3
Television Administrative
System Office Network
And Guest Network
Telephone
Services
Software
Applications*
Security System*
-IPCCTV
Staff
Communications
WIFI/Radio*
Incoming
Building Lines Inter-
AV System* Management connections*
System*
4
*Co-ordinations from IT Side 4
5
Drawings and BOQ Materials
6
Guest rooms section Public area and BOH
7
Total cables by Floors and by Rack Total equipment to be used
8
9
IPTV Network
IPTV NETWORK
VLAN X UTP CAT6
Speaker
Gateway2 UTP CAT6 cable Background Music
+ Zone A
PROPERTY VLAN X BGM NETWORK AMP
Firewall INTERNET
BOH
SEPARATED
HOTEL ADMIN ALL Hotel Admin
NETWORK Servers
Branch Network
12
Scope of works Westin Cam Ranh Bay (where applicable under Tender/BOQ/Employment)
Installation or
Material
Line Task other Labor Coordination Remark
Supply
work
28 Vertical Multicore copper(Turn key cabling work ready for usage)
29 Muticore copper cables pull from IDF (Rack) to Computer room
30 Muticore copper cables marking and labeling
31 PE/EMT/Cable Tray/Wireway from IDF (Rack) to computer room
32 Telephone disconnected modules
33 Multicore copper cables termination and end to end continuity test
34 Wire Management for Multicore copper
35 AS Built Drawing
13
Property Networks Structure is made of
A. SM Fiber 9/125 and MM 50/125 Fiber (Min OM3)
B. 1Gig Capable UTP CAT6 Cables to all IP End points
C. Multicore copper cables (0.65 AP outdoor copper)
14
C COMPUTER ROOM
Hotel
Block 1
R T T R
Hotel
T
Block 2
R
Ball rooms T T
R R
T T
R R
R
R
R T
R
T T
R
C T
T T
T
R
Hotel T T T
Carpark
R T R
Villas zone
15
16
17
Installation or
Material
Line Task other Labor Coordination
Supply
work
58 Computer Room
59 Provision of a Fire Suppression System
60 magnetic type Access Control. Doorlock/Access Control
61 This can be the same Locking Aircond System
system as Guest room.
62 Lighting system
63 Wall/floor work
64 Painting
65 Electrical and power lines inside the computer room
66 Main Electric power lines from MDB to Computer room
67 Load Panel for IT equipment
68 All additional network cables and power outlets required in the computer room
69 Raised Floor Access
70 Wieway/Cable Tray/Baseket/EMT inside the Computer room
71 All Network equipment installed as per BOQ
72 All Racks and Power distributions for Computer room
73 Grouding system from building to Room
74 Terminal Ground bar in the Computer room
75 Rack Grounding System connected to Terminal Ground bar in the computer room
76 AS BUILT Drawing
18
Located at Block 2
Upper Ground
19
20
21
22
23
24
Installation or
Material
Task other Labor Coordination
Supply
work
IDF (Intermedial Distribution Frame/Rack)
PE/EMT/Cable Tray/Wireway from computer room to Floor IDF
AC Power for Floor IDF (Rack)
Rack and Rack Accessories
Rack Power Distribution Units
Rack Ventilation Fans
Network Equipment inside rack installation
AS BUILT Drawing
25
RACK SCHEDULE
Outdoor
Max Power Max
Dimensions Multicores
Line Location Floor Zone Rack Size Consumption Weight in Fiber Optic
WXDXH in mm Copper in
in Watts Kgs
Pairs
Guard House2@Hotel Entr.
1 Ground TC-GH2 TBD TBD TBD TBD 20 N/A
Block 1
1 Pool Ground IDF-P-12U 12U 600x600x600 1200 60 20 12 Cores MM 50/125
2 Outdoor Meeting Space Ground IDF-OD1-12U 12U 600x600x600 1200 60 20 12 Cores MM 50/125
3 Tennis Court Ground IDF-TC-12U 12U 600x600x600 1200 60 20 12 Cores MM 50/125
4
5 Upper Ground Cable to Lower Ground
Banquet Hall
6 Lower Ground IDF-BH-FLG-42U 42U 800x800x210 3200 650 60 12 Cores MM 50/125
7
8 Floor 3 IDF-H1-FL3-42U 42U 800x800x210 3200 650 60 12 Cores MM 50/125
9 Floor 2 Cable to Floor 1
10 Floor 1 IDF-H1-FL1-42U 42U 800x800x210 3200 650 60 12 Cores MM 50/125
11 Hotel Block 1 Mezz Cable to Upper Ground
12 Upper Ground IDF-H1-FLUG-42U 42U 800x800x210 3200 650 40 12 Cores MM 50/125
13 B IDF-H1B-FLG-42U 42U 800x800x210 3200 650 40 12 Cores MM 50/125
Lower Ground
14 A IDF-H1A-FLG-42U 42U 800x800x210 3200 650 80 12 Cores MM 50/125
15
16 Floor 1 Cable to Floor Lower Ground
17 Haven Block Upper Ground Cable to Floor Lower Ground
18 Lower Ground IDF-HH-FLG-42U 42U 800x800x210 3200 650 40 12 Cores MM 50/125
19
20 B Cable to Floor 2 Zone B
Floor 3
21 A Cable to Floor 2 Zone A
22 B IDF-H2B-FL2-42U 42U 800x800x210 3200 650 60 12 Cores MM 50/125
Floor 2
23 A IDF-H2A-FL2-42U 42U 800x800x210 3200 650 60 12 Cores MM 50/125
Hotel Block 2
24 B Cable to Floor 2 Zone B
& Floor 1
25 A Cable to Floor 2 Zone A
MEP Block
26 B IDF-H2B-FLUG-42U 42U 800x800x210 3200 650 60 12 Cores MM 50/125
Upper Ground
27 A COMPUTER ROOM
28 B IDF-H2B-FLG-42U 42U 800x800x210 3200 650 60 12 Cores MM 50/125
Lower Ground
29 A IDF-H2A-FLG-42U 42U 800x800x210 3200 650 100 12 Cores MM 50/125
30
31 Guard House1@Service Ent. Ground TC-GH2 TBD TBD TBD TBD 20 N/A
32
33 Service Station 1 Ground IDF-SS1-27U 27U 800X800X1400 2800 400 60 24 Cores SM
34 Service Station 2 Ground IDF-SS2-27U 27U 800X800X1400 2800 400 80 24 Cores SM
35 Service Station 3 Ground IDF-SS3-27U 27U 800X800X1400 2800 400 60 24 Cores SM
36 Service Station 4 Ground IDF-SS4-27U 27U 800X800X1400 2800 400 60 24 Cores SM
37
38 Beach Restaurant Ground IDF-BR-FLG-12U 12U 600X600X600 1200 60 40 12 Cores SM
39
26
RACK SCHEDULE
Outdoor
Max Power Max
Dimensions Multicores
Line Location Floor Zone Rack Size Consumption Weight in Fiber Optic
WXDXH in mm Copper in
in Watts Kgs
Pairs
39
40 VILLAS Ground IDF-GR-VS1 12U 600X600X600 1200 60 10 4 Cores SM
41 VILLAS Ground IDF-GR-VS1 12U 600X600X600 1200 60 10 4 Cores SM
42 VILLAS Ground IDF-GR-VS1 12U 600X600X600 1200 60 10 4 Cores SM
43 VILLAS Ground IDF-GR-VS1 12U 600X600X600 1200 60 10 4 Cores SM
44 VILLAS Ground IDF-GR-VS1 12U 600X600X600 1200 60 10 4 Cores SM
45 VILLAS Ground IDF-GR-VS1 12U 600X600X600 1200 60 10 4 Cores SM
46 VILLAS Ground IDF-GR-VS2 12U 600X600X600 1200 60 10 4 Cores SM
47 VILLAS Ground IDF-GR-PS01 12U 600X600X600 1200 60 10 4 Cores SM
48 VILLAS Ground IDF-GR-VS1 12U 600X600X600 1200 60 10 4 Cores SM
49 VILLAS Ground IDF-GR-VS1 12U 600X600X600 1200 60 10 4 Cores SM
50 VILLAS Ground IDF-GR-VS1 12U 600X600X600 1200 60 10 4 Cores SM
51 VILLAS Ground IDF-GR-VS1 12U 600X600X600 1200 60 10 4 Cores SM
52 VILLAS Ground IDF-GR-VS3 12U 600X600X600 1200 60 10 4 Cores SM
53 VILLAS Ground IDF-GR-VS3 12U 600X600X600 1200 60 10 4 Cores SM
54 VILLAS Ground IDF-GR-VS2 12U 600X600X600 1200 60 10 4 Cores SM
55 VILLAS Ground IDF-GR-VS2 12U 600X600X600 1200 60 10 4 Cores SM
56 VILLAS Ground IDF-GR-VS2 12U 600X600X600 1200 60 10 4 Cores SM
57 VILLAS Ground IDF-GR-VS2 12U 600X600X600 1200 60 10 4 Cores SM
58 VILLAS Ground IDF-GR-VS2 12U 600X600X600 1200 60 10 4 Cores SM
59
27
28
29
UTP CAT6
For Future RCU
UTP CAT6
For Wireless door
lock control
Telephone
30
2.4Ghz
5Ghz
31
32
2.4Ghz
5Ghz
33
34
Scope of works Westin Cam Ranh Bay (where applicable under Tender/BOQ/Employment)
Installation or
Material
Line Task other Labor Coordination Remark
Supply
work
44 Network Equipment inside rack installation More details, please see Tender Documents
45 Network Switching
46 UTP Patch cables
47 UTP Patch Cables marking
48 Fiber Patch Cables
49 Fiber Patch Cables marking
50 UPS Backup Connected the the power lines
51 VLAN Configurations By managed Service Provider if applicable
52 AS BUILT Drawing
53 Guest room and Pubilc Area WIFI More details, please see Tender Documents
54 WIFI AP installation
55 WIFI Signal Testing and Adjustment
56 WIFI Heatmap Survey for Final handover
57 AS BUILT Drawing and WIFI Signal report
35
Access Switches
1. CISCO/HP-Aruba*
2. 24/48 POE/Non POE
3. SFP Uplink 1G
4. Enterprise model
WIFI
1. CISCO/Ruckus/HP-Aruba*
2. AC Wave 2 2x2, 3x3, and 4x4 MIMO
3. N+1 Controller
4. -65dBm, -70dBm**
37
Connection
CAT5E or better
Travelling Cable
Max 90 Meters WIFI AP
Fiber Cable for the distance Installed on the Elevator
over 90 meters Top
IPCCTV
Installed in the Elevator
car
38
39
40
Elevator WIFI Backhaul for Guest Facing Technology
43
44
45
46
Scope of works Westin Cam Ranh Bay (where applicable under Tender/BOQ/Employment)
Installation or
Material
Line Task other Labor Coordination Remark
Supply
work
92 MATV/incoming TV Signal More details, please see Tender Documents
93 PE/EMT/Cable Tray/Wireway from Rack to Branch where needed by MATV
Cable connections between Receivers and IP
94 MATV Head end/Receiver Installation
Encoders
95 Subscription-Supply the TV Channels to IPTV Server
96 Testing and Commissioning
97 AS BUILT Drawing
98 IPTV Network
99 PE/EMT/Cable Tray/Wireway from Rack to Branch where needed by IPTV By managed Service Provider
100 IPTV Encoders/connections to server
101 AS BUILT Drawing
47
IP Capable TV
With Built-in Set top
box
MATV Receivers to IPTV encoders
Channel Receivers
Network
Switch
Encoders
AV Cables
distance 1.5
meters
IPTV Menu
IPTV Server
SERVERS
Incoming signal Channels are converted to Server Channels are out to TVs via
From Satellite The process of convert is called Encoding UTP CAT6
Or Antenna (changing the signal from analog to digital) Cables and Network
Switches 48
Flow of IPTV
Operation
15 U
SAT Dish
UTP Links Cable signal by
others
TV Signal Cables
SET TOP 15 U
BOX
1U Fiber patch
Cable linked
IPTV Server Between IPTV Server
and Channel boxes
49
SCOPE OF WORK IPTV
FITNESS
BATHROOM TV
CAT 6
UTP Patch Cable
STB Network
Configuration UTP CAT6 by IT Contractor
STB Mounting
EMT/Wireway/under Ground PE by MEP
Power Cable
HDMI/VGA/RF
Signal Cables
CAT 6
UTP Patch Cable
Power Cable
TV Network
Configuration
and Channel setup
TV Mounting
Fiber Optic Cable Pull by IT Contractor
SAT Dish
UTP Links
Cable signal by
MEP
1U Fiber patch
HDMI/VGA/RF
Signal Cables
TV Network
Configuration Power Cable Computer room Rack work Power Cable
and Channel setup By IT Contractor IPTV Encoder CH 1
IPTV CORE SW
AC Power see computer room
STB Network configuration Drawing CH 1
Hardware Mounting CAT 6
and connecting to TV and WALL CAT6 UTP Patch Cable Power Cable CH 2
Computer room IPTV Encoder CH 2
Power Cable CH 3
Rack
HDMI/VGA/RF
Signal Cables
(OPTIONAL CONTROL CABLE)
FREE TV CHANNELS
Power Cable LAND LINE
IPTV Encoder CH 3
CH 4 Combiner
IP TV Server/Media Server
CH 5
Power Cable
CH 6
IPTV Encoder CH 4
HBO
CNN
FOX
Power Cable
IPTV Encoder CNN ABC
CAT 6
UTP Patch Cable
Power Cable
Power Cable CABLE Channels
IPTV SYSTEM IPTV Encoder ABC By Owner
ABC
50
Internet Gateway (Managed Services Providers)
1. Intertouch
2. Guestek
3. Reivernet
51
Tenderers are recommended to go thru “IT System
Tender for WCR Feb 25 2019.pdf” in details for
1. Materials Delivery
2. RFA/RFI
3. Performance specifications
4. Installation and implementation
5. Work characteristics
6. Warranty and supports
*IT Project Contracting work requires highly coordination and repeated site accesses even for a
single course of work to be done. Tenderers, please ensure that all fees/charges have been
proposed to cover such coordination and intensive labor work.
52
53
Standard WIFI Heatmap Survey
Requirements
1. Latest Air Magnet Survey Pro application shall be used for Heatmap survey/planning
2. The USB WIFI must capable to perform SNR reading (Proxim Orinoco 8494)
3. The USB WIFI must capable to perform both WIFI Signal reading (2.4Ghz and 5Ghz)
4. The SNR shall be set at 25
5. The WIFI Signal shall be configured at -65dbm
6. The WIFI AP shall be configured at its full transmitting power
7. The WIFI AP shall be installed as per designed
8. Mapping the WIFI to the floor plan is the must
9. WIFI Signal coverage shall show
a. AP Placement
b. AP Details showing the wireless channel, Power level, and Maximum signal transmitted
c. Overall Signal coverage differentiated by colors
d. Signal coverage by SSID if there are more than one SSIDs
e. Signal coverage by AP if there are more than one Aps
10. SNR Report shall show
a. SNR By AP
b. SNR by SSID
c. SNR by Frequencies (2.4Ghz and 5.x Ghz)
d. When doing the report, SNR Level shall be set to value 75
54
55
56
57
58
59
60
61