Prepared by Mopani District Council, in partnership with government agencies across the three spheres of government
and civil society on behalf of the people of Mopani District.
This First Generation Mopani District One Plan (2021 -2023) is not intended to be a plan listing a set of static plans and
programmes – dreams and wishes that may never be realised! It is a call to action – spearheaded by the District Municipality
as key organ of the Developmental State – spelling out what needs to be done and who will do it! Join us in our journey of
development to achieve our dual objectives of poverty alleviation in the short term and poverty elimination over the long term!
1
GLOSSARY
ABET – Adult Basic Education and Training LGTAS – Local Government Turn Around Strategy
AIDS – Acquired Immune Deficiency Syndrome LSEN – Learners with Specialised Education Needs
BOT - Build, Operate and Transfer LUMS – Land Use Management Scheme
BPM – Ba-Phalaborwa Municipality OPEX – Operational Expenditure
CAPEX – Capital Expenditure MDM – Mopani District Municipality
CBD – Central Business District
1 MEC - Member of Executive Council
CBOs – Community Based Organisations MFMA – Municipal Finance Management Act
COGTA – Cooperative Governance and Traditional Affairs MIG - Municipal Infrastructure Grant
CoGHSTA- Cooperative Governance, Human Settlements and MLM – Maruleng Local Municipality
Traditional Affairs MPCCs – Multi-purpose Community Centres
COVID 19 – Corona Virus Disease 2019 MSA - Municipal Systems Act
CPFs – Community Policing Forums Mscoa - Municipal Standard Chart of Account
CRDP – Comprehensive Rural Development Programme MTAS - Municipal Turn-around Strategy
DDM - District Development Model MTSF – Medium Term Strategic Framework
DPWRI – Department of Public Works, Roads & Infrastructure OLS – Operational Licensing Strategy
DWA – Department of Water Affairs PEGDP – Provincial Employment Growth and Development Plan
PGDS – Provincial Growth and Development Strategy
ECD – Early Childhood Development
EPWP – Extended Public Works Programme PMS – Performance Management Systems
ES - Equitable Shaer PPPs – Private Public Partnerships
ESKOM – Electricity Supply Commission
GEAR – Growth, Employment and Redistribution RAL – Road Agency Limpopo 2
GEMC³ :Global Environmental Management command control centre RD&LR - Rural Development and Land Reform
GGM – Greater Giyani Municipality SADC – Southern African Developing Communities
GGP – Gross Geographic Product
GLM – Greater Letaba Municipality SANDF – South African National Defense Force
GTM – Greater Tzaneen Municipality SASSA – South African Social Services Agency
GVA – Growth Value Added
SCM – Supply Chain Management
HAST - HIV & AIDS, STI and TB
HIV – Human Immune Deficiency Virus SDBIP – Service Delivery Budget Implementation Plan
IDP – Integrated Development Plan SDF – Spatial Development Framework
IDT – Independent Development Trust SDI – Spatial Development Initiative
IGR – Inter-Governmental Relations SMMEs – Small Medium and Micro Enterprises
ISRDP – Integrated Sustainable Rural Development Programme SODA – State of the District Address
KNP – Kruger National Park SONA – State of the Nation Address
KPAs – Key Performance Areas STATSSA – Statistics South Africa
KPIs – Key Performance Indicators SWOT - Strengths, Weaknesses, Opportunities, Threats
LED – Local Economic Development UN - United Nations
LEDET - Limpopo Economic Development, Environment & Tourism UNESCO - United Nations Education, Scientific and Cultural
LEGDP – Limpopo Employment Growth and Development Plan Organisation
LDP - Limpopo Development Plan WSIG - Water Services Infrastructure Grant
WSDP – Water Services Development Plan
2
LSEN - Learners with Specialised Education Needs
TABLE OF CONTENT
2. Economic Positioning
2.1. Structure of the Mopani District Economy (Macro Economic Formation) and Emerging Issues
2.2. Highlights of the National and Provincial or District Recovery and Reconstruction Plans impacting on the
district
2.3. Highlights of the Mopani District Economic Response Plan
2.4. Highlights of the Critical Enablers for Mopani District Economic Recovery Plan
2.5. Summary of Relief Measures Cushioning the Mopani District Economy
2.6. Key Infrastructure Projects that require Unblocking
4. Infrastructure Engineering
5.1. Spatial and Environmental Challenges in the Mopani District and Emerging Issues
7. Inter-governmental Programmes, Projects and Budgets (Local, District, Provincial and National)
7.1. Summary of Inter-governmental Programmes, Projects and Budgets aimed at Growing the Economy,
Improve Service Delivery and Institutional Stability (High level statements on the three objectives and Table
for categorization of projects)
7.2. Catalytic Projects
8. Conclusion
3
1. Introduction and background
Cabinet approved the DDM as a government approach to improve integrated planning and delivery across the
three spheres of government with district and metropolitan spaces as focal points of government and private
sector investment. The envisaged integrated planning and delivery in the district and metropolitan sites will be
enabled by joint planning, budgeting and implementation process amongst the three spheres of government in
partnership with civil society and labour.
The President has called for the rolling out of “a new integrated district based approach to addressing our
service delivery challenges [and] localise[d] procurement and job creation, that promotes and supports local
businesses, and that involves communities." The District Development Model (DDM) is a new integrated
planning model for Cooperative Governance which seeks to be a new integrated, district-based, service delivery
approach aimed at fast-tracking service delivery and ensure that municipalities are adequately supported and
resourced to carry out their mandate. The DDM seeks to strengthen the local sphere of governance (with
particular focus on the district level), moving away from silo-planning, budgeting and implementation by the
various spheres of government.
The pronouncement of the District Development Model (DDM) by the Presidency has added impetus to the
municipal integrated planning process as well as national and provincial planning processes as the DDM seeks
to strengthen the integrated planning process and through this model, all developmental initiatives will be
viewed through a district-level lens across the 44 districts and 8 metros in the country. The DDM seeks to
secure maximum coordination and cooperation among the national, provincial and local spheres of government,
who will act in partnership with civil society – including communities, business and labour – at the district level
countrywide.
4
The DDM is anchored on the development of the “One Plan”. The One Plan is an intergovernmental plan setting
out a long-term strategic framework to guide investment and delivery in the 52 district and metropolitan space .
This plan is meant to be jointly developed and agreed to by all spheres of government.
The development of the first generation of One Plan is a collaborative process that requires inputs from national
sector departments, provinces, municipalities, and the private sector. The first generation of One Plans focuses
on the following areas:
This document, therefore, provides a strategic overview of the district, highlighting its challenges and possible
interventions to safeguard livelihood, grow the economy and alleviate poverty within the district.
The following analogy provides an overview and critique of the important demographic indicators of the Mopani
District. It covers the population size, age distribution, literacy levels, unemployment, income generation,
educational levels and services backlogs in the district. The socio-economic profile of the district also provides
an indication of poverty levels and development prospects.
