Id Nombre de la Tarea Duración


S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13 S14 S15 S16 S17 S18 S19 S20 S21 S22
0 FINIS TERRAE días
1 1 NOTICE TO PROCEED (NTP) 0
2 2 PV PLANT 147 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
3 2.1 ENGINEERING PV 21 7 7 7
4 2.1.1 Project Engineering (ENEL) 7 7
5 2.1.2 Topographic survey (ENEL) 7 7
6 2.1.3 Engineering studies (ENEL) 7 7
7 2.1.4 Main equipment details (ENEL) 0
8 2.1.5 Civil Detailed Engineering (ENEL) 7 7
9 2.1.6 Electrical Detailed engineering (ENEL) 7 7
10 2.1.7 Other Systems (CCTV, SCADA, etc) (ENEL) 0
11 2.1.8 HSE and Quality Plan 7 7
12 2.1.9 Permitting, accreditation company and people (ENEL/GLOBAL ICE) 28 7 7 7 7
13 2.2 PROCUREMENT / LOGISTICS 7 7
14 2.2.1 Main Equipment (ENEL) 7 7
15 2.2.1.1 Modules (ENEL) 7 7
16 2.2.1.2 String box (ENEL) 7 7
17 2.2.1.3 Tracker (ENEL) 7 7
18 2.2.2 Others - Cables and hincas 7 7
19 2.3 CONSTRUCTION PV PLANT 126 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
20 2.3.1 Start of Construction 0
21 2.3.2 Civil Works 84 7 7 7 7 7 7 7 7 7 7 7 7
22 2.3.2.1 Siet Facilities 21 7 7 7
23 2.3.2.2 Earthworks 70 7 7 7 7 7 7 7 7 7 7
24 2.3.2.3 Drainage - N/A 0
25 2.3.2.4 Road construction - N/A 0
26 2.3.2.5 Perimeter Fence N/A 0
27 2.3.2.6 Cable trenches and Pits 56 7 7 7 7 7 7 7 7
28 2.3.3 Mechanical Works 91 7 7 7 7 7 7 7 7 7 7 7 7 7
29 2.3.3.1 Hincas installation 77 7 7 7 7 7 7 7 7 7 7 7
30 2.3.3.2 Trakers installation 77 7 7 7 7 7 7 7 7 7 7 7
31 2.3.3.3 Modules Assembly 70 7 7 7 7 7 7 7 7 7 7
32 2.3.4 Electrical Works 77 7 7 7 7 7 7 7 7 7 7 7
33 2.3.4.1 Inverters Installation 77 7 7 7 7 7 7 7 7 7 7 7
34 2.3.4.2 MV Circuits Conneting 77 7 7 7 7 7 7 7 7 7 7 7
35 2.3.4.3 FO Circuits 77 7 7 7 7 7 7 7 7 7 7 7
36 2.3.4.4 DC Circuits - Install LV/LVAux/Comm Underg 35 7 7 7 7 7
37 2.3.4.5 DC Circuits - Install String/LVAux/Comm Cables 35 7 7 7 7 7
38 2.3.4.6 DC Circuits - Install Connecting LV cables 28 7 7 7 7
39 2.3.4.7 DC Circuits - Connecting LVAux/Comm Underg 28 7 7 7 7
40 2.3.4.8 DC Circuits - Connecting String 21 7 7 7
41 2.3.4.9 DC Circuits - Connecting Modules 21 7 7 7
42 2.3.5 SCADA - N/A 0
43 2.3.6 SECURITY SYSTEM - N/A 0
44 2.3.7 COLD COMMISSIONING PV PLANT 56 7 7 7 7 7 7 7 7
45 2.3.7.1 Cold Commissionig LV/LVAux/Comm 42 7 7 7 7 7 7
46 2.3.7.2 Cold Commissionig by fields 35 7 7 7 7 7
47 2.3.8 MECHANICAL COMPLETION 0
48 2.3.9 SITE TIDYING AND FINISHING WORKS 0
49 3 ENERGIZATION 28 7 7 7 7
50 4 HOT COMMISSIONING 14 7 7
51 5 FINAL ACCEPTANCE 0
52 6 COD 0
S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13 S14 S15 S16 S17 S18 S19 S20 S21 S22 TOTAL HH
M.O. Directa 0 0 0 5 6 51 104 113 115 120 120 120 120 120 120 120 113.5 105.5 95.5 80.5 57 16,860 84%
M.O. Indirecta 4 4 4 5 6 7 19 19 19 19 19 19 19 20 20 20 20 20 20 20 17 3,200 16%
20,060

Este gráfico no está disponible en su versión de Excel. Este gráfico no está disponible en su versión de Excel.

