GENERAL OBSERVATIONS ON THE REPORTS & ANNEXURE (MDR 29)

Annexure- 8.1 Detailed Hydrology Report:-

1) Remove the hydraulics design reports of bridges at existing Km. 4+590, Km. 6+878, Km.
8+609, Km. 10+300, Km. 20+300, Km. 24+813, Km. 33+992, Km. 42+824, Km. 45+900, Km.
49+000 & Km. 50+200 proposed as widening/repairs & retained .

Design Report:-

2) The improvement proposals for bridges are missing in Section 4 of the Design Report.

Drainage Design Report:-

1) The hydraulics calculations for drainage are missing in the Annexure 7.1.

Engineering Report:-

1) Refer to section 2.2.1, the Annexure 3.3.1 of Volume –IA is mentioned in the report. Please
verify the Annexure numbers mentioned in the report.
2) Please refer to Table 2-16: Summary of no. of Structures, the numbers of bridges mentioned
in the Engineering Report are not matching with the numbers of existing bridges mentioned
in the Annexure 3.3.2 Inventory and Condition Survey of Structures.
3) Update the numbers of bridges mentioned in the Section 2.8.2.

Main Report:-

1) Refer to section 3.3.1, the Annexure 3.3.1 of Volume –IA is mentioned in the report. Please
verify the Annexure numbers mentioned in the report.
2) Please refer to Table 3-4: Summary of Existing Bridges and Other Structures, the numbers of
bridges mentioned in the table are not matching with the numbers of existing bridges
mentioned in the Annexure 3.3.2 Inventory and Condition Survey of Structures.