Network Design and Consulting Co.

Ltd
Thaveewat Vasavakul
November 8 2019

1
1. Property Infrastructure explanations
2. Items required for tenders
3. Performance specs
4. Scope of work
5. Warranty and supports

2
3
Television Administrative
System Office Network
And Guest Network
Telephone
Services

Software
Applications*

Guest Room Computer


Management* room

Security System*
-IPCCTV

Staff
Communications
WIFI/Radio*

Incoming
Building Lines Inter-
AV System* Management connections*
System*
4
*Co-ordinations from IT Side 4
5
Drawings and BOQ Materials

6
Guest rooms section Public area and BOH

7
Total cables by Floors and by Rack Total equipment to be used

8
9
IPTV Network
IPTV NETWORK
VLAN X UTP CAT6

Fiber to Branch Rack


Gateway1
+
Firewall
IPTV
Servers
UTP CAT6
WIFI for Guests
VLAN X Back of House Staff communications
Fiber to Branch Rack PROPERTY INTERNET Any IP Services over WIFI Signal
NETWORK
Traffic Log
IPTV

Speaker
Gateway2 UTP CAT6 cable Background Music
+ Zone A
PROPERTY VLAN X BGM NETWORK AMP
Firewall INTERNET

BOH

SEPARATED
HOTEL ADMIN ALL Hotel Admin
NETWORK Servers

VPN Fiber to Branch Rack


Router for
Corporate
link

Hotel Admin Network

Branch Network

NETWORK DESIGN AND CONSULTING CO., LTD


REV DWG NO DESCRIPTION

- HOTEL NETWORK CONNECTIONS


10
MARCH 9 2018 THAVEEWAT
11
Scope of works Westin Cam Ranh Bay (where applicable under Tender/BOQ/Employment)
Installation or
Material
Line Task other Labor Coordination Remark
Supply
work
1 Fiber Cabling Infrastructure/Backbone (Turn key cabling work ready for usage) More details, please see Tender Documents
2 Fiber Cables pull from computer room to Floor IDF (Rack)
3 Fiber Cables marking/Labeling (On the cables)
4 UnderGround PE/EMT/Cable Tray/Wireway
5 Fiber Terminations/splicing
6 Fiber Test report
7 Fiber Tray
8 Fiber splicing box (if splicing method used)
9 Fiber Tray Labeling/port labeling
10 Wire Management for Fiber
11 Fiber Tray Labeling
12 AS BUILT Drawing
13 Horizontal Cabling Infrastucture (Turn key cabling work ready for usage) More details, please see Tender Documents
14 UTP CAT6 Cables pull from outlet locations to Floor IDF (Rack)
15 UTP Cables marking/Labeling (on the Cables)
16 PE/EMT/Cable Tray/Wireway from Rack to Branch (Main route)
17 EMT from Main Route to wall/outlets
18 EMT connection between Guest room and Wireway/EMT at Corridor
19 UTP CAT6 Terminations
20 UTP Test report
21 UTP Patch Panel
22 Wire Management for UTP
23 UTP Patch Panel Labeling
24 UTP RJ 45 Face Plate - Outlet side
25 UTP RJ 45 Plug - Outlet side
26 Face Plate labeling - Outlet side
27 AS BUILT Drawing

12
Scope of works Westin Cam Ranh Bay (where applicable under Tender/BOQ/Employment)
Installation or
Material
Line Task other Labor Coordination Remark
Supply
work
28 Vertical Multicore copper(Turn key cabling work ready for usage)
29 Muticore copper cables pull from IDF (Rack) to Computer room
30 Muticore copper cables marking and labeling
31 PE/EMT/Cable Tray/Wireway from IDF (Rack) to computer room
32 Telephone disconnected modules
33 Multicore copper cables termination and end to end continuity test
34 Wire Management for Multicore copper
35 AS Built Drawing

13
Property Networks Structure is made of
A. SM Fiber 9/125 and MM 50/125 Fiber (Min OM3)
B. 1Gig Capable UTP CAT6 Cables to all IP End points
C. Multicore copper cables (0.65 AP outdoor copper)

Property Networks Structure will serve


1. Hotel Admin Networks (BOH PCs/PMS/POS)
2. Guest Services Networks (IPTV/Wired-Wireless Internet)

14
C COMPUTER ROOM

R IDF (ZONE RACK)


T TC (VILLAS TELCOM CLOSET)