Si edita esta forma o guarda el libro en un formato de archivo diferente, el Si edita esta forma o guarda el libro en un formato de archivo diferente, el gráfico
gráfico no se podrá utilizar. no se podrá utilizar.
Mes 0 Mes 1
Sem 1 Sem 2 Sem 3 Sem 4 Sem 5
Instalacion de Faena
Levantamiento Topografico
Pre Drilling
Hincado
Trackers
Paneles
Stream Box
Limpieza de Zanjas
MVT Zanja 1 (BT)
MVT Zanja 2 (MT)
Cable MPT
Cable Solar
Cable BT
Cable FO
Cable MT
Conexionado Trackers
Conexionado CU (BT)
Conexionado CU (MT)
Conexionado FO
Pruebas
Desmovilizacion
Mes 1 Mes 2 Mes 3 Mes 4
Sem 6 Sem 7 Sem 8 Sem 9 Sem 10 Sem 11 Sem 12 Sem 13 Sem 14 Sem 15 Sem 16 Sem 17 Sem 18
Mes 4 Mes 5
Sem 19 Sem 20 Sem 21 Sem 22 Sem 23 Sem 24
ORGANIGRAMA PROYECTO FINIS TERRAE EN SITIO

Administrador de Contrato

Jefe HSE

Encargado Prevencionista
Medio Ambiental de Riesgo

Jefe de Jefe de Jefe de


Terreno Administración Oficina Técnica

Operadores y Supervisor Encargado Encargado de


Supervisor Supervisor Programación Encargado de
Obra Civil MVT Topógrafo de Acreditaciones Encargado de Bodega
Conductores Montaje Eléctrico Calidad
y Control de Avance

Cuadrilla Cuadrilla Cuadrilla


Obra Civil MVT Montaje Eléctricos
HISTOGRAMA DE OCUPACION PERSONAL
MOD Y MOI

OCUPACION EN TURNO
PREPARACION Y MOVILIZACION CONSTRUCCION APOYO Y DESMOVILIZACION
MOI TURNO
MES 0 MES 1 MES 2 MES 3 MES 4 MES 5
Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4
ADMINISTRADOR DE CONTRATO 5X2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
JEFE DE TERRENO 5X2 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0
SUPERVISOR OOCC MVT 6X1 0 0 0 0 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
SUPERVISOR MECANICO 6X1 0 0 0 1 2 2 2 2 2 2 2 2 2 2 2 0 0 0 0 0 0 0 0 0
SUPERVISOR ELECTRICO 6X1 0 0 0 0 0 0 0 1 2 2 2 2 2 2 2 2 1 1 1 1 0 0 0 0
TOPOGRAFO 6X1 0 0 0 1 2 2 2 2 2 2 2 2 0 0 0 0 0 0 0 0 0 0 0 0
JEFE DE OFICINA TECNICA 5X2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
PROGRAMADOR 5X2 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0
ENCARGADO DE CALIDAD / OFTEC 6X1 0 0 0 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 0 0
ENCARGADO DE BODEGA 6X1 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0
JEFE DE ADMINISTRACION Y RRLL 5x2 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0
ENCARGADA RRLL / ACREDITACIONES 6X1 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0
PERSONAL DE SERVICIOS 6X1 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0
JEFE HSE 5X2 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
PREVENCIONISTAS 6X1 0 0 0 0 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 0 0 0 0
AMBIENTALISTA 6X1 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0
2 2 4 12 18 19 19 20 21 21 21 21 18 18 18 16 15 15 15 15 10 8 3 3

