template (see page 32 of Learner Guide). Use the process in Task.3.1. to determine the Level of Risk.
30
Gamma Education & Training Pty Ltd RTO Code: 41477 CRICOS PROVIDER CODE: 03580F V3.2 112019
Date of assessment: BSBRSK501 MANAGE RISK Name of person completing assessment:
Department/work area/task assessed: Kingfisher Garden Centre
Business risks Potential harm Category of risk 1. Level of Location Worst- Who was
identified or Political risk case consulted
consequences Economic scenario ?
Severity
Likelihood
Risk priority
Social Legal
Technology
Procedure
Severity
Likelihood
Risk priority
Social Legal
Technology
Procedure
Student’s name:
Completed
Did the student provide a sufficient and successfully
Comments (If required)
clear answer that addresses the
suggested answer for the following? Yes No
Task 1
Task 2
Task 3
Assessor signature
Madan Lepcha
Assessor name
BSBRSK501 MANAGE RISK
Student Declaration
To be filled out and submitted with assessment responses
I declare that this task is all my own work and I have not cheated or plagiarised the work or
colluded with any other student(s).
I understand that if I am found to have plagiarised, cheated or colluded, action will be taken
against me according to the process explained to me.
I have correctly referenced all resources and reference texts throughout these assessment
tasks.
Student name
Student ID number
Student signature
Assessor declaration
I hereby certify that this student has been assessed by me and that the assessment has
been carried out according to the required assessment procedures.
Madan Lepcha
Assessor name
Assessor signature
A copy of this page must be supplied to the office and kept in the student’s file with the evidence.
32
Gamma Education & Training Pty Ltd RTO Code: 41477 CRICOS PROVIDER CODE: 03580F V3.2 112019
ASSESSMENT 3 – ASSESS RISKS
INSTRUCTIONS
The assessment must be written using an industry standard software package such as
Microsoft Word, Excel, PowerPoint, etc. Alternatively, a paper-based assessment can be
provided
Name the file using the assessment task number and then save your file.
Ensure your submission identifies the unit code and title, the assessment task number
and the name of the assessment at the top of the page. Alternatively, you may place this
information in the document header.
Add your name and student number to the header or footer of every page.
On completion, submit your assessment to your assessor
However, you must discuss this with your assessor and gain approval prior to commencing the
relevant assessment task. Any assumptions about organisational policies or procedures or
operational processes which affect the responses to an assessment task must be listed at the
start of your assessment.
Likelihood
Severity
Risk priority
Members leave the organization high
Red condition: High risk – these risk scores are high in impact and probability.
Yellow condition: These risks are somewhat high in impact and probability.
Green condition: Risks with a green label are generally fairly low in impact, probability, or both.
Task 3.2 Evaluate and prioritise risks for treatment based on the example given on page
37 of the Learner Guide.
Risk matrix
Industrial fridge Power shortage issues
breakdown
Very high
severity
4
Theft of
stock or damage
to the business
due to flood
Employees leave the Food
job contamination due to Breakout
water of fire
High severity
3
Medium
severity Staff members
2 injured
LIKELIHOOD
ASSESSMENT 3 CHECKLIST
Student’s name:
Completed
Did the student provide a sufficient and successfully
Comments (If required)
clear answer that addresses the
suggested answer for the following? Yes No
Task 1
Task 2
Assessor signature
Madan Lepcha
Assessor name
ASSESSMENT 4 COVER SHEET
Student Declaration
To be filled out and submitted with assessment responses
I declare that this task is all my own work and I have not cheated or plagiarised the work or
colluded with any other student(s).
I understand that if I am found to have plagiarised, cheated or colluded, action will be taken
against me according to the process explained to me.
I have correctly referenced all resources and reference texts throughout these assessment
tasks.
Student name
Student ID number
Student signature
Assessor declaration
I hereby certify that this student has been assessed by me and that the assessment has
been carried out according to the required assessment procedures.
Madan Lepcha
Assessor name
Assessor signature
A copy of this page must be supplied to the office and kept in the student’s file with the evidence.