Hotel
Block 1
R T T R
Hotel
T
Block 2
R
Ball rooms T T
R R

T T

R R
R
R
R T
R
T T
R
C T
T T
T
R
Hotel T T T
Carpark
R T R

Villas zone

15
16
17
Installation or
Material
Line Task other Labor Coordination
Supply
work
58 Computer Room
59 Provision of a Fire Suppression System
60 magnetic type Access Control. Doorlock/Access Control
61 This can be the same Locking Aircond System
system as Guest room.
62 Lighting system
63 Wall/floor work
64 Painting
65 Electrical and power lines inside the computer room
66 Main Electric power lines from MDB to Computer room
67 Load Panel for IT equipment
68 All additional network cables and power outlets required in the computer room
69 Raised Floor Access
70 Wieway/Cable Tray/Baseket/EMT inside the Computer room
71 All Network equipment installed as per BOQ
72 All Racks and Power distributions for Computer room
73 Grouding system from building to Room
74 Terminal Ground bar in the Computer room
75 Rack Grounding System connected to Terminal Ground bar in the computer room
76 AS BUILT Drawing
18
Located at Block 2
Upper Ground

19
20
21
22
23
24
Installation or
Material
Task other Labor Coordination
Supply
work
IDF (Intermedial Distribution Frame/Rack)
PE/EMT/Cable Tray/Wireway from computer room to Floor IDF
AC Power for Floor IDF (Rack)
Rack and Rack Accessories
Rack Power Distribution Units
Rack Ventilation Fans
Network Equipment inside rack installation
AS BUILT Drawing

25
RACK SCHEDULE
Outdoor
Max Power Max
Dimensions Multicores
Line Location Floor Zone Rack Size Consumption Weight in Fiber Optic
WXDXH in mm Copper in
in Watts Kgs
Pairs
Guard House2@Hotel Entr.
1 Ground TC-GH2 TBD TBD TBD TBD 20 N/A
Block 1
1 Pool Ground IDF-P-12U 12U 600x600x600 1200 60 20 12 Cores MM 50/125
2 Outdoor Meeting Space Ground IDF-OD1-12U 12U 600x600x600 1200 60 20 12 Cores MM 50/125
3 Tennis Court Ground IDF-TC-12U 12U 600x600x600 1200 60 20 12 Cores MM 50/125
4
5 Upper Ground Cable to Lower Ground
Banquet Hall
6 Lower Ground IDF-BH-FLG-42U 42U 800x800x210 3200 650 60 12 Cores MM 50/125
7
8 Floor 3 IDF-H1-FL3-42U 42U 800x800x210 3200 650 60 12 Cores MM 50/125
9 Floor 2 Cable to Floor 1
10 Floor 1 IDF-H1-FL1-42U 42U 800x800x210 3200 650 60 12 Cores MM 50/125
11 Hotel Block 1 Mezz Cable to Upper Ground
12 Upper Ground IDF-H1-FLUG-42U 42U 800x800x210 3200 650 40 12 Cores MM 50/125
13 B IDF-H1B-FLG-42U 42U 800x800x210 3200 650 40 12 Cores MM 50/125
Lower Ground
14 A IDF-H1A-FLG-42U 42U 800x800x210 3200 650 80 12 Cores MM 50/125
15
16 Floor 1 Cable to Floor Lower Ground
17 Haven Block Upper Ground Cable to Floor Lower Ground
18 Lower Ground IDF-HH-FLG-42U 42U 800x800x210 3200 650 40 12 Cores MM 50/125
19
20 B Cable to Floor 2 Zone B
Floor 3
21 A Cable to Floor 2 Zone A
22 B IDF-H2B-FL2-42U 42U 800x800x210 3200 650 60 12 Cores MM 50/125
Floor 2
23 A IDF-H2A-FL2-42U 42U 800x800x210 3200 650 60 12 Cores MM 50/125
Hotel Block 2
24 B Cable to Floor 2 Zone B
& Floor 1
25 A Cable to Floor 2 Zone A
MEP Block
26 B IDF-H2B-FLUG-42U 42U 800x800x210 3200 650 60 12 Cores MM 50/125
Upper Ground
27 A COMPUTER ROOM
28 B IDF-H2B-FLG-42U 42U 800x800x210 3200 650 60 12 Cores MM 50/125
Lower Ground
29 A IDF-H2A-FLG-42U 42U 800x800x210 3200 650 100 12 Cores MM 50/125
30
31 Guard House1@Service Ent. Ground TC-GH2 TBD TBD TBD TBD 20 N/A
32
33 Service Station 1 Ground IDF-SS1-27U 27U 800X800X1400 2800 400 60 24 Cores SM
34 Service Station 2 Ground IDF-SS2-27U 27U 800X800X1400 2800 400 80 24 Cores SM
35 Service Station 3 Ground IDF-SS3-27U 27U 800X800X1400 2800 400 60 24 Cores SM
36 Service Station 4 Ground IDF-SS4-27U 27U 800X800X1400 2800 400 60 24 Cores SM
37
38 Beach Restaurant Ground IDF-BR-FLG-12U 12U 600X600X600 1200 60 40 12 Cores SM
39
26
RACK SCHEDULE
Outdoor
Max Power Max
Dimensions Multicores
Line Location Floor Zone Rack Size Consumption Weight in Fiber Optic
WXDXH in mm Copper in
in Watts Kgs
Pairs
39
40 VILLAS Ground IDF-GR-VS1 12U 600X600X600 1200 60 10 4 Cores SM
41 VILLAS Ground IDF-GR-VS1 12U 600X600X600 1200 60 10 4 Cores SM
42 VILLAS Ground IDF-GR-VS1 12U 600X600X600 1200 60 10 4 Cores SM
43 VILLAS Ground IDF-GR-VS1 12U 600X600X600 1200 60 10 4 Cores SM
44 VILLAS Ground IDF-GR-VS1 12U 600X600X600 1200 60 10 4 Cores SM
45 VILLAS Ground IDF-GR-VS1 12U 600X600X600 1200 60 10 4 Cores SM
46 VILLAS Ground IDF-GR-VS2 12U 600X600X600 1200 60 10 4 Cores SM
47 VILLAS Ground IDF-GR-PS01 12U 600X600X600 1200 60 10 4 Cores SM
48 VILLAS Ground IDF-GR-VS1 12U 600X600X600 1200 60 10 4 Cores SM
49 VILLAS Ground IDF-GR-VS1 12U 600X600X600 1200 60 10 4 Cores SM
50 VILLAS Ground IDF-GR-VS1 12U 600X600X600 1200 60 10 4 Cores SM
51 VILLAS Ground IDF-GR-VS1 12U 600X600X600 1200 60 10 4 Cores SM
52 VILLAS Ground IDF-GR-VS3 12U 600X600X600 1200 60 10 4 Cores SM
53 VILLAS Ground IDF-GR-VS3 12U 600X600X600 1200 60 10 4 Cores SM
54 VILLAS Ground IDF-GR-VS2 12U 600X600X600 1200 60 10 4 Cores SM
55 VILLAS Ground IDF-GR-VS2 12U 600X600X600 1200 60 10 4 Cores SM
56 VILLAS Ground IDF-GR-VS2 12U 600X600X600 1200 60 10 4 Cores SM
57 VILLAS Ground IDF-GR-VS2 12U 600X600X600 1200 60 10 4 Cores SM
58 VILLAS Ground IDF-GR-VS2 12U 600X600X600 1200 60 10 4 Cores SM
59

