Professional Documents
Culture Documents
S
Supplier
Production
R&D
Metallurgy
PREN
Process Start
Boundary
Mill Scheduling
Validation of the product produced in Dalmine Mill.
Testing of Failure Samples
I
Inputs
Sample material for specimen preparation.
Heat treatment and hot rolling schedules
Process Control List (LCP).
Lista Collaudo
Tandem tracking test
Test requests from R&D.
Metallurgy requests
Product engineering departments
Corrosion Tests requests from other Tenaris sites
Performance
Measutrments For Inputs
Identification of the Samples
Anti Mix Checks
Controls
Laboratory Quality Manual and Policy.
Applicable Procedures (PRD) lev. 2 and 3.
Receiving of the
samples
Mill.
P
Process
Product Release
Worck Distribution
Product Control
Product Control
Record Management
Product Release
Resources
O C
Outputs Customer
Test Results. Production
Technical and Quality records.
R&D
Metallurgy
PREN
Performance
Measutrments For Outputs
Backlog
Material released at the end of month.
Customer claims.
Safety index.
Costs.
Re tests due to wrong sample preparation and execution.
Forms.
Process End
Boundary
Issuing of Release in Tandem
the report