°Building Load Failure, though we cannot ruled out this hazard or say
that it is unlikely to happen but it is also a threat as the site is newly
expanded and working heavy equipments exist and working.
CHEMICAL HAZARDS
-Potential hazards from this factors only happen when there’s low level of
personal protective equipments specially during timely checking of equipment’s
condition. Does, well prepared and PPE is a must thing to do.
VENTIALTION HAZARDS
-While this is unlikely to happen, as any projects undergo massive evaluation
before granted. If possible threat appears so, PPE shall be used and must before
or while on instance of using equipments that creates fumes of harmful
substances.
Along with these procedures, there’s ISO standards for every project. PAES is a
bunch of standards also that includes safety, assessments and standard
materials being used to a project ensuring present safety and onwards.
4. Write a brief report outlining your risk assessment and control measures. The
report should be clear, concise, and include relevant details and information.
PPE should always be observed at all times as project goes onwards. Most
probable hazard or most likely to happen is falling debris; which can be limit by
wearing hard hats. Other than that, securing good communication and
connection interaction to all worker shall also be observe well.
Daily checking of heavy equipments and maintenance will help reduced the risk
of equipment failures and risk. For an instance of fire hazards, workers shall be
inform the right fire exit. First aid kit shall always be present and perform
immediate response to any sort of accidents when workers are expose to cuts
and or falling objects. On chemical hazards, it important to separate high
combustible material from fire or any sort of equipment that can start a fire.
As per control measures and implementations; monthly of periodic checks shall
be done as project goes onwards while evaluation of new risk shall also be
assessed by the project inspector or site inspector. Documentation and proper
reviews of the project onwards shall be noted and inspection of control measures
shall assess by in every inspection. Moreover, any accidents and or risk shall
also be reported the site inspector to do proper and new control measures.
By such, project working ethics shall also be observed at all time. Periodically
visit is recommended to identify any risk that aren’t controlled yet and policies
shall be implemented if risk control measures aren’t observed or followed.