Pile design Type 3A = 22m

(BH8-47) Unclear Unclear


Pile design Type 3B = 16m Unclear Pile design Type 3C = 25m
transition transition
(BH8-26) transition (BH8-49)
Proposed
additional BH
BH8-26: 16m
BH8-47: 22m
P5: 12.5m BH8-48: 12m
P3: 15.8m
Proposed
BH6-40: 16m additional BH
P4: 14.2m

P1: 13.5m
P2: 11m

Pile length according to the design


Pile Length According to N = 50 at that borehole
Pile Length according to the trial
Pile design Type 3A = 22m
(BH8-47) Unclear Unclear
Pile design Type 3B = 16m
transition transition
(BH8-26)

BH6-40 required length 16m,


BH8-47: 22m So far P1,P2,P4 and P5 cannot reach
P5: 12.5m that depth

BH6-40: 16m Potential problem: At the unclear


transition zone, it is possible for the
P4: 14.2m pile to be under designed

P1: 13.5m
P2: 11m

Pile length according to the design


Pile Length According to N = 50 at that borehole
Pile Length according to the trial