27
28
29
UTP CAT6
For Future RCU

Wall Plate WIFI


Connected to TV

UTP CAT6
For Wireless door
lock control

Telephone

30
2.4Ghz

5Ghz

31
32
2.4Ghz

5Ghz

33
34
Scope of works Westin Cam Ranh Bay (where applicable under Tender/BOQ/Employment)
Installation or
Material
Line Task other Labor Coordination Remark
Supply
work
44 Network Equipment inside rack installation More details, please see Tender Documents
45 Network Switching
46 UTP Patch cables
47 UTP Patch Cables marking
48 Fiber Patch Cables
49 Fiber Patch Cables marking
50 UPS Backup Connected the the power lines
51 VLAN Configurations By managed Service Provider if applicable
52 AS BUILT Drawing
53 Guest room and Pubilc Area WIFI More details, please see Tender Documents
54 WIFI AP installation
55 WIFI Signal Testing and Adjustment
56 WIFI Heatmap Survey for Final handover
57 AS BUILT Drawing and WIFI Signal report

35
Access Switches
1. CISCO/HP-Aruba*
2. 24/48 POE/Non POE
3. SFP Uplink 1G
4. Enterprise model

WIFI
1. CISCO/Ruckus/HP-Aruba*
2. AC Wave 2 2x2, 3x3, and 4x4 MIMO
3. N+1 Controller
4. -65dBm, -70dBm**

*See Tender document Appendix C for more details


**See Tender document Chapter 23 for more details 36
WIFI SIGNAL
Signal coverage
-30 dBm Perfect Signal
• Guest room (by room type where applicable) -50 dBm Excellent Signal
• WIFI Signal at Balcony -60 dBm Good, reliable Signal
• WIFI Signal at Bathroom/Bathtub -67 dBm Minimum for Voice and None HD Streaming
• WIFI Signal/Wired at Desk -70 dBm web browsing and email
• WIFI Signal at Bed -80 dBm Unstable connections
• WIFI Signal at Living (for some specific type of room with living area) -90 dBm Lost connections