The reconciled total population of the Mopani District Municipality has increased from 1 061 107 (Census 2001)
to 1 068 569 (Community Survey 2007) to 1 092 507 (Census 2011). Out of the entire district population, 81%
reside in rural areas, 14% in urban areas and 5% stay on farms. The population densities vary from municipality
to another, but the average is 23 people/ ha. It shows that people are sparsely populated with sufficient land
around them. The problem of land shortage for economic development is perpetrated by the vast land occupied
for dwelling purposes, leaving much little for economic growth. A move towards reduction of stands sizes may
need due consideration. The population size differs from one municipality to another and in terms of resource
allocations it should be best to consider this distribution proportionally, albeit with all factors taken into account,
e.g service backlogs, poverty stricken areas, identified growth areas, etc.
5
Local Municipalities Census 2001 Census 2011 Population Growth 2001 To 2011 Comment
Greater Giyani 239289 244 218 4 929 (+2.06%) Gained
Greater Letaba 220103 212 701 -7 402 (-3.4%) Decreased
Greater Tzaneen 375586 390 098 14 512 (+3.9%) Gained
Ba-Phalaborwa 131088 150 635 19 547 (+14.9%) Gained
Maruleng 94382 94 855 473 (+0.5%) Gained
Mopani (1 061 445) 1 092 507 31 400 (+2.9%) Gained
The average ratio male to female in Mopani District Municipality as a whole is 46% to 54% and the tendencies
and trends are still prevalent. The age and gender structure is by and large influenced by levels of fertility,
mortality and migration. These factors are also influenced by socio-economic circumstances such as education,
level of affluence (income) and location. In almost all local municipalities there are more females than males.
This is most significant in Greater Giyani and Greater Letaba municipalities which are primarily rural/ non-urban
in nature. The scenario could be attributed to low levels of education and affluence in these municipalities,
exacerbated by men seeking jobs elsewhere. Ba-Phalaborwa has comparable balance in numbers between
females and males, however with more males than females at working age categories. That is ascribed to
young men employed in the mining sector at Phalaborwa and Gravelotte mines and young women not ready for
dirty and hard jobs. The Kruger National Park also has more males than females and that could be attributed to
more men ready for field rangers’ jobs than women, with the ratio men: women being 63%: 27%. That implies
that KNP need to put more focus on employment equity with emphasis on gender balance.
The other dimension is that the current highest population number exists in the age category 15 - 19 years
whereas in the previous years the highest was in the category 10 – 14 years. These are school-going people
who need support for them to be employable in the economic sectors. There is also proportional balance
6
between boys and girls from age zero to 20. It will be important to consider males and females equally in issues
of development in this category. Ages 20 and above show females out-numbering males significantly. A further
analysis of the demographics indicates that 49,4% of the residents are still at a young age (0-19 years).
Population numbers decrease with age increase, i.e the older generation is fewer than the young one. This
implies that programmes geared at developing all people with special emphasis to women and youth will impact
much to Mopani DM. The same is true for taking heed of challenges facing these population categories.
It is also notable that population size of Mopani has grown steadily by 3% between the year 2000 to 2011, with
absolute pick up in 2005 when Maruleng and part of KNP got incorporated into Mopani. Re-determination of
municipal boundaries in 2008 has not made significant change in this trend since it affected only nature
conservation area, Kruger Park. High population growth itself is a threat to the economic growth in terms of
scarcity of prime land space. Since the main source of population growth is birth rate and emigration,
programmes geared at combating children pregnancies, women empowerment and those dealing with illegal
emigration should be strengthened. As per the Census 2011, the overall population size of Mopani District
stands at 1 092 507.
According to STATSSA data, it is noted that rural areas continue to be highly populated, regardless of low
economic activities. The clear picture of these trends is found in Greater Giyani and Maruleng municipalities.
Possible factors to these trends could be attributed to (1) the comfort of cultural values that are respected in
rural areas, (2) low land cost rural areas, (3) increasing levels of affluence (in mobility) among Black South
Africans, (4) improved provision of basic services in rural areas and (5) keeping families together (increased
level of choices due to improved commuter transport).
The African culture of “fixed home” adds to growing rural areas in that, even when people could get jobs
elsewhere they would usually prefer to retain their home at rural areas, where they grow their children. The
arguments levelled above pose a need for emphasis on rural development, to have services provided where
people want to stay. That also tests the choice for growth points in a municipality. Mopani experiences influx of
foreign nationals at a high rate. These are usually unaccounted for when providing primary services such as
water, sanitation, electricity, housing, health and education, to our citizens. The resultant is that facilities and
services are overburdened and thus the quality of services is compromised since more people are to be served
with the little that is earmarked for the few (registered citizens).
7
Although there is significant improvement in the provision of services in rural areas, the demand continues to
outweigh the supply resulting in poor quality of services. That has become a push-factor, causing influx of
(households) settlements in the fringes of urban areas for better services, causing land-lock against the growth
of those areas, e.g Giyani town. It is noted that there are movements both from rural and from urban areas for
different aspirations. The challenges that continue to surface are, amongst others:
The literacy levels in the Mopani district are low and this account for the social challenges confronting the district
which amongst others relate to unemployment; substance abuse, gender based violence, number of people with no
schooling, low average household incomes, crime and disease.The profile also indicates that HIV and TB are the
commonest cause of death for females 15-24 at 32% as compared to males at 13%. This is also noted at the age
ranging between 25-49 years at 43% for females and 35% for males respectively. Whilst at the age above 50 years
an increase is noted for males at 15% in comparison to females at 9% respectively.
The unemployment rate in Mopani District Municipality 16.32%, lower than that of Limpopo (19, 4%) and South
Africa (27.31%) in 2018, A majority of the employed (70.43%) are employed in the formal sector. Ba-Phalaborwa
Local Municipality had the highest labour force participation rate with 56.0% in 2018 increasing from 48.5% in 2008.
Greater Giyani Local Municipality had the lowest labour force participation rate of 42.9% in 2018, this increased
from 37.3% in 2008.
8
Unemployment rate, Official definition (%) 2018
30.0%
25.0%
20.0%
15.0%
10.0%
5.0%
0.0%
i rn rg
an be ne
p m ico be hu
o he p r er uk
M V Ca at kh
W Se
The largest number of employed people in 2018 were the trade sector with a total of 72 800 or 24.4% of total
employment in the district municipality. The electricity sector with 1 340 (0.4%) is the sector that employs the least
number of people in Mopani District Municipality, followed by the transport sector with 9 570 (3.2%) people
employed. The official unemployment rate decreased from 23.6 in 2020:Q1 to 21.9% in 2020:Q2. More people are
discouraged to look for employment.
The Mopani District Municipality's economy is made up of various industries. In the district socio-economic profile, it
is indicated that mining and agriculture are the two main economic sectors in Mopani. In 2018, the mining sector
was the largest within Mopani District Municipality accounting for R 26.1 billion or 34.7% of the total GVA in the
district municipality's economy. In economics, gross value added (GVA) is the measure of the value of goods and
services produced in an area, industry or sector of an economy. "Gross value added is the value of output less the
value of intermediate consumption; it is a measure of the contribution to GDP made by an individual producer,
industry or sector.
The sector that contributes the second most to the GVA of the Mopani District Municipality is the community
services sector at 20%, followed by the finance sector with 13%. The sector that contributes the least to the
economy of Mopani District Municipality is the manufacturing sector with a contribution of R 1.64 billion or 2% of the
total GVA.
The agricultural sector is the fourth largest economic contributor after mining, government and community services,
wholesale and retail. The mining sector sustains the economy, with copper, magnetite and phosphate being the
9
main minerals. Other significant mineral zones in the region are the Murchison Greenstone Belt & Giyani Greenbelt.
Copper is smelted in Phalaborwa while phosphate is transported in its raw form and processed in Richards Bay
primarily for exports. There is therefore need for feasibility studies to be conducted in order to ascertain if mining
can still be revitalized to avoid further job losses as a result of closing of mines
Most of the agricultural activities take place in Tzaneen, Maruleng and Letaba. The main agricultural produce
includes sub-tropical fruit such as tomatoes, bananas, mangoes, oranges and pineapples. The bulk of these crops
produced are exported. There are several high-value pine and eucalyptus plantations in Mopani District, particularly
within the Greater Tzaneen and Greater Letaba Municipalities. Mopani District municipality is a major producer of
tomatoes in Limpopo and South Africa, as well as export quality avocados.
In 2018, the Mopani District Municipality (MDM) achieved an annual GDP growth rate of -0.49% which is a
significant lower GDP growth than the Limpopo Province's 0.6%. According to the economic growth forecast, i t is
expected that Mopani District Municipality will grow at an average annual rate of -0.56% from 2019 to 2024. Tomato
production is mainly located in the Mooketsi area, which falls within the Greater Letaba and Greater Tzaneen
Municipalities, while citrus production is mainly found in the Letsitele area. The Mopani District Municipality also
boasts remarkable tourist attraction landmarks. The enchanting and breathtaking sceneries have become a
standard characteristic of the district. The district is also home to the:
The district also hosts the Kruger National Park, which is a hotspot of international significance, being part of Ba-
Phalaborwa and Greater Giyani Municipalities. Mopani District is part of the Great Limpopo Transfrontier Park,
borders South Africa, Mozambique and Zimbabwe which provides a good comparative advantage on Eco-tourism.
Three towns qualified as Industrial Development points, namely Giyani, Tzaneen and Nkowakowa. The modus
industries in the district are mainly basic metals and fabricated metals followed by food manufacturing. Structural
steel and engineering workshops, the processing of wood (saw milling) food manufacturing industries are
dominated by canned, preserved and dried fruit and vegetable juices which indicates a degree of linkages to the
10
local Agriculture sector. Of significance, is to ensure that even small and emerging farmers have access to these
markets.
Major trading centers in the district include Tzaneen/ Nkowakowa/ Lenyenye node, the Phalaborwa/ Lulekani/
Namakgale node and to a lesser extent the Giyani node. Key investments are also needed in towns like
Phalaborwa and Tzaneen to achieve the minimum agglomeration for sustainable industrial development.
In terms of the percentage of people living in poverty for each of the municipality within the Mopani district area,
Greater Giyani Local Municipality has the highest percentage of people living in poverty, with a total of 76.9%. The
lowest percentage of people living in poverty can be observed in the Ba-Phalaborwa Local Municipality with a total
of 58.6% living in poverty. In Maruleng, the majority of the people stay far from areas of economic opportunity.
It is clear that there is a need to access latest relevant economic data on the state of the economy from industries
operating in the district, e.g. mining, agriculture, tourism, etc. The information indicates that despite the availability
of raw materials in the form of minerals, timber and agricultural produce, there is little beneficiation taking place in
the district. This is an area where critical economic interventions need to be made. There is a need to access
adequate information about public/ private partnerships & non-governmental catalytic projects initiated in the
district.
The mining, agricultural and tourism value-chains continue to be dominated by large established businesses,
leaving emerging entrepreneurs in the margins. The current interventions undertaken by various departments and
stakeholders on Covid-19 relief financial and non-financial measures to assist entrepreneurs. Based on the
11
information at hand, there is a need to extend the social net to people living in poverty in the Greater Giyani and
Maruleng as compared to other municipalities in the district.
The profile indicates that there is high prevalence of substance abuse, particularly in Greater Tzaneen municipality
and there is no Treatment Centre in the district to deal with the scourge of drug abuse. The profile also indicates
that unemployment in the district is compounded by lack of technical skills amongst people which has a negative
impact on the prospect of employment across many sectors of the district economy.
There is also a serious shortage of schools, and more specifically, classrooms in almost all the local municipality
areas for both primary as well as secondary schools. Facilities and more specifically infrastructure such as
electricity, water, sanitation is also needed. The profile also indicate is a high instance of poverty among youth in
the district, resulting in most unable to pursue secondary and tertiary education or training, which presents a
challenge in terms of their skills development and employment prospects.
The most urgent health problems in the five local municipalities are Sexually Transmitted Diseases (STDs),
Turbercolosis (TB), Cancer and HIV/AIDS. The contributory factors for high prevalence of HIV/AIDS and related
diseases are indicated as:
The profile has also indicated a high rate of teenage pregnancy in the district and attributes this, partly, to socio-
economic situations which adversely contribute to teenage pregnancy. The prevalence of HIV/AIDS has also
resulted in the increase of child-headed families without any source of income. The Mopani District is characterized
by high rate of crimes, such as, murder, attempted murder, rape, robbery with aggravated circumstances, assault
and so forth. The main criminal activities taking place in the district, are theft in general, burglary at residential
premises, assault with the intent to inflict grievous bodily harm, common assault, malicious damage to property,
12
burglary at non-residential premises, sexual crimes, shoplifting, commercial crime, theft out of or from motor
vehicle. The South African Police Service (SAPS) is responsible for the safety and security in the district.
Although, municipalities have a legislative requirement to provide for safety and security services (municipal
policing), currently the municipalities within the district do not have the capacity to render these services. There are
Community Policing Forums (CPFs) in all the local municipalities who work in partnership with the police to curb
crime in the community.
Education investments are crucial for sustained economic growth as it directly contributes to increased workers’
productivity, more rapid technological adaption and innovation, as well as better natural resource management. The
key outcomes of education should be the primary school completion rate, gender disparity in enrolment, adult
literacy, student learning outcomes and the efficiency of the education provisioning system. For the district to
achieve economic growth, safety and security is required to attract investments and thus create jobs and poverty
alleviation. There is also a need to ensure that ECD Centres are registered, regulated and access funding given the
large number of children born in the district. There is a need for additional classrooms and refurbishment – 36
schools, 27 schools need additional classrooms and refurbishment, 33 schools need sanitation and 29 schools
need water.
The extension of the social security net is required with services such as provision of grants, social assistance
interventions and other service delivery intervention and programmes in the improvement of the quality of life for the
vulnerable groups, e.g. an increasingly aging population, the disabled and Child-headed Households. Facilities and
more specifically infrastructure such as electricity, water, sanitation is also needed at many schools within the
district municipality area. It is indicated that the condition of the buildings of the majority of the primary and
secondary schools are in a very poor conditions.
The Mopani District also experiences an influx of foreign nationals at a high rate. These are usually unaccounted for
when providing primary services such as water, sanitation, electricity, housing, health and education, to our
citizens. The resultant is that facilities and services are overburdened and thus the quality of services is
compromised since more people are to be served with the little that is earmarked for the few (citizens) and the
demand continues to outweigh the supply resulting in poor quality of services.
13
There is a mismatch between the qualifications Engage with education institutions as well as industry to
that people have and the skills required by industry. determine the skills required in the key sectors of
the district economy and align the institutional
curricula to the needs of industry.
