Professional Documents
Culture Documents
ITEMS AMOUNT
1). KICHEN WINDOW WALL PLASTER BREAKING AND HALL AREA WALL PLASTER
BREAKING AND DOOR SHIFTING AND HALL AREA WINDOW BREAKING AND MAKING
NEW SLIDDING WINDOW AND SEATING AREA INSIDE WINDOW AREA AND KICHEN
CELLING WORK BREAKING AND MAKING POLYMER PLASTER AND ALL KICHEN AND
HALL WINDOW AREA NEW PLASTER MAKING IN PROPER LINE LEVEL ...2. TOILET
BATH ROOM WORK BATH CELLING BREAKING AND WALL TILE BREAKING AND
FLOORING BREAKING AND SHIFTING BATH TO TOILET AND BATH AREA MAKING HALL
AREA AND WALL ALLSO EXPOSE NEAR MAIN DOOR AREA AND BATHROOM LOFT
AREA WATER PROOFING AND FIXING TILES AND CELLING PLASTER AND WATER
TANK REMOVE AND REFIT AGAIN AND TOILET FIXING ENGLISH TOILET AND AND 415000.0
8BY12 TILES FIXING INSIDE TOILET AND BATHROOM AND TOILET BATHROOM
FLOORING TILES FIXING ..WITH OUR LEBOUR AND MATERIAL.. 3). MAIN DOOR
REMOVING AND FIXING OUT SIDE AND REMOVE BRICK COLOUM AND MAKING NEW
DOORS AND FIXING SAFETY DOOR WITH OUR LEBOUR AND MATERIAL..4). KICHEN
AREA SINK FIXING AND KICHEN MAKING NEW PLATFORM AND CONNECTION FOR
SINK WATER SUPPLY WITH OUR LEBOUR AND MATERIAL.. 5). ROOM FLOORING 2BY 2
VERIFIED TILES WITH OUR LEBOUR AND MATERIAL ..6) ELECTRIC WORK CONCEAL
WITH OUR LABOURE AND MATERIAL ..7).INSIDE PAINTING WORK ROYAL PLASTIC
WITH ONE COAT PRIMER AND 2COAT ROYAL PLASTIC.