ASSESSMENT 4 – RISK TREATMENT
INSTRUCTIONS
The assessment must be written using an industry standard software package such as
Microsoft Word, Excel, PowerPoint, etc. Alternatively, a paper-based assessment can be
provided
Name the file using the assessment task number and then save your file.
Ensure your submission identifies the unit code and title, the assessment task number
and the name of the assessment at the top of the page. Alternatively, you may place this
information in the document header.
Add your name and student number to the header or footer on every page.
On completion, submit your assessment to your assessor.
This assessment requires you to establish a risk context, identify risks, analyse risks and select
and implement treatments for the Kingfisher Garden Centre. The whole project is broken down
into four stages mirroring the process used when planning, implementing and monitoring a risk
management plan. This assessment is based on the organisation Kingfisher Garden Centre.
Information about the business is available at the end of this Student Assessment.
If there is insufficient information about Kingfisher organisational or operational details to allow
you to complete an assessment task to the depth of detail you wish, you may make
assumptions about Kingfisher’s operations.
However, you must discuss this with your assessor and gain approval prior to commencing the
relevant assessment task. Any assumptions about organisational policies or procedures or
operational processes which affect the responses to an assessment task must be listed at the
start of your assessment.
You work in the Kingfisher Garden Centre in customer service. In addition to all of the other risks that you have previously
identified, while completing a stocktake on the plants, you notice that many of the smaller plants and indoor plants are missing. You
go and check the storeroom and see there aren’t any there. You check the stock management system to see if they were disposed of
or written off due to damage or ill health and they haven’t!
It looks like you have a serious theft problem in the garden centre. The registers are located at the exits and it is up to the register
operators to check if customers have any extra items. You also currently have CCTV at the exits and the main areas of the garden
centre, but not within the indoor plant section. It is impossible for staff to steal the plants as they have their bags checked by a security
guard as they leave the store.
2. Flood from Move garden centre away from the dam (not possible) Low× high = 4
nearby dam Create diversion canals around the garden centre to minimise damage when a flood occurs 1×4=4
Install a back-up generator for trade centre, café, head office, gift shop Medium x medium=
4. Power outage
Ensure a backup generator is installed for IT services/servers 2×2=4
4
Version 3.2 11/2019
BSBRSK501 MANAGE RISK
Stakeholders/groups Communication
Risk treatment Timeline
requiring communication method
Fire in restaurant Restaurant staff Meeting for all restaurant Week 1
Whole team staff
Install sprinklers in restaurant kitchen and Email
the rest of the restaurant
Comply with fat fryer standards
Clean exhaust ducts regularly
Flood from nearby dam All staff A risk management team Week 2
Any suppliers that deliver, as this member will attend each
Create diversion canals around the garden may disrupt their ability to deliver. group’s team meeting and
centre to minimise damage when a flood Diversions may be in place while explain the flood treatment
occurs excavations occur. process
Follow up email
Information alert on internet
Serious workplace accident – forklift injures a All staff A risk management team Week 2
worker/customer Any delivery staff/contractors member will attend each
group’s team meeting and
Have forklift driver training, safety signage, explain the accident
use a spotter when forklift is in use and treatment process
speed limit. Follow up email
Information alert on internet
Email/phone call to
contractors
Task 4.4 Risk treatment monitoring template
Using the risk treatments that you completed in Task 4.2 Risk treatment action plan, explain how you will monitor if the treatments
implemented are successful. Complete the risk treatment monitoring template provided.
As part of the risk management process you have created a risk register that is easily
accessible on the intranet. This lists all the risks that have been treated and any new risks
identified and treated are added to the risk register.
You have implemented all the risk treatments that you identified in Task 4.1 and Task 4.2 and
you have asked all the team members and other stakeholders about how the risk treatments are
working.
This feedback was collected on the intranet and through team meetings. A list has been
compiled of all the feedback and new issues that were identified with the risk treatment and the
risk management process.
