Rickson Engineering Limited 利信機電有限公司

Test Report
L.V. Switchboard
(Factory / Site Test)
No.

Project : Replacement of Switchboard in North District Hospital


Client : Hang Kei Eng. Service
General Arrangement Drawin
Rated Operational Voltage : 380V
Rated Insulation Voltage : 660V
Rated Current of Main Busbar :
Rated Short Time Withstand Current : 50KA for 1 sec.
Degree of Protection : IP31

1. General
a). All earthing completed
b). All screwed connection checked for adequate contact
c). Electrical and mechanical interlocks checked for correct function
d). HRC cartridge ratings correct
e). Functional check of all fuseswitches
f). Operation of all air circuit breakers, see separate test reports nos.
g). Remarks :
1) Check ability of battery pack to maintain 20 times of consecutive tripping of all the
breakers (ACB or MCCB) under fully charged: OK / Failure / NA

2. Power Frequency Voltage Test with all switching devices closed


Test voltage 2500V ac
Duration 60 sec
Test voltage applied between
L1 and L2
L2 and L3
L3 and L1
N and E
L1 and L2 + L3 + N + E
L2 and L1 + L3 + N + E
L3 and L1 + L2 + N + E
Page 1 / 9
Rickson Engineering Limited 利信機電有限公司
Test Report
L.V. Switchboard

No.
3. Megger Test before Power Frequency Voltage Test

With all switching devices opened With all switching devices closed

L1 to L2 MΩ MΩ
L2 to L3 MΩ MΩ
L3 to L1 MΩ MΩ
L1 to E MΩ MΩ
L2 to E MΩ MΩ
L3 to E MΩ MΩ
L1 to N MΩ MΩ
L2 to N MΩ MΩ
L3 to N MΩ MΩ
N to E MΩ MΩ
Test Voltage: 1000V DC
4. Megger Test after Power Frequency Voltage Test (with all switching devices closed)
L1 to L2 MΩ
L2 to L3 MΩ
L3 to L1 MΩ
L1 to E MΩ
L2 to E MΩ
L3 to E MΩ
L1 to N MΩ
L2 to N MΩ
L3 to N MΩ
N to E MΩ
Test Voltage: 1000V DC
5. Other Tests

Prepared by : W.L.Keung Witness :

Signature : Witness :

Date : Witness :

Place : Factory Witness :

Page 2 / 9
Rickson Engineering Limited 利信機電有限公司
Current Injection
Test Report

No.

To be read in conjunction with Switchboard Test Report No.

ACB Manufacturer Terassaki


Model No. AR325S
Serial No.
Rated Current 1600A

Circuit No. in Switchboard Incomer


1. Shutter Operation
2. Mechanical Closing Operation
3. Electrical Closing Operation N.A.
4. Mechanical Tripping Operation
5. Castell Key Interlock, Key No. / N.A.
6. Shunt Trip Operation, 30 V / Hz. / DC

7. Undervoltage Release, V Hz. / DC N.A.


a) Instantaneous N.A.
b) Delayed, seconds N.A.
8. Overcurrent Tripping Operation
a) Direct N.A.
b) Indirect I.D.M.T.
9. Measuring Circuit (Facia Mounted Ammeter)
a) C.T. Ratio (Primary / Secondary) 1600/5A
b) C.T. Class Class 1
c) Primary Injection Test

Secondary Current (A) Indication Meter (A)


Primary
Injection Current (A) L1 L2 L3 L1 L2 L3

L1 - L2 1600

L2 - L3 1600

L3 - L1 1600

Page 3 / 9
Rickson Engineering Limited 利信機電有限公司
Current Injection
Test Report

No.

10. Protection Circuit


a) C.T. Ratio (Primary / Secondary) 1600/5A
b) C.T. Class 5P20
c) Primary Injection (Overcurrent)

Disc Primary Secondary Current (A) Spill (E/F


Injection Operation Current (A) L1 L2 L3 N Relay)(A)

L1 - L2 N.A. 1600

L2 - L3 N.A. 1600

L3 - L1 N.A. 1600

L1 - N N.A. 1600

L2 - N N.A. 1600

L3 - N N.A. 1600

d) IDMT Overcurrent Relays, Secondary Injection

(Manufacturer : ASHIDA ) (Serial No. : )

(Model No. : ADR241A ) (Curve : C2 (Normal Inverse 1.3/10)

L1 Phase
Operating Time (Second)
Plug Setting Time Setting Current Injected (A) Nominal Actual

100% 1 10 4.298 (3.76 - 4.83)

100% 1 25 1.834 (1.69 - 1.97)

100% 1 50 1.273 (1.20 - 1.33)

L2 Phase
Operating Time (Second)
Plug Setting Time Setting Current Injected (A) Nominal Actual

100% 1 10 3.84 (3.55 - 4.13)

100% 1 25 1.79 (1.66 - 1.92)

100% 1 50 1.30 (1.20 - 1.40)

Page 4 / 9
Rickson Engineering Limited 利信機電有限公司
Current Injection
Test Report

No.

L3 Phase
Operating Time (Second)
Plug Setting Time Setting Current Injected (A) Nominal Actual

100% 1 10 4.298 (3.76 - 4.83)

100% 1 25 1.834 (1.69 - 1.97)

100% 1 50 1.273 (1.20 - 1.33)

e) IDMT Earth Fault Relay, Secondary Injection

(Manufacturer : ASHIDA ) (Serial No. : )

(Model No. : ADR241A ) (Curve : C2 (Normal Inverse 1.3/10)

Operating Time (Second)


Plug Setting Time Setting Current Injected (A) Nominal Actual

20% 1 2 4.298 (3.76 - 4.83)

20% 1 5 1.834 (1.69 - 1.97)

20% 1 10 1.273 (1.20 - 1.33)

f) Remarks :

Prepared by : W.L.Keung Witness :

Signature : Witness :

Date : Witness :

Place : Factory Witness :

Page 5 / 9
Rickson Engineering Limited 利信機電有限公司
Current Injection
Test Report

No.

To be read in conjunction with Switchboard Test Report No.

MCCB / Fuseswitch / Isolator Manufacturer Trasaki

Model No.

Rating

Circuit No. in Switchboard

1. Shunt Trip Operation, / V / Hz. / DC

2. Measuring Circuit

a) C.T. Ratio (Primary / Secondary) /5A

b) C.T. Class Class 1

c) Primary Injection Test

Secondary Current (A) Indication Meter (A)


Primary
Injection Current (A) L1 L2 L3 L1 L2 L3

L1 - L2

L2 - L3

L3 - L1

d) Remarks :

Prepared by : W.L.Keung Witness :

Signature : Witness :

Date : Witness :

Place : Factory Witness :

Page 6 / 9
Rickson Engineering Limited 利信機電有限公司
Current Injection

Test Report

No.

To be read in conjunction with Switchboard Test Report No.

MCCB / Isolator Manufacturer Terasaki

Model No.

Rating

Circuit No. in Switchboard

1. Shunt Trip Operation, / V / Hz. / DC

2. Measuring Circuit

a) C.T. Ratio (Primary / Secondary) /5A

b) C.T. Class Class 1

c) Primary Injection Test

Secondary Current (A) Indication Meter (A)


Primary
Injection Current (A) L1 L2 L3 L1 L2 L3

L1 - L2

L2 - L3

L3 - L1

3. Protection Circuit

a) C.T. Ratio (Primary / Secondary) /5A

b) C.T. Class 5P20

c) Primary Injection

Secondary Current (A)


Disc Primary Spill (E/F
Injection Operation Current (A) L1 L2 L3 N Relay)(A)

L1 - L2

L2 - L3

L3 - L1

L1 - N

L2 - N

L3 - N

Page 7 / 9
Rickson Engineering Limited 利信機電有限公司
Current Injection
Test Report

No.

