The daily reports summarize the drafting progress of Eka on the Nex Data Office project. On September 8th, Eka revised drawings for the phase 2 works package and ceiling plans at 50% completion. By September 9th, Eka added lighting, socket, sprinkler, smoke detector, and audio drawings, bringing the project to 60% done. On the 10th, Eka finished door, partition, section, and elevation drawings, reaching 70% completion with a deadline of September 17th.
The daily reports summarize the drafting progress of Eka on the Nex Data Office project. On September 8th, Eka revised drawings for the phase 2 works package and ceiling plans at 50% completion. By September 9th, Eka added lighting, socket, sprinkler, smoke detector, and audio drawings, bringing the project to 60% done. On the 10th, Eka finished door, partition, section, and elevation drawings, reaching 70% completion with a deadline of September 17th.
The daily reports summarize the drafting progress of Eka on the Nex Data Office project. On September 8th, Eka revised drawings for the phase 2 works package and ceiling plans at 50% completion. By September 9th, Eka added lighting, socket, sprinkler, smoke detector, and audio drawings, bringing the project to 60% done. On the 10th, Eka finished door, partition, section, and elevation drawings, reaching 70% completion with a deadline of September 17th.
DRAFTER PROJECT LUAS AREA BOBOT START DEADLINE NOTE
Gambar Kerja Fase II Mrs. Fisianty 95% 8-Sep 8-Sep 1. Revisi Material List 2. Revisi gambar fixed furniture Gambar Asbuilt Drawing EKA 1. Gambar Ceiling Plan Nex Data Office 50% 7-Sep 17-Sep 2. Gambar Skirting Plan 3. Gambar Roller Blind 4. Gambar Lighting Plan
DAILY REPORT 09/09/2021
DRAFTER PROJECT LUAS AREA BOBOT START DEADLINE NOTE Gambar Asbuilt Drawing 1. Gambar Grouping Lighting Plan 2. Gambar Socket Outlet Plan EKA Nex Data Office 60% 7-Sep 17-Sep 3. Gambar Titik Sprinkler 4. Gambar Titik Smoke Detector 5. Gambar Titik Speaker/ Sound Audio 6. Gambar Diffuser Ac
DAILY REPORT 09/10/2021
DRAFTER PROJECT LUAS AREA BOBOT START DEADLINE NOTE Gambar Asbuilt Drawing 1. Gambar Door & Partition Detail EKA Nex Data Office 70% 7-Sep 17-Sep 2. Gambar Section 3. Gambar Elevation