You are on page 1of 3

COMPLETION REPORT

Service ID (Site Name) KFC DT)


Site Category KFCM
Installation Address: Kemaman
Region: Kemaman State: Terengganu
Installation Date: 21/12/2022 UAT Date: 21/12/2022
Report Date: 23/12/2022

Acceptance:

Redtone Outlet Manager/AM/OM/Staff on QSR HQ


Telecommunications Duty
Company Stamp & Company Stamp & Signature: Company Stamp &
Signature: Signature:

Name: Name:

1
Table of Contents
1.0 On-Site UAT .................................................................................................................... 2
1.1: Hardware ..................................................................................................................... 3
1.2 Primary Link ................................................................................................................ 4
1.3: Failover Test ............................................................................................................... 4
1.4 Application Test (Secondary Link) .............................................................................. 5
1.5 : Voice .......................................................................................................................... 5
2.0 : Hardware Setup on Site ................................................................................................. 5
2.1: Backhaul (Unifi Modem / 4G Router) ........................................................................ 6
2.2: Peplink Router ............................................................................................................ 6
2.3: Network Switch .......................................................................................................... 6
2.4: AP ............................................................................................................................... 6
2.5: ATA (Dual Sim Sites)................................................................................................. 6
2.6: Dect Phone .................................................................................................................. 6
3.0 Appendix .......................................................................................................................... 7
3.1: Speed test Results ....................................................................................................... 7
3.2: Connection Status (Ping Test) .................................................................................... 7
3.3: FTP Test (UL/DL) ...................................................................................................... 8
3.3: Failover Test Results .................................................................................................. 8
3.4: Application Tests (Screen Shot connected to SSID) .................................................. 8
3.41. BOH PC internet access ....................................................................................... 8
3.42. Outlook Email ...................................................................................................... 8
3.43. FMH Tablet (test login- Connect to Myteam SSID) ........................................... 8
3.44. FA Grab Tablet (to connect Grabfood SSID) ...................................................... 8
3.45. Kiosk up & online (for Kiosk store) .................................................................... 8
3.46. Others (Please State) ............................................................................................ 8

1.0 On-Site UAT


REFERENCE NOTE:
1. FTP Test: Direct connect device (UL/DL).

2
2. Speedtest; Direct connection via TM Modem. Guide: speed as per subscribed.
3. Link Stability: Packet Loss
4. Latency: 1-5
5. Label: According to device & cables.
6. Light status: Color
7. Port No: Which port is connected.
8. Status of other ports: Test all ports to ensure it is functional.
9. Connection status: Device status - up/down - ping test.
10. Speed Test: Direct connect Device
11. Light status: AP light color
12. SSID: What is visible
13. Status of AP - Up/Down - Ping Test
14. WIFI Status: Able to connect to wifi
15. Speed test: Direct connect AP.

1.1: Hardware

No Hardware Installation Details / Test Status


Serial Number: F53
Label/Tag: DONE
Light Status: GREEN
1 Peplink Router Port No: PORT WAN AND 1
Status of Other
GOOD
Ports:
Connection
UP
Status:
Serial Number: 32
Label/Tag: DONE
Light Status: GREEN
2 Network Switch Port No: PORT 1,3,7 AND 8
Status of Other
GOOD
Ports:
Connection
UP
Status:
No Hardware Installation Details / Test Status
Serial Number: 659
Label/Tag: DONE
Light Status: BLUE
3 AP 1
SSID: Myapp and KFCWifi
Status of AP: UP
WIFI Status : YES
Serial Number: 1C7
Label/Tag: DONE
Light Status: BLUE
4 AP 2
SSID: Myapp and KFCWifi
Status of AP: UP
WIFI Status : YES

You might also like