• Guest Public area


• WIFI Signal at Lobby
• WIFI Signal at Restaurants/Bar/Pool/Fitness/Recreational Areas/Garden/walkway
• WIFI Signal at Meeting room/Ballroom/Prefunctions WiFi
Controller 2
• WIFI Signal at Corridor
• WIFI Signal in the elevator WiFi
Controller 1 Core2 Computer
room

• BOH (Heart of the House)


• WIFI signal at BOH area
Floor B2 Floor B1 Floor LG Floor Floor1 Floor2 Floor3 Floor4 Floor5 Floor6 Floor7 Floor8 Floor9 Fl 10 Fl 11 Fl 12 Fl 13 Fl 14
LGM

***Signal Strength: -65dBm/-70dBm on both 2.4Ghz 5Ghz 1-4 Gig/sec on UTP

-65dBm/SNR-25 preferred all areas 1-4 Gig/sec on UTP


10 Gig/sec on Fiber
10 Gig/sec on Fiber
100 Gig/sec on Fiber
WIFI
AP

WIFI Router DISTRIBUTED


AP Firewall SWITCHING
Core2

37
Connection

Lift Control Room

CAT5E or better
Travelling Cable
Max 90 Meters WIFI AP
Fiber Cable for the distance Installed on the Elevator
over 90 meters Top

IPCCTV
Installed in the Elevator
car

38
39
40
Elevator WIFI Backhaul for Guest Facing Technology

UTP CAT6 TO SWITCH

Distance xxx meters


Over XX WIFI Frequencies
Laser Technology
Trunk Radio Technology
GSM mobile Technology
Microwave Technology
Infrared Technology
Min Speed 100Mbit
Max Speed 3Gig

*WIFI Backhaul shall be proposed as a


provision.
The final decision shall be made once
8 PORT POE the travelling cable type is known

Elevator WIFI Backhaul IPCCTV


SIGNAGE
Network Design and Consulting Co., Ltd WIFI
Thaveewat Lift Car
41
42
Installation or
Material
Line Task other Labor Coordination
Supply
work
77 PABX System
78 PABX System Main Unit
79 PABX Network Switch and connections
80 Analog/Digital Connections (cable cross connected)
81 MDF Termination at of PABX Extensions Side
82 MDF Termination at MDF Hotel Extensions Side
83 Call Configurations as and class of services as per operator requirements

84 Call Accounting System Server and Software instalaltion

85 Call Accounting System interface with PMS

86 Incoming line/co lines subscription


87 Incoming line/co lines/ installation
88 Handset configuration/button programming
89 Handset installation
90 Training
91 AS BUILT Drawing

Handsets for Guests and


BOH will not be included

43
44
45
46
Scope of works Westin Cam Ranh Bay (where applicable under Tender/BOQ/Employment)
Installation or
Material
Line Task other Labor Coordination Remark
Supply
work
92 MATV/incoming TV Signal More details, please see Tender Documents
93 PE/EMT/Cable Tray/Wireway from Rack to Branch where needed by MATV
Cable connections between Receivers and IP
94 MATV Head end/Receiver Installation
Encoders
95 Subscription-Supply the TV Channels to IPTV Server
96 Testing and Commissioning
97 AS BUILT Drawing
98 IPTV Network
99 PE/EMT/Cable Tray/Wireway from Rack to Branch where needed by IPTV By managed Service Provider
100 IPTV Encoders/connections to server
101 AS BUILT Drawing

47
IP Capable TV
With Built-in Set top
box
MATV Receivers to IPTV encoders

Channel Receivers

Network
Switch

Encoders
AV Cables
distance 1.5
meters

IPTV Menu
IPTV Server
SERVERS

Incoming signal Channels are converted to Server Channels are out to TVs via
From Satellite The process of convert is called Encoding UTP CAT6
Or Antenna (changing the signal from analog to digital) Cables and Network
Switches 48
Flow of IPTV
Operation

