Professional Documents
Culture Documents
Test Report
L.V. Switchboard
(Factory / Site Test)
No.
1. General
a). All earthing completed
b). All screwed connection checked for adequate contact
c). Electrical and mechanical interlocks checked for correct function
d). HRC cartridge ratings correct
e). Functional check of all fuseswitches
f). Operation of all air circuit breakers, see separate test reports nos.
g). Remarks :
1) Check ability of battery pack to maintain 20 times of consecutive tripping of all the
breakers (ACB or MCCB) under fully charged: OK / Failure / NA
No.
3. Megger Test before Power Frequency Voltage Test
With all switching devices opened With all switching devices closed
L1 to L2 MΩ MΩ
L2 to L3 MΩ MΩ
L3 to L1 MΩ MΩ
L1 to E MΩ MΩ
L2 to E MΩ MΩ
L3 to E MΩ MΩ
L1 to N MΩ MΩ
L2 to N MΩ MΩ
L3 to N MΩ MΩ
N to E MΩ MΩ
Test Voltage: 1000V DC
4. Megger Test after Power Frequency Voltage Test (with all switching devices closed)
L1 to L2 MΩ
L2 to L3 MΩ
L3 to L1 MΩ
L1 to E MΩ
L2 to E MΩ
L3 to E MΩ
L1 to N MΩ
L2 to N MΩ
L3 to N MΩ
N to E MΩ
Test Voltage: 1000V DC
5. Other Tests
Signature : Witness :
Date : Witness :
Page 2 / 9
Rickson Engineering Limited 利信機電有限公司
Current Injection
Test Report
No.
L1 - L2 1600
L2 - L3 1600
L3 - L1 1600
Page 3 / 9
Rickson Engineering Limited 利信機電有限公司
Current Injection
Test Report
No.
L1 - L2 N.A. 1600
L2 - L3 N.A. 1600
L3 - L1 N.A. 1600
L1 - N N.A. 1600
L2 - N N.A. 1600
L3 - N N.A. 1600
L1 Phase
Operating Time (Second)
Plug Setting Time Setting Current Injected (A) Nominal Actual
L2 Phase
Operating Time (Second)
Plug Setting Time Setting Current Injected (A) Nominal Actual
Page 4 / 9
Rickson Engineering Limited 利信機電有限公司
Current Injection
Test Report
No.
L3 Phase
Operating Time (Second)
Plug Setting Time Setting Current Injected (A) Nominal Actual
f) Remarks :
Signature : Witness :
Date : Witness :
Page 5 / 9
Rickson Engineering Limited 利信機電有限公司
Current Injection
Test Report
No.
Model No.
Rating
2. Measuring Circuit
L1 - L2
L2 - L3
L3 - L1
d) Remarks :
Signature : Witness :
Date : Witness :
Page 6 / 9
Rickson Engineering Limited 利信機電有限公司
Current Injection
Test Report
No.
Model No.
Rating
2. Measuring Circuit
L1 - L2
L2 - L3
L3 - L1
3. Protection Circuit
c) Primary Injection
L1 - L2
L2 - L3
L3 - L1
L1 - N
L2 - N
L3 - N
Page 7 / 9
Rickson Engineering Limited 利信機電有限公司
Current Injection
Test Report
No.
e) Remarks :
Signature : Witness :
Date : Witness :
Drawing Ref :
Signature : Witness :
Date : Witness :
Page 9 / 9
Temperature Rise Test Record
Project Name:Replacement of Switchboard in North District Hospital
Test loop no. : 1 SWB ref. (NEW SW/BD "D" Drawing no. 800789-T01
Part of
Point No. Time ==> 8:30 9:00 9:30 10:00 10:30 11:00 11:30 12:00 12:30 13:00 13:30 14:00 14:30 15:00 15:30 16:00 16:30 Limit
Assemblies
Test Point 61 Ambient_1 ( ∘C) Ambient -
Witness:
Date: Witness: