Professional Documents
Culture Documents
a. Introduction
i. Source of Funds
b. Bidding Documents
c. Preparation of Bids
i. Language of Bid
1. Technical Bid
a. Bid Security
b. Power of Attorney
f. Deviations
g. Demonstration Parameters
l. Milestone Schedule
2. Price Bid
a. Functional Guarantees
1
d. Installation services (Erection and Commissioning)
f. Recommended Spares
g. Unit Assemblies
v. Bid Currencies
d. Submission of Bids
f. Award of Contract
i. Award Criteria
ii. Employers Right to Accept any Bid and Reject any Bid
v. Performance Security
1 Completion of detailed
engineering
3 Commencement of Manufacturing
4 Commencement of Spares
5 Completion of Supplies
6 Completion of supply of
mandatory spares at site
8 Start of TG Erection
9 Commencement of supply of
piping
10 Commencement of erection of
piping
11 TG box up
13 Synchronisation
14 Completion of facilities
15 Fulfilment of Availability
Guarantees
b. List of Milestones
Milestones to be incorporated in the Master Network (L1 Schedule) to be submitted with the
bid:
The above milestones are to be indicated for each of the following systems
3
i. Steam Turbine
ii. Generator
v. Pumps
c. Functional Guarantees
i. Definitions
iii. Interpretation
iv. Notices
v. Governing Law
i. Scope of Facilities
c. Payment
i. Contract Price
iii. Securities
d. Intellectual Property
i. Copyright
e. Work Execution
i. Representatives
1. Project Manager
1. Contractor's Organisation
2. Program of Performance
3. Progress Report
4. Progress of Performance
5. Work Procedures
iii. Subcontracting
v. Procurement
3. Transportation
4. Customs Clearance
vi. Installation
2. Contractor's Equipment
5. Emergency Work
6. Site Clearance
1. Guarantee Test
2. Operational Acceptance
x. Availability Guarantees
v. Limitation of Liability
g. Risk Distribution
i. Transfer of Ownership
iv. Insurance
v. Unforeseen Conditions
iii. Suspension
iv. Termination
v. Assignment
a. Definitions
b. Interpretation
c. Settlement of Disputes
d. Scope of Facilities
f. Securities
g. Work Program
j. Defect Liability
l. Latent Defects
m. Functional Guarantees
i. Project Information
ii. Proven-ness
iii. General
1. Paints
4. Guarantee Tests
5. Spares
1. Steam Turbine
5. Erection Materials
6. Spares
7. Unit Assemblies
v. Pumps
1. Main Equipment
2. Make-up system
xvii. Spares
b. Technical Requirements
ii. Layout
iv. Pumps
xx. Instrumentation Cables, Control and Power Cables & Cable Tray
ii. Pumps
x. LT Power Cables
xviii. Instrumentation Cables, Control and Power Cables & Cable Tray
i. Environmental Conditions
9
i. Division of Site Responsibilities- Technical Field Advisor / Supervisor
f. Tender Drawing
i. Mandatory Spares
v. Training
10