You are on page 1of 1

6.

DEPARTMENTS AND SERVICES: -

Testing and Commissioning Department Testing and Balancing Department

Technical Commissioning for New Construction


Performance Test for all HVAC Equipment
Buildings

Process Commissioning for New Construction


Air Balancing Process
Buildings

Complete Performance Evaluation for MEP Water Balancing Process

Retro Commissioning for Extisting Buildings Vibration Measurements

Operation and Maintenance Manuals Ultrasonci Measurements

Pressure Duct Leakage Test

Electrical Tests Department Enviromental Measurements (Noise level, RH%


and Temp.)

Environmental Water Quality


Power Quality Analysis Test for power source

Live Test Validation and Clean Room


Department
Earthing Resistance Measurements
Installation Qualification (IQ)
Insulation Resistance Measurements
Operational Qualification (OQ)
Hi-Pot Test
Performance Qualification (PQ)
Lux Level Measurements

DGA (Dissolved Gas Analysis) test for Oil Thermal Mapping Study
transformers
PAT (Portable Appliance Test) to check safety Compressed Air Systems
for End User devices
Fluke Network test to check Structure Cabling Calibration
System
Environmental Study - Indoor Air Quality

Environmental Water Quality

7|Page

You might also like