OCUPACION EN TURNO
MOD CONDUCTOR - OPERADOR TURNO MES 0 MES 1 MES 2 MES 3 MES 4 MES 5
Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4
OPERADOR HORQUILLA (MANITOU) 6X1 0 0 0 0 3 3 3 3 3 3 4 4 4 4 3 0 0 0 0 0 0 0 0 0
OPERADOR CAMION PLANO 6X1 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0
OPERADOR HICADORA 6X1 0 0 0 0 4 4 4 4 4 4 4 4 0 0 0 0 0 0 0 0 0 0 0 0
OPERADOR PERFORADORA 6X1 0 0 0 0 3 3 3 3 3 3 3 3 0 0 0 0 0 0 0 0 0 0 0 0
OPERADOR EXCAVADORA 6X1 0 0 0 0 0 2 2 2 2 2 2 2 2 0 0 0 0 0 0 0 0 0 0 0
OPERADOR ALJIBE 6X1 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0
OPERADOR RETROEXCAVADORA 6X1 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0
OPERADOR RETROEXCAVADORA 6X1 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0
OPERADOR CAMION TOLVA 6X1 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0
CONDUCTOR BUS 6X1 0 0 0 0 2 2 2 3 3 3 3 3 2 2 2 2 0 0 0 0 0 0 0 0
CHANCADOR 6X1 0 0 0 0 0 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0
CONDUCTOR SPLINTER 6X1 0 0 0 1 3 4 4 4 5 5 5 5 4 3 3 3 2 2 2 1 0 0 0 0
0 0 0 1 20 24 24 25 26 26 27 27 18 14 13 9 2 2 2 1 0 0 0 0

OCUPACION EN TURNO
MOD MAESTROS TURNO MES 0 MES 1 MES 2 MES 3 MES 4 MES 5
Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4
OOCC MVT 6X1 0 0 0 0 2 6 6 6 6 6 6 6 6 2 2 2 0 0 0 0 0 0 0 0
PERFORACIONES 6X1 0 0 0 0 3 3 3 3 3 3 3 3 0 0 0 0 0 0 0 0 0 0 0 0
MONTAJE HINCAS 6X1 0 0 0 8 42 42 42 42 42 42 42 42 0 0 0 0 0 0 0 0 0 0 0 0
MONTAJE TRACKERS 6X1 0 0 0 0 0 20 20 20 20 20 20 20 20 0 0 0 0 0 0 0 0 0 0 0
MONTAJE PANELES 6X1 0 0 0 0 0 0 0 20 20 20 20 20 20 20 20 0 0 0 0 0 0 0 0 0
ELECTRICOS TENDIDO BT MT FO 6X1 0 0 0 0 0 0 0 0 15 15 15 15 15 15 15 15 0 0 0 0 0 0 0 0
ELECTRICOS TENDIDO CABLE SOLAR 6X1 0 0 0 0 0 0 0 0 9 9 9 9 9 9 9 9 0 0 0 0 0 0 0 0
ELECTRICO MPT 6X1 0 0 0 0 0 0 0 0 7 7 7 7 7 7 7 7 0 0 0 0 0 0 0 0
ELECTRICO CONEXIONISTA BT 6X1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 6 6 6 0 0 0 0 0
ELECTRICO CONEXIONISTA CABLE SOLAR 6X1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 4 4 4 0 0 0 0 0
LOGISTICO MECANICO 6X1 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0
APOYO BODEGA 6X1 0 0 0 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 0 0
0 0 0 11 50 74 74 94 125 125 125 125 80 56 56 46 13 13 13 3 2 2 0 0

OCUPACION DE PERSONAL EN TURNO


MES 0 MES 1 MES 2 MES 3 MES 4 MES 5
Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4
TOTAL OCUPACION MOI Y MOD POR SEMANA 2 2 4 24 88 117 117 139 172 172 173 173 116 88 87 71 30 30 30 19 12 10 3 3
TOTAL OCUPACION MOI Y MOD ACUMULADA 2 4 8 32 120 237 354 493 665 837 1,010 1,183 1,299 1,387 1,474 1,545 1,575 1,605 1,635 1,654 1,666 1,676 1,679 1,682

HI STOGRAMA DE OCUPACI ON DE PERSONAL EN TURNO


200 1,800

180 1,600

160
1,400
140
1,200
120
TOTAL OCUPACION MOI Y MOD POR SEMANA 1,000
100
TOTAL OCUPACION MOI Y MOD ACUMULADA 800
80
600
60

40 400

20 200

0 0
Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4
MES 0 MES 1 MES 2 MES 3 MES 4 MES 5

