Delivered Electronically
SIEMENS Energy “mee ose mmirne ont 3381
October 31, 2012 ‘SD-L-SEI-TCH-0087
‘CNS#:0301
Termochilca S.A.C.
Ay. La Encalada 1388 Off. 601
Santiago de Surco
Lima 33, Pert
Attn: Ms, Carmen Tatiana Alegre Chalco
Gerente General
Re: Lump Sum, Turkey, Engineering, Procurement and Construction Contract, dated as of March
24th, 2011 and any Subsequent amendments ("Contract") between TERMOCHILCA S.A.C,
(‘Owner’), Scotiabank Peru S.A.A. ("Bank") and Siemens Energy Inc. (*Contractor’) for Phase 1
of the Santo Domingo de los Olleros Power Project
Subject: Customer Witness Point (Third Notice)
Dear Ms. Alegre:
Change To: CWP Notification for the Unit-1, SGEN6-1000A, SO 12702, previously scheduled for Final
Electrical Tests Prior to Shipment, on 1 November 2012, This Test is now rescheduled for 12 November
2012.
‘Attached, please find the Official Customer Witness Notification/Acknowledgment form. In order to
effectively manage this process, make provisions for admission to our factories or our suppliers facilities
and to aid in any additional logistical requirements, please indicate your desire to attend or not attend the
test / inspection on the attached form. If applicable, please identify who will be attending the
testinspection, provide their approximate arrival date / time; sign & date in the Customer Signature block,
and preferably, return the signed form via Email. If this is not feasible, a FAX or Phone response is
acceptable. It would be most helpful if you could provide your response within three (3) working days
following receipt of this notice
| have included in the form, the names, phone numbers, and E-MAIL addresses of the factory
representative and our Projects Quality representative, should travel problems be encountered delaying
your attendance. Itis requested however that you not contact the factory or our supplier for anything
except emergency notification or travel problems affecting your attendance.
Should you desire to attend this witness point, please remind the attending personnel that our factories
and supplier facilities usually require "Steel Toe Shoes" or equivalent. "Safety Glasses" and "Hard Hats"
can be supplied by the testing facilites,
If you have any questions, please do not hesitate to contact me.
Sincerely,
1G
Richard G/Marron, PMP
Genera¥Project Manager
Attachment: (None)
Semmens Eerste ‘00 AstaSIEMENS
Electronic Deliver
Carmen Tatiana Alegre Chalco ‘mailto: talegre@termechilca.com
Eduardo Vicuna ‘mail to: evicuna@sclea.com
Cesar Norton mail to: cnorton@termochiica com
José Antonio Zolla ‘mailto: jzola@termochitca.com
‘Jorge Mendoza Mujica ‘mail to: jmendoza@termociiica.com
Document Control ‘mail to: documentcontrol@termochilea.com
‘SD-L-SEI-TCH-0087docSIEMENS
Siemens Energy, Inc.
Customer Witness Notification Form
Third Notice - October 29, 2012
Project Name SANTO DOMINGO SC
Unit# 4
Project/Shop Order Number so 12702
Equipment SGENG-1000A (Generator Assembly)
Notification Point Final Electrical Tests Prior to Shipment
‘Supplier SIEMENS ENERGY, INC.
CHARLOTTE EDI
5101 WESTINGHOUSE BLVD.
Location CHARLOTTE, NORTH CAROLINA 28273
Witness Point Scheduled -
Date/Time November 12, 2012
Supplier Contact Bemie Mical
Phone: +1 (704) 71-6852
E-Mail: bernie micalizzi@siemens.com
Customer Will Attend ( )
Customer Will Not Attend ( )
Customer Signature / Date
Signat Dato
Siemens Energy, Inc. Orlando Fl, USA Office - Projects Quality
‘Customer Contacts / David Bailey
Telephone Phone: +1 (407) 736-7573
E-Mail david. bailey@siemens.com
Fax all responses to: Fax: +1 (407) 736-5032