There is a high level of unemployment amongst the Promote skills development by encouraging the youth
youth in the district. to undergo artisan training to fit the needs of industry.
The is a high prevalence of substance abuse in the There is a need to establish Treatment Centre(s) in
district the district to deal with the scourge of drug abuse.
Gender based violence Gender fora, SAWID, Women coccus, Women’s
month, 16 Days Activism against women & children.
1.3. Spatial Challenges confronting the Mopani District, Emerging Issues and Proposed Interventions
Mopani District municipality is situated in the North-eastern part of the Limpopo Province, 70 km and 50km from
Polokwane (main City of the Limpopo Province), along provincial roads R81 and R71 respectively. It is located,
on global view, between the Longitudes: 29ْ 52´E to 31ْ 52´E and Latitudes: 23ْ 0´S to 24ْ 38´S, with 31ْ E as the
central meridian. It is located in the Degree square 2431 Topographical sheets. Tropic of Capricorn (Lat
23°26′12.0″) passes through the District along Jamela village and Mopani Camp in KNP.
It is bordered in the east by Mozambique, in the north, by Vhembe District Municipality through Thulamela &
Makhado municipalities, in the south, by Mpumalanga province through Ehlanzeni District Municipality
(Bushbuckridge, Thaba-Chweu and Greater Tubatse) and, to the west, by Capricorn District Municipality
(Molemole, Polokwane & Lepelle-Nkumpi), in the south-west, by Sekhukhune District Municipality (Fetakgomo).
The district spans a total area of 2 001 100 ha (20 011 km²), inclusive of portion of Kruger National Park from
Olifants to Tshingwedzi camps or Lepelle to Tshingwedzi rivers. There are 16 urban areas (towns and
townships), 354 villages (rural settlements) and a total of 129 Wards.
14
Map indicating the spatial location of the Mopani District in the Limpopo Province
The district is named Mopani because of the abundance of nutritional Mopani worms found in the area. By virtue
of the Kruger National Park being part of Ba-Phalaborwa and Greater Giyani municipalities, Mopani District is
part of the Great Limpopo Transfrontier Park, the park that combines South Africa, Mozambique and Zimbabwe.
The strategic location of the District embodies both advantages and disadvantages. The communities of Mopani
should be well positioned in order to harness advantages that come with their neighbourliness with
Mozambique. The converse is also true. Problems are even more apparent than advantages. Health and
security (on borders) pose signals.
A definite fragmented urban and rural form is evident in all areas throughout the district. This can mainly be
attributed to economic factors and racial segregation induced by past legislation causing artificial fragmentation
in the rural and urban areas. The implementation of the Group Areas Act resulted in the segregated residential
development pattern that saw the Black, Asian and Coloured population groups being removed to peripheral,
separate and inaccessible locations. Within Mopani, black people have since been concentrated in the former
homeland areas of Lebowa, Venda and Gazankulu.
The fragmented spatial structure where most of the economic activities are concentrated in predominantly white
urban concentrations and farms resulted in the concentrations of the majority of the population within areas
severely at distant from their place of work. These areas experience severe poverty and low human
development potential due to high illiteracy rates, low income and a generally low life expectancy, accompanied
by low levels of social and basic engineering services.
15
Map depicting the spatial location of local municipalities in the Mopani District
Abutting with Mozambique afford the citizens of the Mopani District proximity to access the beaches in
Xaixai, Baleni, etc and also make Mopani a gate-way through Giriondo Border post on tourism
promotion;
There is vast land in rural areas that could be effectively utilized for agricultural purposes which,
therefore, calls for land audit to identify land ownership aspects for the purpose of access;
Identified growth points/ areas that could afford opportunity for concentration of socio-economic
development, supported by citizens and stakeholders; and
Proximity to Great Limpopo Transfrontier Park and internationally acclaimed Kruger National park for
strengthening tourism.
In line with NSDP, focus should be placed on concentrating economic development within the Growth Points to
increase urbanization in the District. Albeit basic services need to be addressed in every settlement. The current
dispersed settlements pattern constrains sustainable development. These villages should be linked and
economically dependent on one another to maximize mutual benefits and cross subsidization out of the scarce
resources. One other dynamic is that there are clear spaces (called buffer zones) between urban and rural
settlements, the situation that had been borne by apartheid, ensuring that the poor never see themselves
deserving the same dignity as those in towns. Programmes to transform such view should be employed, from
social to infrastructure activities.
Based on the information contained in the profile, there is general institutional stability in the district and IGR
structures, Council and its Committees are functional. Hereunder is a table outlining the organisational
arrangements across municipalities in the Mopani District:
There is an impressive filling of strategic positions across the municipalities in the Mopani District.
All municipalities have established the required Council Committee for the effective functioning of the
respective municipalities as outlined below.
18
Roads and Transport Yes Yes Yes Yes Yes Yes
Sports, Arts and Culture Yes Yes Yes Yes Yes Yes
Local Economic Development Yes Yes Yes Yes Yes Yes
Rules and Ethics Yes Yes Yes Yes Yes Yes
Planning and Development Yes Yes Yes Yes Yes Yes
Ward Committee Forum Yes Yes Yes Yes Yes Yes
IT Steering Committee Yes Yes Yes Yes Yes Yes
Audit Steering Committee Yes Yes Yes Yes Yes Yes
Budget Steering Committee Yes Yes Yes Yes Yes Yes
Risk Committee Yes Yes Yes Yes Yes Yes
Municipal Tribunal Committee Yes Yes Yes Yes Yes Yes
The table below outlines the establishment and functionality of Internal Audit Committees in the respective
municipalities within the district. However, there is no clear picture of as to whether Mopani, Greater Tzaneen,
Greater Letaba Municipalities convene their Audit Committee meetings.
Financial Viability
19
Ba-Phalaborwa Qualified Qualified Qualified Disclaimer Disclaimer
Unqualified with Unqualified with Unqualified Unqualified with Unqualified
Maruleng findings findings with findings findings with findings
Mopani Qualified Qualified Adverse Disclaimer Adverse
20
Taking a cue from the directives from national government, the following Inter-Governmental structures were put
in place in the Limpopo Province to coordinate efforts to mitigate against COVID-19 from the province to the
district:
This resulted in the Limpopo Provincial Government and District Municipalities developing District COVID-19
Response Action Plans. The national lockdown has severely impacted businesses and investment negatively in
the Mopani District. Sectors of mining, agriculture, tourism, manufacturing, wholesale & retail, construction,
transport have been negatively affected. Jobs have been lost and businesses have closed in the district and
illegal business activities have mushroomed. In brief, business and investment confidence is at its lowest and
negative economic impact reverberating into the future.
COVID – 19 limits labour intensive industries and movement of people constrained locally, regionally and
globally. Workplace closures disrupt supply chains and lower productivity resulting in lay-offs, declining income
and uncertainty. Current estimates of SA growth in 2020 across 10 major local and international institutions
suggest local economy will contract between a range of -5,4% to -7.7%, an average of -7,1% . Provincial sectors
of mining, agriculture, tourism, wholesale & retail, construction, transport have been severely negatively
impacted.
Over a 5-year period Agriculture seems to be the only sector with a bigger positive average growth of 2.9% due
to less lockdown restrictions and increasing global and domestic demand of agricultural commodities
21
(Provincial). The agriculture sector is expected to grow fastest at an average of 2.89% annually from
R 1.91 billion in Mopani District Municipality to R 2.2 billion in 2024. The negative impact of COVID-19 is
projected to be prolonged in the Construction, Mining and Manufacturing sectors. Tourism sector is also
expected to recover gradually following the relaxation of lockdown restrictions. The sector that is estimated to
grow the slowest is the mining sector with an average annual growth rate of -3.61%.
The thrust of DDM is to strengthen inter-sphere planning (IDP), budgeting, and M & E processes for impactful
service delivery incorporating private sector, organized labour and civil society contributions to the socio-
economic development agenda of the Mopani district. The main deliverables of the DDM has been the District
Socio-Economic profiles as a precursor to the crafting of area based One Plan.
This joint work is expressed through the formulation and implementation of a “First Generation One Plan” which,
through review in the next financial year would be a long-term strategic framework to guide investment, service
delivery and development in relation to the Mopani District. This “One Plan” highlight the key challenges facing
the Mopani District as well as proposed interventions which would have to be considered by municipalities and
sector departments, in collaboration with civil society and labour, during their next planning processes. This
would have to be done in a quest to develop integrated cities, towns, rural areas and ensure social cohesion,
promote local economic development whilst ensuring environmental sustainability as depicted in an outline of
integrated development planning below:
22
The District Development Model (DDM) as an operational model for improving cooperative governance aimed at
building a capable, ethical and developmental State embodies an approach by which the three spheres of
government and state entities, civil society, business and organised labour work collaboratively in an impact-
oriented way, and where there is higher performance and accountability for coherent service delivery and
development outcomes.
2. Economic Positioning
The Mopani District Municipality's economy is made up of various industries. In the profile, it is indicated that
mining and agriculture are the two main economic sectors in Mopani. In 2018, the mining sector was the largest
within Mopani District Municipality accounting for R 26.1 billion or 34.7% of the total GVA in the district
municipality's economy.
In economics, gross value added (GVA) is the measure of the value of goods and services produced in an area,
industry or sector of an economy. "Gross value added is the value of output less the value of intermediate
consumption; it is a measure of the contribution to GDP made by an individual producer, industry or sector.
The sector that contributes the second most to the GVA of the Mopani District Municipality is the community
services sector at 19.6%, followed by the finance sector with 12.8%. The sector that contributes the least to the
economy of Mopani District Municipality is the manufacturing sector with a contribution of R 1.64 billion or 2.18% of
the total GVA. The agricultural sector is the fourth largest economic contributor after mining, government and
community services, wholesale and retail.
With a GDP of R 83.1 billion in 2018 (up from R 40.3 billion in 2008), the Mopani District Municipality contributed
23.21% to the Limpopo Province GDP of R 358 billion in 2018. In 2018, the mining sector was the largest within
Mopani District Municipality accounting for R 25.8 billion or 34.4% of the total GVA in the district municipality's
economy. The profile indicates that the sector that contributes the second most to the GVA of the Mopani District
Municipality is the community services sector at 19.8%, followed by the finance sector with 12.9%.
23
In terms of the profile, in 2018, there were 298 000 people employed in Mopani which is 22.36% of the total
employment in Limpopo Province (1.33 million), 1.83% of total employment in South Africa (16.3 million).
Employment within Mopani increased annually at an average rate of 2.89% from 2008 to 2018. Information
contained in the profile indicates that the unemployment rate in Mopani District Municipality was 16.32% in 2018.
The unemployment rate in Mopani District Municipality was lower than that of Limpopo (19, 4%) and South Africa
(27.31%) in 2018. A majority of the employed (70.43%) are employed in the formal sector. 18.3% have completed
matric or higher education, with 8.7% of the population with no formal education. Ba-Phalaborwa Local Municipality
had the highest labour force participation rate with 56.0% in 2018 increasing from 48.5% in 2008. Greater Giyani
Local Municipality had the lowest labour force participation rate of 42.9% in 2018, this increased from 37.3% in
2008.
In terms of the percentage of people living in poverty for each of the municipality within the Mopani district area,
Greater Giyani Local Municipality has the highest percentage of people living in poverty, with a total of 76.9%. The
lowest percentage of people living in poverty can be observed in the Ba-Phalaborwa Local Municipality with a total
of 58.6% living in poverty. In Maruleng, the majority of the people stay far from areas of economic opportunity.
Given the economic stress that business (formal and informal in various sectors) is experiencing, the Limpopo
Province has introduced supplementary support measures. These measures are meant to be implemented
24
during and the immediate post-lockdown period up to the end of financial year 2020/21 to ameliorate the effects
of the COVID-19 lockdown. The tables below outlines the Limpopo’s Short Term COVID-19 Intervention
Measures:
Hereunder are tables indicating the Limpopo’s short term economic stimulus:
25
materials and equipment) media and application through LEDA
regional offices
Productivity Programme (this Turnaround solutions for 50 companies (province) and 10 per
programme is implement by existing companies so that they District
LEDET, LEDA, SEDA and are competitive
Productivity South Africa)
Spaza shops owned by South Bulk buying and stock to a Maximum amount set for R5000. The
Africans select number of spaza shops beneficiary can be mobilised through
print and digital media and application
through Municipal Offices
Establishment of the provincial The provincial communication SMMEs, Cooperatives, Disaster
call centre nerve centre to support the Management and the population in
economic players and support general
government programmes
Expansion of EPWP and Youth The youth are the most affected Increase the number of EPWP
Programmes and there is a need to support beneficiaries and expand the youth
them (employment and programme beyond the 2020/21 plan
enterprise development).
Expansion of existing
programmes for:
Working for water;
Working for Fire
Tourism Graduate
Programme
Other Youth placement
and entrepreneurship
programmes
CWP (Community Work
Programme)
The implementation of Local Ensuring that the government Limpopo based SMMEs and
Procurement Accord and the industries procures Cooperatives
locally (to be measured in
terms of an increase of the
26
proportion of local procurement
of the total procurement budget
Manufacturing Support For Limpopo based SMME who Ensuring that Limpopo based SMMEs
Programme manufactures COVID-19 are registered to the Treasury
products such as masks, Procurement Portal and production
gloves, sanitisers, other PPE, support and market access
etc
Recycling Enterprise Industrial symbiosis The whole value chain of waste
Programme programmes management and recycling
Business Registration and Census of the Limpopo A massive programme to roll-out the
Compliance business per geography and business registration process through
category and ensuring that they the Youth Unemployment database
registered and tax compliant
Food parcels provisioning Expansion of the food bank to Social Development Department
cater for the households whose programme
income is less than R3000 per
month
The following are key critical areas which must be addressed in order to ensure resilience in containing the
spread of coronavirus in the Mopani District:
COVID-19 Health Priorities;
Workforce (staff);
Basic services;
Food and water security;
Economic activities;
Environmental health and integrity (environmental crime); and
Institutional arrangements and policy
The day to day issues in relation to containing the spread of COVID-19 in Mopani have been:
CoGTA reprioritized the Municipal Infrastructure Grant (MIG) as well as Integrated Urban Development Grant
(IUDG) to fund the COVID-19 priorities on water and sanitation. National Treasury allocated additional MIG grant
for COVID- 19 projects. Mopani as the Water Services Authority had to ensure substantial investment in water
provision as a results of COVID 19. Short and long term water projects were prioritized for more resources.
The successful implementation of the plan is dependable on the capacity of the institution. Staffing of critical
units for the implementation of the plan with enough professional subject specialist staff and allocation of
operational budget will enable the successful implementation of the plan. Establishment, revitalization and
strengthening of Inter-governmental Fora and Economic Development Fora will enable the Municipality to tap
expertise from provincial, national and private sector towards the implementation of the One Plan.
The COVID-19 pandemic has created a realization that social compacting can go a long way in achieving
sustainable development by integrating resources from the social partners. Leveraging on the relationship
which COVID-19 has created in the form of District Command Council, private sector, labour, communities and
organs of state can be key enablers of the plan. Mining Companies and big business in the Mopani District
should be encouraged to channel their Social and Labour Plans and their Corporate Social Responsibility
budgets to support COVID-19 relief measures and initiatives.
Virologists predicts that COVID-19 is going to be with us for a while until a vaccine is developed and available
to all in the world which might take several years. Projects and relief measures identified in the recovery plan
should inform resource allocation for now and the near future. Reprioritisation of resources should be
considered for the successful implementation of the plan. Mobilisation of private sector resources to assist in
the implementation of initiatives and relief measures will go a long way in realising the objective of this plan.
Seda assisted a total of 53 SMMEs in Mopani on various Spaza Shop -SMME Brand Support Programme
(SSSP)
Automotive Aftermarkets Programme Matching SMME brands Post funding support- various training &
with markets bulk purchasing at wholesale markets
Clothing & textile programme
Provision of Water from Nandoni Dam to the Greater Giyani Local Municipality.
Resuscitation of the Sapekoe Tea Plantation.
Construction of the N’wamitwa Dam and raising the wall of Tzaneen Dam to address the water shortage
problem in the district.
Mosupatsela Project
30
3. Integrated Services Provisioning
The First Generation One Plan for Mopani District offers the district the opportunity ensure seamless integration
between the basic services (largely provided by municipalities) and social services which is mainly the
responsibility of the provincial and national spheres of government. This section of the plan outlines the status
quo of both basic and social services in the district and the challenges thereof. The primary objective is to draw
a vivid picture that should be used as a rationalization for planning in Mopani District by all stakeholders. The
first part of the section deals with basic services and the second entails social services.
Water Services
Ba-Phalaborwa municipality has adequate reticulation system, followed by Greater Tzaneen Municipality,
Greater Letaba Municipality and then Greater Giyani Municipality. The limited availability of infrastructure in
Greater Giyani is attributed to the fact that the villages in the Greater Giyani area are spatially scattered,
resulting in difficult and expensive processes to provide water supply pipelines in the villages. The drastic drop
in the water level of Middle Letaba river shocked Giyani communities when drought was even declared
nationally in 2009/10.
It is also deduced that the major factor contributing to shortage of water is related to social aspects. These
aspects are mainly vandalism of infrastructure, especially communal boreholes, lack of willingness from the
consumers to pay for their water services and illegal (unauthorized) connections of pipelines by communities.
These problems are usually prevalent in rural areas than urban areas. Over-usage of water is generally
31
observed in most of the areas, amounting to more than 150 litres per person per day in both towns and villages.
Communities are yet to do more to save the already scarce water.
The majority of households in Ba-Phalaborwa (77,3%) have access to RDP standard water, Greater Tzaneen at
53,6%, Greater Letaba at 60,7%, Greater Giyani at 57,3% and Maruleng the lowest at 49,9%. However, taking a
look at the households access to the various sources of water per local municipality as a percentage of the
district, it becomes clear that the level of services are higher in Ba-Phalaborwa with 35,3% of the households
within the district with access to water inside their dwellings, especially when taking into consideration that only
12,9% of the households in the district reside in Ba-Phalaborwa. The smaller population and the absence of
many scattered villages in Ba-Phalaborwa, compared to e.g Greater Giyani, probably contributed to this.
All municipalities in the district are providing free basic water to some extent (6000 litres per household per
month) with almost none providing free basic waste removal. To eradicate the water backlog, Mopani district as
the water services authority has prioritized water services as the first service among all the other services. The
Department of Water Affairs (DWA) is currently busy with the establishment/ construction of the N’wamitwa Dam
and the raising of the wall of the Tzaneen Dam to address the water shortage problem in the district. Due to the
alarming drought that prevailed in the year 2009 there are plans in place to ensure that the situation does not
repeat itself. Already bulk water supply pipeline project is initiated to source water from Nandoni dam in
Vhembe into Nsami dam in Greater Giyani.
The optimization and conservation of existing water resources is one of the greatest aspects to be addressed in
the development strategy of the district due to the centrality of water to human well-being, agricultural
development and economic growth. This implies that, although RDP level should be the minimum, the bulk
supply design should cater for higher levels to avoid unnecessary reconstruction in future. Thus, sound-
engineering principles that should be used in the design and implementation of water services in the district
taking into consideration future socio-economic developments.
Review of the municipality MTEF on grants to accommodate identified and approved projects.
A funding mechanism required to resuscitate the stalled projects.
PPP models on water infrastructure development on concession period
Takeover of Water provider services on the phases or stages, run own billing and collection
32
Summary of Challenges
• The effects of the COVID 19 pandemic of procurement of PSP and contractors affected the
forward planning
• Shortage of skilled staff (organisational structure reviewed and the challenge is being
addressed)
• Abuse of the 30% LED allocation (Community participation) by local SMME resulting in
stoppage of projects and contractors claiming for standing time.
• The municipality has stalled projects which require funding to be completed & commissioned.
SANITATION
Lack of access to basic sanitation services has created massive environmental and health
problems in both rural and urban areas in the district. The high backlog in the RDP level
sanitation in villages constitutes a major risk in terms of ground water pollution. The main
types of sanitary systems used in the district are water-borne sewerage (flush toilets), septic
tanks, Ventilated Improved Pit latrines (VIP), French drains and ordinary pit latrines. Water-
borne sewerage is mainly found in towns and townships, septic tanks are mainly on
privately owned properties like farms, hotels, etc., with the rest mainly found in rural areas.
Most people in the district use pit latrines, followed by those without any sanitation services
at all. The situation is worse in Greater Giyani with 54% of the households not having
access to any sanitation. Greater Letaba has the highest usage of Pit Latrines at 51,5%,
while flush toilets are more prevalent in Ba-Phalaborwa at 39,8%, which correlates with the
availability of piped water within the houses. The district municipality has the constitutional
responsibility to provide access to sanitation services.
Ba-Phalaborwa 34 867 - -
There are still some schools and clinics that are without sanitation in the district. Many other
schools use pit latrines that are inadequate, dirty and unsafe. This all adds up to a potential
health time bomb for the district. DWA is responsible for dealing with school sanitation.
In Mopani, electricity is largely provided by ESKOM. Only two Local municipalities (BPM &
GTM) are lecenced to provide electricity. The GGM, MLM and GLM are fully dependent on
ESKOM. Mopani District Municipality has a role of providing bulk electricity to the local
municipalities. However, this function is yet to be fully undertaken. National government in
consultation with the South African Local Government Association (SALGA), ESKOM and
other stakeholders are engaged in discussions regarding the restructuring of the Electricity
34
Distribution Industry in South Africa with the aim of ensuring that the industry is able to meet
the needs of electricity consumers in the country and improve the roll out of electricity.