HH EN TURNO
MES 0 MES 1 MES 2 MES 3 MES 4 MES 5
Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4
TOTAL HH SEMANAL MOI 20 20 40 120 180 190 190 200 210 210 210 210 180 180 180 160 150 150 150 150 100 80 30 30
TOTAL HH SEMANAL MOD (INCLUYE OPERADORES) 0 0 0 120 700 980 980 1,190 1,510 1,510 1,520 1,520 980 700 690 550 150 150 150 40 20 20 0 0
TOTAL HH SEMANALES 20 20 40 240 880 1,170 1,170 1,390 1,720 1,720 1,730 1,730 1,160 880 870 710 300 300 300 190 120 100 30 30
TOTAL HH ACUMULADAS 20 40 80 320 1,200 2,370 3,540 4,930 6,650 8,370 10,100 11,830 12,990 13,870 14,740 15,450 15,750 16,050 16,350 16,540 16,660 16,760 16,790 16,820

DETALLE DE HH PROYECTO
1600 18,000

1400 16,000

14,000
1200
HH MOI TOTALES : 3.340 hrs. 12,000
1000 HH MOD TOTALES : 13.160 hrs
HH TOTALES : 16.500 hrs TOTAL HH SEMANAL MOI 10,000
800 TOTAL HH SEMANAL MOD (INCLUYE OPERADORES)
TOTAL HH ACUMULADAS 8,000
600
6,000
400
4,000

200 2,000

0 0
Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4
MES 0 MES 1 MES 2 MES 3 MES 4 MES 5
HISTOGRAMA DE OCUPACION
EQUIPOS

PREPARACION Y MOVILIZACION CONSTRUCCION APOYO Y DESMOVILIZACION


MES 0 MES 1 MES 2 MES 3 MES 4 MES 5
EQUIPO Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4
HORQUILLA (MANITOU) 0 0 0 0 3 3 3 3 3 3 4 4 4 4 3 0 0 0 0 0 0 0 0 0
CAMION PLANO (9MTS) 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0
HICADORA 0 0 0 0 4 4 4 4 4 4 4 4 0 0 0 0 0 0 0 0 0 0 0 0
PERFORADORA 0 0 0 0 3 3 3 3 3 3 3 3 0 0 0 0 0 0 0 0 0 0 0 0
EXCAVADORA 0 0 0 0 0 2 2 2 2 2 2 2 2 0 0 0 0 0 0 0 0 0 0 0
CAMION ALJIBE 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0
RETROEXCAVADORA 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0
MINI CARGADOR 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0
BUS 0 0 0 0 2 2 2 3 3 3 3 3 2 2 2 2 0 0 0 0 0 0 0 0
SPLINTER 0 0 0 1 3 4 4 4 5 5 5 5 4 3 3 3 2 2 2 1 0 0 0 0
GENERADOR IIFF 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0
GENERADOR MOVIL 0 0 0 0 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 0 0 0 0
CAMIONETA 0 0 0 3 6 6 6 6 6 6 6 6 6 6 6 6 4 4 4 4 2 2 0 0
CAMION TOLVA 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0
CHANCADOR 0 0 0 0 0 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0
TOTAL EQUIPOS EN OBRA - - - 5 29 33 33 34 35 35 36 36 26 22 21 17 8 8 8 7 3 3 - -

HISTOGRAMA DE EQUIPOS

7 40
HORQUILLA (MANITOU)
CAMION PLANO (9MTS)
6 35
HICADORA
PERFORADORA
30
EXCAVADORA 5
CAMION ALJIBE 25
RETROEXCAVADORA 4
BUS 20
SPLINTER 3
GENERADOR IIFF 15
GENERADOR MOVIL
2
CAMIONETA 10
CHANCADOR
1 5
TOTAL EQUIPOS EN OBRA

0 -
Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4 Sem 1 Sem 2 Sem 3 Sem 4
MES 0 MES 1 MES 2 MES 3 MES 4 MES 5
Cable MT 2000 mt / día / fase

Cable BT 3000 mt / día / fase

Fibra Óptica 3000 mt / día

Cable Solar 1500 mt / día / persona


(sólo tendido, sin peinar ni amarrar)

Cable MPAT (uniones empernadas 600 mt / (1 Capataz + 6 Maestros)


Hincas (picas + cable)
Rendimiento mufas 4 - 6 por día

Personal MT, BT y FO Equipos


1 Capataz tendido eléctrico 1 Manipulador telescopico 7 Ton (porta carrete)
11 Maestros tendido eléctricos 4 Porta carretes (1 grande + 1 Manipulardor + 2 chicos)
6 Maestros conexionado eléctrico 2 Corta cable 60 mm2
1 Corta cable 220 mm2
1 Corta cable 500 mm2
6 Pela cables (Kit solar - Dartel)
2 Megger
2 Tester 1500 Ohm
Taladro
Perillero
4 Cajas de herramientas menores para conexionista

Personal MPAT
1 Capataz MPAT
6 Maestros tendido y conexionado MPAT

Cable Solar
1 Capataz tendido eléctrico
8 Maestros tendido eléctricos
4 Maestros peinado y amarre cables
3 Maestros pasado de cables a String
4 Maestros conexionado eléctrico (Rendimiento = 4 cajas/día)
1 Cuadrilla para MT, BT y FO (10 a 12 personas) para tendido
Conexionistas 6

(15 personas: 8 tendido + 4 peinado y amarrado + 3 pasada de cables a String)


Conexionistas 4 (Rendimiento: 4 cajas/día)

Conexionistas 6

Responsable
Global
SELK
Global
Global
Global
Global
Global
Global
Global
Global
Global
PREDRILLING
Personal Equipos
3 Operadores perforadora 3 Perforadoras (2 producción + 1 recuperación)
3 Ayudantes perforadora

HINCADO
Personal Equipos
1 Supervisor de hincado 4 Hincadoras (3 producción + 1 recuperación)
4 Operadores hincadora 2 Manipulador telescopico 4,5 Ton (Acopio + Terreno)
2 Operadores manipuladores 1 Camión Rampa
1 Conductor camión rampa 1 Camioneta (Taller móvil)
4 Ayudantes hincadora
4 Capataz de cuadrilla hincado
32 Maestros hincado
2 Ayudantes de reparto hincas

TRACKER
Personal Equipos
1 Supervisor de Montaje Tracker 1 Manipulador telescopico 4,5 Ton (Tracker y Paneles)
2 Capataz de cuadrilla montaje
18 Maestros montajista
1 Operador manipulador

PANELES
Personal Equipos
2 Capataz de cuadrilla montaje
18 Maestros montajista
Materiales y herramientas

Materiales y herramientas Responsable


2 Nivel digital Hilti de 360° Global
6 Nivel de burbuja mágnetico (1 por hincadora) Global
4 Mira telescópica Global
Lienza de nylon (0,8 mm) Global
16 Pintura galvanizada Sherwin Williams (2 galones / campo) Global
16 Diluyente para pintura galvanizada Global
2 Esmeril angular 4 1/2" Global
2 Esmeril angular 7" Global
1 Taladro base magnetica Global
Grifas (hechizas) Global
10 Limas media caña Global

Materiales y herramientas Responsable


2 Centralita con 4 pistolas (2 pistolas boom - remache y 2 pistola de greep M12 - aprite)Selk 1Centralita (2 Pistolas c/u)
10 Puller (boquilla) para pistola greep (Compra directa en Nextracker) - FUNGIBLE Global
8 Pistolas de Impacto (4 cuadrante 3/4" y 4 cuadrante 1/2") Global
4 Llaves de torque (4,5 - 30 Nm) Global
4 Llaves de torque (20 - 121 Nm) Global
2 Llaves de torque (67 - 340 Nm) Global
6 Mazos de goma Global
3 Llaves Francesa 10" Global
4 Escalera de aluminio 5 peldaños Global
5 Flexometro 3m Global
Cuñas de madera 4"x4" largo 12" en corte 45° Global

Materiales y herramientas Responsable


6 Atriles para paneles (perfiñl acero 30x30 mm) Global
4 Pistolas remachadoras de paneles (Stanley PB2500N ó Huck) 1 Selk + 3 Global
lk 1Centralita (2 Pistolas c/u)

Selk + 3 Global
Cada 200 metros TERRRENO OFICINA
Estación de sombra cerrada (OSB) 2,5 x 3 mt 6 0
Estación emergencia (camilla plástica + extintor) 6 1
Estación ambiental (antiderrame + bloqueador) 6 1
Estación de hidratación 6 1
Baño químico 6 2
Lavado de mano 6 1

Prevención
Demarcación zanjas (Cinta de Peligro) 60 Conos 300MTS Cadena
Herramientas se deben pedir con Certificado