Professional Documents
Culture Documents
Open M2000
Then Click “Synchronize all NEs” on header denoted with “P” sign (The 5 th sign)
After that click “GSM Application” and select “Export” then click “Export Radio Network Planning
Data”
Select NE version: In the case of “NPO Warid” we have both versions of NEs.
Select the BSCs and forward them to the next box i.e. Selected Controllers, and click next