The four local municipalities in the district have signed the service level agreement with
ESKOM for the rolling out of Free Basic Electricity to indigent households in the district.
Each poor household is entitled to 50KWh per month. It has been found that most of the
people in rural areas and amongst low income households, continue to use a range of
energy sources like wood to meet their needs, irrespective of whether their houses are
electrified or not. In addition, inefficient energy use compounds poverty: housing without
ceilings and a complete lack of accessible information to users on appropriate and efficient
energy use condemn poor households to a future of high energy costs.
WASTE MANAGEMENT
The district municipality is still having a serious challenge with waste management
irrespective of the existence of the Integrated Waste Management Plans developed few
years ago for all local Municipalities in the district. Out of five local municipalities in the
district it is only Greater Tzaneen and Maruleng local municipalities that are having
authorized waste management facilities / landfill sites. Greater Giyani, Greater Letaba and
Maruleng Local Municipalities have also acquired authorization for Waste disposal sites at
Ngove, Maphalle and London respectively. The District municipality has set aside funds to
establish the disposal sites in these three municipalities. Ba-Phalaborwa Local Municipality
is using informal site and application for authorization is yet to be made. Most of waste
management services are rendered in townships and to a limited scale to rural households.
35
Hazardous wastes are transported to disposal facilities in Gauteng by private contractors
from mines around Ba-Phalaborwa. Department of Health has also hired a Private
consultant to collect and transport medicinal wastes from all hospitals and clinics in the
district to waste disposal facilities in Gauteng. There are about 98 private surgeries that are
also handling health care risk wastes. They submit their wastes to nearest public health
facilities where they are managed further. Despite that there are still cases where medicinal
wastes are dumped indiscriminately on land around community settlements, particularly in
Greater Giyani municipality. Private practitioners need to be engaged seriously on this
malpractice. The district municipality is intending to shift away from its current practices of
waste management which is “End of Pipe” to an integrated approach in dealing with wastes.
This will involve waste minimization at source, reuse, reduction, recycling and composting.
The new approach will ensure the collection and transportation of that cannot be reused,
recycled or composted.
Human wastes are also a concern in the predominantly rural municipality like Mopani.
Human waste relate to the actual human excrements, as well as corpses. A large section of
our rural community uses the pit latrines for human waste disposal. The RDP Sanitation
Programme is assisting a lot in reducing the backlog on sanitary facilities. Only very few
people especially those with readily available water supply are having flushing toilets.
There are several recycling activities taking place in Greater Tzaneen, Ba-phalaborwa and
Greater Giyani local Municipalities operated by private companies and these initiatives need
to be supported by all spheres of government so that waste is managed in an integrated
manner hence maintaining high environmental quality in our surroundings. It is appreciable
that both District and Local municipalities are aware of challenges facing their
constituencies and hence a hope for a solution.
Human waste in towns and townships is pumped to the sewerage treatment plants, where is
liquidised, any solids (cotton buds and stuff) removed by a coarse filter and put in a large
pond to settle. The semi clean water is drained off and sprayed over a filtration medium,
such as gravel or stone chips where bacteria dine on any organic particles. The final effluent
is drained off into the nearest stream or river.
Refuse Removal
36
Most rural communities in Mopani do not have access to wastes removal services from local
municipalities. Residents in these areas dispose refuse on their own often in an uncontrolled
way. This practice has adverse consequences for environmental health. An in-road has
been made to take waste management services to rural households.
Refuse removal services by municipalities have been focusing in urban areas (towns and
townships). The situation needs to receive urgent attention, especially in the four rural
municipalities, i.e Greater Giyani, Greater Letaba, Ba-Phalaborwa and Maruleng. The
recent in-roads into rural areas is a positive move in improving the quality of life for rural
communities. More and more resources are needed to turn the situation around.
Despite the fact that Ba-Phalaborwa Municipality won the national cleanest town award for
keeping Phalaborwa Town clean, it has its own waste management challenges as follows:
Existence of mines which to some extent they contribute to both atmospheric, land and
water pollution;
The current waste disposal site is full, and needs closure and rehabilitation;
Problem of delay in the outcome of the Land Claim to the new identified landfill site;
Dumping site at Namakgale was closed and it is yet to be rehabilitated to Marula
Orchards
through funding from Foskor mine;
Two identified Wetlands, at Majeje and Mashishimale villages are disturbed by human
activities which threatens the Biodiversity of these important natural resources;
Three informal settlements with approximately 1143 households without access to basic
services like waste removal, sanitation, water and electricity also contribute to
environmental pollution,
Problem of deforestation which result in most areas being exposed to soil erosion, and
Lack of waste removal services at rural communities also poses a challenge as these
areas are heavily polluted due to littering and uncontrolled dumps.
The waste management problems in the Greater Letaba Municipality revolve around the
following:
37
There is no general waste landfill site, hence they transport their waste to Greater
Tzaneen municipality and this is a costing service delivery option for the municipality.
Although a new site has been identified between Modjadjiskloof and Mooketsi, the
necessary agreement is yet to be finalized;
The garden refuse site which is located at a stream bank causes serious water pollution;
There is no proper control over the site, hence both general waste and waste from
motor garages is found dumped in the site, causing more problems;
There is one informal settlement with 2792 dwellings that do not have access to basic
services like waste removal services and proper sanitation facilities, these as well
threatens the environment, and
There is one identified wetland at Jamela, which is partially destructed by human
activities, which disturbs biodiversity.
Greater Letaba Municipality is authorized for Waste Dispoal site at Maphalle village. The
facility is yet to be developed.
The Giyani town is currently using unlicenced waste disposal site and is waiting for the
new site to be developed the most polluted in the district, with a lot of shacks and open
fires. This is caused by the following factors:
38
Greater Tzaneen is on course with managing waste in its area of jurisdiction, hence it has
properly licensed landfill site. The municipality has contracted out the waste removal
services to a private company. The municipality has further extended its waste
management services to rural areas where transfer facilities are located at schools where
number of villagers put their household refuse for further collection by the Municipality.
There is also a problem of street traders who also contribute to the problem of littering.
There are two informal settlements with 2 493 dwellings who need basic services as well.
(v) Maruleng
The municipality has been providing waste collection services in three management areas:
Hoedspruit, Kampersrus and Drakensig for a total of 660 households. Twice a week kerb
site collection in urban residential, and township take place.. Municipality has licenced
London landfill site. This account for collection from about 3% of households in both
commercial and residential areas. There is no refuse removal provided in some of the
villages (23 in number) and the households rely mostly on backyard dumping, burial and
burning. These practices adversely impact on human health and the environment,
specifically:
Road usage is a reflection of a people’s mode of life. The routes, frequency and volume of
passengers and goods should basically inform the criteria for the prioritisation of road
39
works, i.e. resource commitment for maintenance, tarring/ paving, lining, stormwater
drainages, signage, etc. Roads in Mopani District are classified as National, Provincial,
District or local roads.
