You are on page 1of 1

BRIDGE

CRANE FILTER BACKWASH


ELECTROLYTE/
420-HO-001 WATER STORAGE TANK
420-TK-002
000-FS-006
S1 PRIMARY MIX TANK
410-TK-011
41 000-FS-005

CHEMICAL FEEDER
420-FE-001

WASH TANK HOT WATER BOILER SYSTEM


500-PK-001-TK1/TK2
420-PK-001
000-FS-009
FEED WATER PUMP CHEMICAL FEED
FRESH WATER PUMP WATER 420-PK-001-PP1 PUMP
650-PP-002/003 TREATMENT 420-PK-001-PP2
000-FS-010 SYSTEM
420-PK-001-MS1
WATER
EXPANSION TANK
FILTERED
ELECTROLYTE PUMP 420-PK-001-TK2
WASH TANK
420-PP-005/006 FEED WATER TANK 500-PK-001-TK1/TK2
000-FS-006 420-PK-001-TK1 CONDENSATE
000-FS-009
ELECTRIC
HOT WATER
44 BOILER
420-PK-001-BO1
420-PK-001-BO2
(STAND-BY)

LEAN ELECTROLYTE
HEAT EXCHANGER
No. 1
420-HX-001

HOT WATER
STORAGE TANK
420-TK-005

LEAN ELECTROLYTE
HEAT EXCHANGER
No. 2
420-HX-002
HOT WATER HOT WATER
LEAN ELECTROLYTE PUMP CIRCULATION PUMP CIRCULATION PUMP
500-PP-001/002 No. 2 No. 1
000-FS-009 41 420-PP-007 420-PP-008
ELECTROWINNING AREA
000-FS-009

ELECTROLYTE
RECIRCULATION TANK
500-TK-001
44 000-FS-009

LEGEND
MAIN PROCESS FLOW
AUXILIARY FLOW
INTERMITTENT FLOW
EQUIPMENT PACKAGE
ORGANIC FLOW ISSUED FOR
CONDENSATE PREFEASIBILITY STUDY
DO NOT SCALE 11x17 DRAWINGS
REFERENCES REFERENCES REVISIONS REVISIONS
DWG. NO. TITLE DWG. NO. TITLE NO. DESCRIPTION BY APP'D DATE CLIENT NO. DESCRIPTION BY APP'D DATE CLIENT SCALE: NONE DATE TRAPICHE PREFEASIBILITY
ARCHITECTURE
- DESIGNED BY HD AUG 18 PROJECT NO. M3-PN180149

DRAWN BY LAR AUG 18 ENGINEERING


GENERAL AND SITE PLANS DWG NO.

CHECKED BY
FLOW SHEET 000-FS-007
PROJECT MGR
CONSTRUCTION MANAGEMENT TANK FARM REV NO. DATE

CLIENT APPR. www. m3eng.com


BOILER/HEAT EXCHANGE 0 28 JUN 19

You might also like