d) IDMT Earth Fault Relay, Secondary Injection

(Manufacturer : ASHIDA ) (Serial No. : )

(Model No. : ADR241A ) (Curve : C2 (Normal Inverse 1.3/10)

Operating Time (Second)

Plug Setting Time Setting Current Injected (A) Nominal Actual

20% 1 2 4.298 (3.76 - 4.83)

20% 1 5 1.834 (1.69 - 1.97)

20% 1 10 1.273 (1.20 - 1.33)

e) Remarks :

Prepared by : W.L.Keung Witness :

Signature : Witness :

Date : Witness :

Place : Factory Witness :


Rickson Engineering Limited 利信機電有限公司
7. Ductor Test for Busbar Network
Switchboard Ref :

Drawing Ref :

Point ( no. of Contact Resistance (µΩ) (Forward/Reverse)


joints)
L1 L2 L3 Neutral

Prepared by : W.L.Keung Witness :

Signature : Witness :

Date : Witness :

Place : Site Witness :

Page 9 / 9
Temperature Rise Test Record
Project Name:Replacement of Switchboard in North District Hospital

Test loop no. : 1 SWB ref. (NEW SW/BD "D" Drawing no. 800789-T01

Actual current record after end of test.


Current at each short point:-
Current inject to main incomer:- Current(A)
Phase
Phase Current (A) ST1 ST2 ST3 ST4 ST5 ST6 ST7 ST8 ST9
L1 L1
L2 L2
L3 L3

Part of
Point No. Time ==> 8:30 9:00 9:30 10:00 10:30 11:00 11:30 12:00 12:30 13:00 13:30 14:00 14:30 15:00 15:30 16:00 16:30 Limit
Assemblies
Test Point 61 Ambient_1 ( ∘C) Ambient -

Test Point 62 Ambient_2 ( ∘C) Ambient -

Test Point 1 Temp. Rise ( ∘C) Terminals 70

Test Point 2 Temp. Rise ( ∘C) Terminals 70

Test Point 32 Temp. Rise ( ∘C) Terminals 70

Test Point 4 Temp. Rise ( ∘C) Terminals 70

Test Point 5 Temp. Rise ( ∘C) Terminals 70

Test Point 6 Temp. Rise ( ∘C) Terminals 70

Test Point 10 Temp. Rise ( ∘C) Busbar 105

Test Point 11 Temp. Rise ( ∘C) Busbar 105

Test Point 12 Temp. Rise ( ∘C) Busbar 105

Test Point 13 Temp. Rise ( ∘C) Terminals 70

Test Point 14 Temp. Rise ( ∘C) Terminals 70

Test Point 15 Temp. Rise ( ∘C) Terminals 70

Test Point 16 Temp. Rise ( ∘C) Busbar 105

Test Point 7 Temp. Rise ( ∘C) Busbar 105

Test Point 18 Temp. Rise ( ∘C) Busbar 105

Test Point 19 Temp. Rise ( ∘C) Busbar 105

Test Point 20 Temp. Rise ( ∘C) Busbar 105

Test Point 21 Temp. Rise ( ∘C) Busbar 105

Test Point 25 Temp. Rise ( ∘C) Terminals 70

Test Point 26 Temp. Rise ( ∘C) Terminals 70

Test Point 27 Temp. Rise ( ∘C) Terminals 70

Test Point 28 Temp. Rise ( ∘C) Busbar 105

Test Point 29 Temp. Rise ( ∘C) Busbar 105

Test Point 30 Temp. Rise ( ∘C) Busbar 105

Test Point 48 Temp. Rise ( ∘C) Door surface 30

Test Point 49 Temp. Rise ( ∘C) Handle 25

Test Point 50 Temp. Rise ( ∘C) Door surface 30

Test Point 51 Temp. Rise ( ∘C) Handle 25

Test Point 52 Temp. Rise ( ∘C) Door surface 30

Test Point 53 Temp. Rise ( ∘C) Handle 25

Prepare & Test by: Witness:

Witness:

Date: Witness: