1. LIFTING
Note
Maximum back pressure
on port T must not exceed
0.5 bar
(V2) to MCV
Rings down
(Open)
WORKING
☜ Hyundai Heavy Industries Europe Page 3
2. HOLDING
(V2) to MCV
Rings up
Ri
(Close)
WORKING
☜ Hyundai Heavy Industries Europe Page 4
3. LOWERING
(V2) to MCV
Spool pushed up
(OPEN !)
Rings up
(Close)
WORKING
☜ Hyundai Heavy Industries Europe Page 5
3. ANTI-SHOCK FUNCTION
Relief Valve
(V2) to MCV
Rings up
(Close)
WORKING
☜ Hyundai Heavy Industries Europe Page 6
MOUNTING ON 2 BOOM CYLINDERS
= EQ
QUALIZER HO
OSE
1] B
Boom S
Safety
f t VValve
l
Lift the boom till end of stroke : the pressure will raise till 330 bar
bar.
Now you have to adjust the valve until the difference between (A) and (B) is about
0.5 à 1 bar (maximum). A bigger difference stands for a greater delay.
So screw the adjust screw (on top of the valve, below the cap) in or out.
Note that screwing out speeds up the opening time.
For adjusting the second safety valve, mount pressure gauges on E LEFT VALVE &
E RIGHT VALVE (keep the E hose disconnected !) Lower the boom slowly and adjust this
valve
l so that
h theh pressure ddrop on the
h “ E” gauges occurs at the
h same moment.