You are on page 1of 2

Sauna Installation Checklist

Page 1 of 2

Structure of Sauna Cabin


Procedure Comments

 Check benching for stability and security


 Check benching for cracks and splinters
 Check walls for exposed fixings
 Check door fitting and closing action

Sauna Cabin Fixtures and Fittings


Procedure Comments

 Check all specified equipment provided


 Check security of heater
 Check fixing of temperature control device
 Check lighting

Electricity Supply
Procedure Comments

 Check integrity of supply and earthing system


 Check all connections and terminals

Control Panel and Heater


Procedure Comments

 Check operation of control panel


 Check operation of heater
 Check sequential operation of heating elements

Commissioning Procedure
Procedure Comments

 Switch on and run up to 60°C for 1 hour


 Check operation of heater
 Increase temperature to 85°C, maintain for 1 hour
 Check operation of lighting
 Shut down and allow to cool
Revised 01.07.2011

Golden Coast Ltd | Fishleigh Road | Roundswell Commercial Park West | Barnstaple | Devon | EX31 3UA
Phone: +44 (0) 1271 378100 | Fax: +44 (0) 1271 371699 | Email: swimmer@goldenc.com | Web: www.goldenc.co
As a quality assured company we reserve the right to alter and improve the specification of products as deemed necessary. Registered in England and Wales 2420044 VAT Reg. No 540 4110 02
Sauna Installation Checklist
Page 2 of 2

Further Details

Completion Details
Signed by Engineer: Date:
Ensure that Requirements for installation form is correctly filled out and accompanies this form.
Revised 01.07.2011

Golden Coast Ltd | Fishleigh Road | Roundswell Commercial Park West | Barnstaple | Devon | EX31 3UA
Phone: +44 (0) 1271 378100 | Fax: +44 (0) 1271 371699 | Email: swimmer@goldenc.com | Web: www.goldenc.co
As a quality assured company we reserve the right to alter and improve the specification of products as deemed necessary. Registered in England and Wales 2420044 VAT Reg. No 540 4110 02

You might also like