Gamma Education & Training Pty Ltd RTO Code: 41477 CRICOS PROVIDER CODE: 03580F V3.2112019
45
Risk treatment and risk management feedback
Risk treatment/
Risk management plan process Issue
1. Forklift driver safety procedures. Some forklift drivers are not adhering to the
8 km per hour speed limit.
2. Fire in the restaurant – installation of There have been two false alarms with the
the sprinkler system. sprinklers turning on for 30 seconds when
the chef was flambéing food.
3. ‘I wasn’t consulted about the forklift Not all appropriate stakeholders consulted.
driver changes and I am the
assistant trade centre manager’.
4. ‘I don’t think all the risks were All appropriate risks not included in scope.
included such as HR issues
regarding loss of experienced staff.’
5. ‘I don’t think changes to consumer All appropriate risks were not included in
preferences such as customers’ the plan and not all team members feel as
movement to drought-tolerant plants if they were consulted.
were included in the risk
management plan. No one asked us
about that.’ – Garden centre
customer service member.
6. Inadequate funding to complete the Anti-flooding canals have not been
flood canals around the garden completed.
centre as there was a budget blow
out due to gas piping around the
back section of the garden centre.
7. ‘I had some feedback regarding an Risk management team not always
issue with one of the risk treatments accessible to stakeholders.
for the risk management team. All
three were absent so I didn’t know
who to refer to for assistance.’
What mitigation actions would you take for each of the issues identified in the feedback of
the risk management process? Complete the issues and mitigation actions table.
Q1: Where and how would you store the risk management documents you have
completed for the Kingfisher Garden Centre? Who should have access to each
document? Complete the risk management review table.
Q2: How would you ensure the accuracy of the risk management documents? How
would you ensure that the documents saved are the most current? Who would
oversee this?
The accuracy can be ensured if it done by the correct individual and it is maintained time
to time on a daily or hourly basis.
The documents are the most current, which can be ensured by giving dates and
mentioning the time at which such risk was recorded.
The stakeholders and the higher officials of the organisation can oversee this
(Brustbauer, 2016)
• Ensure only risk management team staff can make changes to master copies.
• Team members request changes through risk management team and they make the
changes to master documents.
Q3: List three ways you would evaluate the risk management process in the Kingfisher
Garden Centre, and why this is useful.
Include at least three ways you would evaluate the risk management plan and process.
In case of Kingfisher Garden Centre, the risks will be identified, analysed, and ranked based on their
intensity. Afterwards, they will be treated accordingly, monitored in order to review, and conclude.
The risk management plan and process will be evaluated by
• Designing risk breakdown plan
• Framing a contingency plan
• Examining and analysing the plan to mitigate risks (Olson and Wu, 2015)
• Ask for feedback from all team members and stakeholders via meetings, intranet and email.
• Review risks and effectiveness of treatments with risk management team, team members and
stakeholders.
• Check the risk register/risk treatment plan.
• Check if there have been changes to risk evaluation as a result of improvements in controls.
• Check the control breach logs and investigate issues and whether or not a mitigation action should
be introduced.
• Check the Kingfisher intranet to see if the risk register is being used.
Evaluation method Why is this useful?
ASSESSMENT 4 CHECKLIST
Student’s name:
Completed
Did the student provide a sufficient and successfully
Comments (If required)
clear answer that addresses the
suggested answer for the following? Yes No
Task 1
Task 2
Task 3
Task 4
Task 5
Task 6
Assessor signature
Madan Lepcha
Assessor name
ASSESSMENT 5 COVER SHEET
Student Declaration
To be filled out and submitted with assessment responses
I declare that this task is all my own work and I have not cheated or plagiarised the work or
colluded with any other student(s).
I understand that if I am found to have plagiarised, cheated or colluded, action will be taken
against me according to the process explained to me.
I have correctly referenced all resources and reference texts throughout these assessment
tasks.
Student name
Student ID number
Student signature
Assessor declaration
I hereby certify that this student has been assessed by me and that the assessment has
been carried out according to the required assessment procedures.
