You are on page 1of 2

AL-RASHID TOWER

Site MV ELECTRICAL ROOM


Site Test Report Power Transformer-
NAMEPLATE DETAIL:

Manufactured by: Rated voltage:

1. MECHANICAL CHECK AND VISUAL INSPECTION

ITEM DESCRIPTION DONE REMARKS


1 Inspect for physical damage/defects (cracks, chips, etc., of the cast resin)  OK
4 Check that all groundings are securely connected.  OK
5 Perform all specific checks per manufacturer instructions.  OK
6 Perform Functional Check and Mechanical Interlock.  OK

2. ELECTRICAL TESTS.

ITEM DESCRIPTION DONE REMARKS


1 Check Continuity & Contact Resistance Test  OK
2 Insulation resistance Test (Before and After Hi pot)  OK
3 Hi Pot Test  OK

3. CONTACT RESISITANCE TEST:

Phase Resistance(µΩ) Remarks

L1 L2 L3

Bay1-Bay2 OK
Bay2-Bay3
OK
Bay3-Bay1
OK

Testing Engineer Contractor Consultant

Name: Name: Name:


Sign. Sign. Sign.

Date: Date: Date:


1
AL-RASHID TOWER

Site MV ELECTRICAL ROOM


Site Test Report Power Transformer-

4. INSULATION RESISTANCE:

i) Insulation Resistance Test

IR value
Applied points
Applied voltage Remarks
between
Before After

L1 & Earth 5kv OK

L2 & Earth 5kv OK

L3 & Earth 5kv OK

L1 & L2 5kv OK

L2 & L3 5kv OK

L3 & L1 5kv OK

ii) Hi-Pot TEST:

Phase Leakage
Applied Voltage(v) Time Duration Remarks
Current(mA)
L1 60 Sec OK

L2 60 Sec OK

L3 60 Sec OK

Testing Engineer Contractor Consultant

Name: Name: Name:


Sign. Sign. Sign.

Date: Date: Date: