You are on page 1of 3
Delivered Electronically SIEMENS Energy “mee ose mmirne ont 3381 October 31, 2012 ‘SD-L-SEI-TCH-0087 ‘CNS#:0301 Termochilca S.A.C. Ay. La Encalada 1388 Off. 601 Santiago de Surco Lima 33, Pert Attn: Ms, Carmen Tatiana Alegre Chalco Gerente General Re: Lump Sum, Turkey, Engineering, Procurement and Construction Contract, dated as of March 24th, 2011 and any Subsequent amendments ("Contract") between TERMOCHILCA S.A.C, (‘Owner’), Scotiabank Peru S.A.A. ("Bank") and Siemens Energy Inc. (*Contractor’) for Phase 1 of the Santo Domingo de los Olleros Power Project Subject: Customer Witness Point (Third Notice) Dear Ms. Alegre: Change To: CWP Notification for the Unit-1, SGEN6-1000A, SO 12702, previously scheduled for Final Electrical Tests Prior to Shipment, on 1 November 2012, This Test is now rescheduled for 12 November 2012. ‘Attached, please find the Official Customer Witness Notification/Acknowledgment form. In order to effectively manage this process, make provisions for admission to our factories or our suppliers facilities and to aid in any additional logistical requirements, please indicate your desire to attend or not attend the test / inspection on the attached form. If applicable, please identify who will be attending the testinspection, provide their approximate arrival date / time; sign & date in the Customer Signature block, and preferably, return the signed form via Email. If this is not feasible, a FAX or Phone response is acceptable. It would be most helpful if you could provide your response within three (3) working days following receipt of this notice | have included in the form, the names, phone numbers, and E-MAIL addresses of the factory representative and our Projects Quality representative, should travel problems be encountered delaying your attendance. Itis requested however that you not contact the factory or our supplier for anything except emergency notification or travel problems affecting your attendance. Should you desire to attend this witness point, please remind the attending personnel that our factories and supplier facilities usually require "Steel Toe Shoes" or equivalent. "Safety Glasses" and "Hard Hats" can be supplied by the testing facilites, If you have any questions, please do not hesitate to contact me. Sincerely, 1G Richard G/Marron, PMP Genera¥Project Manager Attachment: (None) Semmens Eerste ‘00 Asta SIEMENS Electronic Deliver Carmen Tatiana Alegre Chalco ‘mailto: talegre@termechilca.com Eduardo Vicuna ‘mail to: evicuna@sclea.com Cesar Norton mail to: cnorton@termochiica com José Antonio Zolla ‘mailto: jzola@termochitca.com ‘Jorge Mendoza Mujica ‘mail to: jmendoza@termociiica.com Document Control ‘mail to: documentcontrol@termochilea.com ‘SD-L-SEI-TCH-0087doc SIEMENS Siemens Energy, Inc. Customer Witness Notification Form Third Notice - October 29, 2012 Project Name SANTO DOMINGO SC Unit# 4 Project/Shop Order Number so 12702 Equipment SGENG-1000A (Generator Assembly) Notification Point Final Electrical Tests Prior to Shipment ‘Supplier SIEMENS ENERGY, INC. CHARLOTTE EDI 5101 WESTINGHOUSE BLVD. Location CHARLOTTE, NORTH CAROLINA 28273 Witness Point Scheduled - Date/Time November 12, 2012 Supplier Contact Bemie Mical Phone: +1 (704) 71-6852 E-Mail: bernie micalizzi@siemens.com Customer Will Attend ( ) Customer Will Not Attend ( ) Customer Signature / Date Signat Dato Siemens Energy, Inc. Orlando Fl, USA Office - Projects Quality ‘Customer Contacts / David Bailey Telephone Phone: +1 (407) 736-7573 E-Mail david. bailey@siemens.com Fax all responses to: Fax: +1 (407) 736-5032

You might also like