Madan Lepcha
Assessor name
Assessor signature
A copy of this page must be supplied to the office and kept in the student’s file with the evidence.
BSBRSK501 Manage Student Assessment Tasks
risk
Case study
John owns a juice bar, John’s Juices, with his wife Danielle (his business partner). He currently
has five team members and manages the shop himself. His wife takes care of ordering and the
finances.
He has two produce suppliers and because John and Danielle have been loyal customers, they
get a great deal. They also have one supplier for all other items and materials used in the shop
including cleaning materials, disposable cups, straws, napkins, etc., used in the store.
John and Danielle inherited the shopfront and own the premises, so do not have any money
owing on the business. The shop has street frontage on a popular street in a very trendy beach
area.
Due to heightened social awareness of healthy products, their business is booming and turned
a profit of $200,000 last year. They are also the only juice bar within a 15 km radius.
The juice bar has five juicers and a large industrial fridge for the fresh produce.
Fresh produce is delivered at 7 am each morning for that day’s juicing.
All other supplies (from the one supplier) are delivered weekly on a Friday ready for the busy
weekend trade.
There are three booths and tables and chairs in the store for customers to use.
The staff are all up to date with food safety training.
The staff use equipment such as knives, chopping boards and peelers to prepare fruit and
vegetables.
The store has fire extinguishers and appropriate fire equipment.
The store does not have sprinklers.
Gamma Education & Training Pty Ltd RTO Code: 41477 CRICOS PROVIDER CODE: 03580F V3.2 112019
51
The store is insured for property damage and store contents.
John and Danielle didn’t think the business would be as successful as it is so they are looking at
purchasing a new shopfront and opening a new store in a shopping centre. As they are small
business owners, they do not have many policies and procedures in place, so they have been
hard at work on creating these policies.
John has recently started a risk management plan for the store. He has just identified business
risks with all team members and his business partner but hasn’t finished analysing them.
Complete the remaining four sections of the table for John’s Juices business risk
identification template.
1. Level of risk – you will need to complete the Risk assessment template (in same
assessment document) to complete this section of the table
Locations of risks, harm or consequence
Worst-case scenario
Who was consulted?
BSBRSK501 Manage Student Assessment Tasks
risk
ASSESSMENT 5
Task 5.1 John’s Juices business risk identification template
Business risks identified Potential harm or Category of risk 1. Level of risk Locati Worst-case scenario Who would be
consequences Political on consulted?
Likelihood
Severity
Risk priority
Econom
ic Social
Legal
Technol
ogy
Procedu
re
Unable to have cups Suppliers stock Shops and all the market were Manager
Supplier for all
and other Medi closed
disposable items goes Supplier issue
consumables ready um
out of business for customers
High In Shop We have finish the whole stuff Staff
Unable to provide Property
Juicers break down which will be delivering the
juice for customers and
juices
equipment
Food spoils and they Low Equipment’s or
will be unable to feed In the area I will breakdown the whole staff
Industrial fridge breaks Property
customers – food will where shop is fridges and not able to
down and
need to be thrown out located provide the exact the taste
equipment
and replaced of juices with the customers
Gamma Education & Training Pty Ltd RTO Code: 41477 CRICOS PROVIDER CODE: 03580F V3.2 112019
53
BSBRSK501 Manage risk Student Assessment Tasks
Business risks identified Potential harm or Category of risk 1. Level of Location Worst-case Who would be
consequences Political risk scenario consulted?
Economic
Likelihood
Severity
Risk priority
Social Legal
Technology
Procedure
Customer is injured, Medi At the location where store Table or chair is not Customer
A customer is injured Worksafe um opened properly arranged
Work, health and
while sitting at a booth investigation ensues
safety and legal
or table in the store and possible legal
action
No one will be able to Medi While eating outside or at Due to weather, they Natural
manage the business, um home are not well
Something happens to
or complete the
John or Danielle and Staffing
financial activities like
they are unable to work
paying staff or
ordering stock
Shop and stock is Medi Due to natural and store All the shop were Natural
Storm surge from nearby damaged, is unusable um damaged stocked and damaged
Natural disaster
beach causes flooding and will need to be
repaired
The juice bar will lose Low While opening the new juice Effect the customers
A new juice bar opens customers as it near by the store Market
Market
up nearby currently has a
monopoly
Juice bar will be fined, High Where ever near store Due to customer Customer
Customer is injured,
have to pay legal
Worksafe investigation
expenses and Legal
ensues and possible
potentially go out of
legal action business
BSBRSK501 Manage Student Assessment Tasks
risk
Risk matrix
Medium Something
severity happens to John
2 or Danielle and
they are unable to
work
A new juice bar
opens up nearby
Staff member
severely injures
Low severity themselves while
1 preparing food
and using a knife
Industrial fridge
breaks down
Gamma Education & Training Pty Ltd RTO Code: 41477 CRICOS PROVIDER CODE: 03580F V3.2 112019
55
Medium Very high
Low likelihood High likelihood
likelihood likelihood
1 3
2 4
LIKELIHOOD
Gamma Education & Training Pty Ltd RTO Code: 41477 CRICOS PROVIDER CODE: 03580F V3.2 112019
BSBRSK501 Manage risk Student Assessment Tasks
Key technologies will not be available and there is no For this alternative, I&I considerations are show-stoppers with the respect
alternative to the ability of this alternative to achieve its stated objectives.
Key technologies will not be ready and mature and For this alternative, I&I considerations are not very well understood.
will have a severe impact on the alternative Many challenging concerns are not resolved and/or successfully
tested/demonstrated under representative or actual field conditions. As
such, I&I considerations are expected to have severe negative effects on
the ability of this alternative to achieve its stated objectives.
There are no technical or performance expectations Each risk identified should be given a ranking based on the likelihood of
identified that will have any impact on achieving the them occurring.
stated outcome objectives expected from the
alternative
Technical or performance limitations have been For this alternative, I&I considerations are somewhat-borderline
identified that will have a moderate impact on understood. Nearly all (including the most challenging concerns) have
achieving the stated outcome objectives expected been resolved and/or successfully tested/demonstrated under
from the alternative representative or actual field conditions. As such, I&I considerations are
expected to have modest negative effects on the ability of this alternative
to achieve its stated objectives.
Confidence in performance expectations Mitigating the highest calculated risks does not completely deter them
from occurring, but establishes a workarounds and contingencies to lessen
the overall impact to the project.
There are no technical or performance expectations Depending on the scale used to measure likelihood and impact, a formula
identified that will have any impact on achieving the can be put together to calculate the overall risk associated with a certain
stated outcome objectives expected from the event.
alternative
Gamma Education & Training Pty Ltd RTO Code: 41477 CRICOS PROVIDER CODE: 03580F V3.2 112019 57
BSBRSK501 Manage risk Student Assessment Tasks
Every self-employed person shall make a suitable and he risks to his own health and safety to which he is
sufficient assessment of exposed whilst he is at work; and
the risks to the health and safety of persons not in his
employment arising out of or in connection with the
conduct by him of his undertaking...
The WHS Act and Regulations persons who have a duty to ensure health and safety to
'manage risks' by eliminating health and safety risks so
far as is reasonably practicable, and if it is not reasonably
practicable to do so, to minimise those risks so far as is
reasonably practicable.
Gamma Education & Training Pty Ltd RTO Code: 41477 CRICOS PROVIDER CODE: 03580F V3.2 112019 59
ASSESSMENT 5 CHECKLIST
Student’s name:
Completed
Did the student provide a sufficient and successfully
Comments (If required)
clear answer that addresses the
suggested answer for the following? Yes No
Task 1
Task 2
Task 3
Task 4
Assessor signature
Madan Lepcha
Assessor name
PROJECT BACKGROUND INFORMATION
Kingfisher Garden Centre’s goal is to spread the joy of gardening by helping its customers to create
beautiful garden spaces, no matter the budget or space. It specialises in selling plants and garden tools,
and it also has a gift shop and a restaurant on-site, which caters for events in the beautiful landscaped
garden.
This includes the roles of National General Manager, National Manager of Operations, national marketing
managers, state marketing managers, national coordinators for customer service, the garden centre and food and
beverage, plus the state managers in New South Wales, Victoria and Queensland.
This includes store managers, assistant store managers, garden centre, trade centre managers, garden designers,
customer service attendants, Dig-it customer service, drivers and delivery team, IT supervisor, accounts and
purchasing staff.
This includes the gift shop manager and customer service attendants.
This includes restaurant manager, event coordinator, head chef, section chefs, cooks, kitchen hands and food and
beverage attendants.
Setting
There are four locations including head office and three garden centre locations.
3. Kenmore, Queensland
The garden centre is in an urban location. It is near Moggill Creek, which joins onto the Brisbane
River nearby. It is at the end of a busy road and is surrounded by parkland.
The gift shop and restaurant are in the same building next to the garden centre. The trades section is
at the front of the site near the driveway. The plants and storefront are next to the trades centre.
Company information
Make sure you are familiar with the following documents available on Kingfisher Garden Centre’s intranet:
www.didasko-online.com/kingfisher/about-us.php#overview.
Company overview
Company and store organisational charts
Current risk management procedures
As identified in the unit Manage risk the current risk management plan includes the following.
There is also a:
WHS policy
Standard operating procedure for biohazard spill clean-up.
There are no current documents for business risks within the organisation.
There is a contingency plan and a risk assessment template on the intranet but completed copies have not
been updated and stored appropriately. You can view these on the intranet at: www.didasko-
online.com/kingfisher/work-health-and-safety.php.
Internal stakeholders
All the internal staff of the Kingfisher Garden Centre include the following.
1. National General Manager
2. National Manager of Operations
3. National Manager of Finance & Legal
4. National Manager of Human Resources
5. National marketing managers
6. National Merchandising Manager
7. National Manager – Purchasing
8. Manager of IT
9. State purchasing managers – Victoria, New South Wales and Queensland
10. National sales managers
11. R&D special projects officer
12. National coordinator of garden centre
13. State marketing managers
14. Garden centre manager
15. Food and beverage manager
16. State managers – New South Wales, Victoria and Queensland
17. Store managers
18. Garden centre staff
19. Gift shop manager
20. Gift shop customer service staff
21. Garden designers
22. Trade centre staff
23. Drivers
24. Delivery team members
25. Gift and homeware administrative officers
26. National sales executives
27. Food and beverage administrative officers
28. Garden centre administrative officers
29. National contracts coordinator
30. Information technology supervisor
External stakeholders
1. Plant supplier
2. Seafood and Meat supplier
3. Alcoholic beverage supplier
4. Non-alcoholic beverage supplier
5. Fresh produce supplier
6. Delivery truck company – TMT
7. Accountants – ABS financial services
8. Printer for marketing material – ‘Roll out the barrel’
9. Website server management – ‘Too easy website design and hosting’
10. Online store payment merchant – ‘Safe online transactions’
11. Cash register and stock management system – ‘Ring it up’
12. Giftware supplier – ‘Dim sum’s imports’
13. Soil, rock, mulch and bark supplier – ‘From the Earth Supplies’
14. Cleaning contractors (store, restaurant and head office cleaners)
15. Cleaning products supplier (used in the restaurant, in store and trade centre)
16. Training company – ‘Let’s get certified’ (used for certification for staff, for example, fork lift licenses and
food handling)
Suppliers
1. Plant supplier – ‘Uprooted plant supplies’
2. Seafood supplier – ‘The seafood man’
3. Meat supplier – ‘Carcass it up’
4. Alcoholic beverage supplier – ‘San Remo alcoholic beverages’
5. Non-alcoholic beverage supplier – ‘Pops and fizzes beverages’
6. Fresh produce supplier – ‘From garden to you’
7. Supplier of pesticides and fertilisers – ‘Bug off garden products’
8. Supplier of hardware like tools and equipment – ‘Tool it up’
9. Supplier of other gardening products – pots, edging, garden hoses, irrigation, etc. – ‘Johnno’s gardening
supplies’
Documentation maintenance
Currently all policies and documentation required for all staff are saved in folders in various shared
drives. The induction program is easily accessible on SharePoint (internal intranet).
The risk assessment template is accessible on SharePoint.
The WHS policy is accessible on SharePoint.
The contingency plan template is accessible on SharePoint.
Operating environment
Social
There has been a real shift towards sustainable products and concern for using environmentally safe
products.
More water conserving and drought-tolerant plants are being sold.
More soils with a higher water capacity are being sold.
More interest in home vegetable gardens or vertical vegetable gardens for high density living.
Significant interest in native plants versus overseas plants.
Significant interest in healthy food and healthy eating.
Interest in sustainable gardening products.
Significant interest in buying Australian products.
Legal
Currently renegotiating business insurance with insurer as they have excluded floods to the current
insurance policy.
As a result of this the New South Wales site currently does not have public liability insurance.
Currently questioning an invoice from Earth Supplies as you think you have been overcharged.
New regulations on non-native plants.
Technological
Currently upgrading all computers and equipment in head office due to outdated equipment.
Newest operating system software to be updated.
Self-serve registers have been purchased and will need to be installed in-store.
Online store is being upgraded and expanded to meet demand.
Policy
Human resource policy has not been updated for seven years and does not include information about
information technology (IT) use incorporating emails and social media.
No mention of bullying and updated equal employment opportunity legislation.
Current work contracts are not in line with the National Employment Standards.
Staffing
Performance reviews currently in process but yearly pay rises will only be given to national and state
managers.
Five resignations in the restaurant in the past six months including chefs and food and beverage service
operators.
Political
The government currently in power is trying to limit the importing of goods from China. They are investing in
local manufacturers and local small business. They are also thinking about creating stricter regulations on
the environmental impact of non-native plants and would like only native plants to be sold and prohibit the
importing of seeds and plants from overseas for selling purposes. They are pro-environmental
sustainability.
Economic
The Kingfisher Garden Centre is in a period of growth. The centres in Victoria and New South Wales are
consistently performing well and have made a profit for the past three years. The Queensland centre has
been stagnant for the past three years and has not made a loss, but not a profit either. This has included
growth with the trade centre.
The three restaurants have tight margins but are making a profit on events and breaking even on the café.
The gift shop is making a profit as the goods are being sold at a significant mark-up. Here is the latest
monthly profit and loss statement:
Code Title
Student Name
Student ID
Commencement Date Completion Date
Marking Guide - The principles of assessment of fairness, flexibility, validity and reliability have been met and the learner has been
assessed as competent in the elements for this unit. S – Satisfactory NS – Not Satisfactory
VERSION 2.0
BSBRSK501
MANAGE
Gamma Education & Training RISKCode: 41477|CRICOS PROVIDER CODE: 03580F
Pty Ltd |RTO
Address: Level 2, 266 Brunswick Street, Fortitude Valley, QLD 4006 Phone: 07 30757099
Website: www.gammaeducationtraining.edu.au
VERSION 2.0
ASSESSMENT FEEDBACK SHEET / RESUBMISSION
Assessments have been discussed with the student and unsatisfactory elements addressed
Overall Result
Competent Not Competent
(After Resubmissions )
If a Not Competent, has been achieved then strategies to address the gaps in the performance should be identified and a
time for reassessment or other assistance organised.
Re-sit Date:
I have received feedback and been informed of the assessment result and the reason for the
decision I agree with the assessment result and any resulting actions
2
Gamma Education & Training Pty Ltd |RTO Code: 41477 |CRICOS PROVIDER CODE: 03580F
Address: Level 2, 266 Brunswick Street, Fortitude Valley, QLD 4006 Phone: 07 30757099
Website: www.gammaeducationtraining.edu.au