15 U

1U Fiber patch installation

2U UTP Patch panel Installation

SAT Dish
UTP Links Cable signal by
others

Fiber Optic Cable to Computer room


Floor Rack

TV Signal Cables

SET TOP 15 U
BOX

1U Fiber patch

Cable linked
IPTV Server Between IPTV Server
and Channel boxes

Computer room MATV Headend


Rack

49
SCOPE OF WORK IPTV

FITNESS
BATHROOM TV

CAT 6
UTP Patch Cable

STB Network
Configuration UTP CAT6 by IT Contractor
STB Mounting
EMT/Wireway/under Ground PE by MEP
Power Cable
HDMI/VGA/RF
Signal Cables

EMT/Wireway/under Ground PE by MEP


OPTIONAL CONTROL CABLE

CAT 6
UTP Patch Cable

UTP CAT6 by IT Contractor


Power Cable

Power Cable
TV Network
Configuration
and Channel setup

TV Mounting
Fiber Optic Cable Pull by IT Contractor

EMT/Wireway/under Ground PE by MEP

Floor Rack work 15 U


By IT Contractor
1U Fiber patch installation
AC Power by MEP

2U UTP Patch panel Installation

SAT Dish
UTP Links
Cable signal by
MEP

Fiber Optic Cable to Computer room


IPTV SERVER AND ENCODER RACKS WITH
Floor Rack by
IT Contractor POWER DISTRIBUTIONS TV Signal Cables
TV Mounting RG11 Cable
And Mounting Plate installation Fiber Cable
RG6 Cable
Or other type of Cables
LCD Mounting By MEP
Kit CAT 6
UTP Patch Cable

UTP CAT6 by IT Contractor

EMT/Wireway/under Ground PE by MEP 15 U

1U Fiber patch
HDMI/VGA/RF
Signal Cables
TV Network
Configuration Power Cable Computer room Rack work Power Cable
and Channel setup By IT Contractor IPTV Encoder CH 1
IPTV CORE SW
AC Power see computer room
STB Network configuration Drawing CH 1
Hardware Mounting CAT 6
and connecting to TV and WALL CAT6 UTP Patch Cable Power Cable CH 2
Computer room IPTV Encoder CH 2
Power Cable CH 3
Rack
HDMI/VGA/RF
Signal Cables
(OPTIONAL CONTROL CABLE)

FREE TV CHANNELS
Power Cable LAND LINE
IPTV Encoder CH 3
CH 4 Combiner
IP TV Server/Media Server
CH 5
Power Cable
CH 6
IPTV Encoder CH 4

MATV Headend Power Cable


By MEP
IP TV Server/Media Server CNN

HBO

CNN

Power Cable HBO


IP TV Server/Media Server
IPTV Encoder HBO

FOX

Power Cable
IPTV Encoder CNN ABC

CAT 6
UTP Patch Cable

Power Cable
Power Cable CABLE Channels
IPTV SYSTEM IPTV Encoder ABC By Owner

REV 4 INSTALLATION SCOPE OF WORK HDMI/VGA/RF Power Cable


Signal Cables IPTV Encoder FOX
NETWORK DESIGN AND CONSULTING CO., LTD
JAN 12 2017
FOX

ABC
50
Internet Gateway (Managed Services Providers)
1. Intertouch
2. Guestek
3. Reivernet

51
Tenderers are recommended to go thru “IT System
Tender for WCR Feb 25 2019.pdf” in details for
1. Materials Delivery
2. RFA/RFI
3. Performance specifications
4. Installation and implementation
5. Work characteristics
6. Warranty and supports

*IT Project Contracting work requires highly coordination and repeated site accesses even for a
single course of work to be done. Tenderers, please ensure that all fees/charges have been
proposed to cover such coordination and intensive labor work.
52
53
Standard WIFI Heatmap Survey
Requirements
1. Latest Air Magnet Survey Pro application shall be used for Heatmap survey/planning
2. The USB WIFI must capable to perform SNR reading (Proxim Orinoco 8494)
3. The USB WIFI must capable to perform both WIFI Signal reading (2.4Ghz and 5Ghz)
4. The SNR shall be set at 25
5. The WIFI Signal shall be configured at -65dbm
6. The WIFI AP shall be configured at its full transmitting power
7. The WIFI AP shall be installed as per designed
8. Mapping the WIFI to the floor plan is the must
9. WIFI Signal coverage shall show
a. AP Placement
b. AP Details showing the wireless channel, Power level, and Maximum signal transmitted
c. Overall Signal coverage differentiated by colors
d. Signal coverage by SSID if there are more than one SSIDs
e. Signal coverage by AP if there are more than one Aps
10. SNR Report shall show
a. SNR By AP
b. SNR by SSID
c. SNR by Frequencies (2.4Ghz and 5.x Ghz)
d. When doing the report, SNR Level shall be set to value 75
54
55
56
57
58
59
60
61