Road Agency Limpopo (RAL) is the roads authority for provincial roads as well as District
roads. This is in exception of the assigned national roads. RAL is currently responsible for
paving/ tarring of gravel roads. All maintenance operations are done by the provincial
Department of Roads and Transport (DoRT). RAL also does roads conditions assessment
once in two years.
The state of roads in the district have an impact on the economic development of the area
as it is clear that most roads, leading to where the majority of the district population resides,
are not tarred/ paved, and as such, hinder the proper transportation of people, goods and
services to these areas. Fences along the roads in the district are also vandalized. Freight
transportation of agro and mining products, timber etc. are impacting heavily on the roads in
the district.
40
Summary of Health Care Challenges and Proposed Interventions
Lack of infrastructure for the required standards of health Go for PPP and apply BOT.
services
Unaccounted population using health facilities. Border management and control
Health facilities that do not provide 24hours services Improve security and provide accommodation
Inadequate emergency services vehicles Budget prioritise transportation
Shortage of medication from time to time Communication need to be improved
Shortage of housing for medical personnel in rural areas Housing be provided for medical personnel
in rural areas
Covid 19 pandemic in the rise of infection Vaccination and compliant to safety protocols
*Notes to Consider
The district has embarked on large scale sanitation programme and providing
Ventilated Pit Latrine (VIP). This requires support from relevant stakeholders.
*Notes to Consider
Eskom is experiencing capacity challenges in Fetakgomo Tubatse;
Unplanned (mushrooming) of new site remains a challenge that has direct impact on all
services but mainly electricity. This is because electricity is usually the first priority that
communities enlist to municipalities. This challenge calls for the implementation of land
use planning in accordance with municipal SDFs; and,
The fact that Stats SA reports that there are 6 160 households that are connected to
electricity without paying highlights that there are issues of illegal electricity connections.
This is hampers the revenue collection of both Eskom and local municipalities that are
licenced (Elias Motsoaledi and Ephraim Mogale) to provide electricity.
Waste Management
41
*Notes to Consider
None of the landfill sites in the district are licensed.
Social Services
This is primarily the competence of provincial and national spheres of government. Social
services from provincial and national government complement the municipal basic services.
For example, health, education and housing services (province) require water services
(local). On the same vein, access to internet services and telecommunications (national) are
pivotal to the development aspirations of the Mopani District One Plan. Reflecting the status
quo with regard to social services in the district is a requisite for guiding national and
provincial governments to initiate programmes and projects that could respond to the
people’s needs on the ground.
The district is confronted by service delivery challenges recording lower averages than the
national averages with regards to the provision of basic services, with the exception of
electricity. 63,55% of households in Mopani’s main source of water for drinking was delivered
via piped connections in 2016. Households with access to a flush toilet – 18.21% or chemical
toilet stood at 1.02% in 2016 lower than the 19,3% recorded in 2011. 95,7% of households
were connected to the mains electricity supply. The District is a Category C2 municipality
meaning that it is a Water Service Authority (WSA).
The socio-economic profile indicates that the key economic sectors in Mopani District are
mining, agriculture and Tourism. It, however, does not provide adequate information with
regard to infrastructure needs of each sector in relation to water provision, energy supply and
transport networks.
The profile provides an indication of people’s / households’ access to basic services in the
district. It indicates that the district has adequate bulk water supply infrastructure but the
42
challenge is accessing sources of water and reticulation. The high backlog in the RDP level
sanitation in the villages constitute a major risk in terms of ground water pollution. The majority
of citizens in the district have access to electricity which has an impact on the economic
development of the area. There is limited accessibility to most villages due to inadequate
access to roads and internal street networks. Most rural areas in the district do not have
access to waste removal services which poses a threat to both humans and the environment.
In the Mopani district, taxis form a high percentage of public transport and the bus facilities in
the district are limited to Tzaneen, Duiwelskloof, Giyani and Phalaborwa. Most of these bus
terminals are without adequate facilities (shelters, toilets, ticket sales points etc). There is also
minimal usage of railway operations as mode of public transport. Rail is used mainly as goods
carriers and is mainly found in the Greater Tzaneen, Greater Letaba and Ba-Phalaborwa
areas. There are a few airports in the district, namely, Hoedspruit and Siyandani Airports,
amongst others.
There is a need for further interaction with the sectors to be able to quantify the infrastructure
needs of the sectors to improve the economic performance of the district. This would entail
determining demand and supply of the requisite infrastructure and other support required.
There is a need to fast-track the provision of basic infrastructure to communities in a form of
water and sanitation, electricity, roads and waste management to create a conducive
environment for the community to thrive. There is a further need to revitalize agricultural
schemes along the perennial rivers that are currently abandoned so that they can contribute to
the main economy of the district.
4. Infrastructure Engineering
43
4.1. A Brief Outline of Infrastructure Challenges
Air pollution is a major environmental problem affecting most areas in the Mopani District.
Vehicles, mines and industries pollute the air by releasing harmful gasses, especially in urban
areas. In the villages, air pollution is caused by the burning of wood and coal to make fire
releasing carbon dioxide. Another source of air pollution is leakage of sewage and companies
burning their waste, causing bad odour.
Water pollution in the district affects most people as many of them stay in the rural areas and
depend on river water. The major cause of water pollution is the sewage leakage and release
of industrial waste into streams as well as illegal solid waste dumping along the river system.
44
The usage of herbicides and pesticides by farmers results in these chemicals finding their way
into rivers and, thus, increase the growth of algae and reduces oxygen levels in water. This
negatively affects natural plants and marine/aquatic life and the wellbeing of domestic and wild
animals. The lack of water-borne sewerage systems leads to the contamination of ground
water.
Deforestation is one of the identified major environmental problems affecting most areas in the
district. This is a problem affecting almost every forest or veld in the District. This problem is
caused by irresponsible traditional healers, wood carvers, firewood collectors, farmers and
villagers residing around deforestated areas. This can be attributed to poverty, lack of
knowledge, unemployment, unclear land policy, traditional practices and economic gains.
The Mopani area often experiences uncontrolled veld fires during winter. These fires have a
negative environmental and economic impact. The veld fires are also a threat to human and
animal life. The major cause of this problem is poaching, firewood collection, uncontrolled
burning for green bite, lack of knowledge about veld fire destruction, lightning and negligence.
There are numerous areas in the district that are subject to chemical spills and hazardous
accidents that have a detrimental impact on the lives of people. This occurs mainly near
industries and along major routes, polluting the air and ground.
Emerging Issues
45
There is a need to improve on Disaster and Risk Management, Fire and Rescue capacity of
the municipalities to can be able to manage and mitigate disasters. There is also a need to
maintaining the biodiversity of Mopani District Municipality as it is critical to agriculture and
rural development. Activities such as mining and changes in land-use that occur in the region
need to be carefully monitored.
The governance of Mopani District comprises of the following units (political and
administrative) as depicted in the sketch below:
46
MOPANI DISTRICT MUNICPALITY GOVERNANCE STRUCTURE
Council
Mayoral Committee
Portfolio, Portfolio, Portfolio, Portfolio, Portfolio, Economic Portfolio, Sport, Portfolio, Portfolio, Agriculture Portfolio Public
Infrastructure Finance Corporate & Health & Social Development, Housing Recreation, Arts Water & Environmental Transport &
Shared Services & Spatial planning & Culture Services Management Roads
Development Development
Po
Municipal Manager
47
Based on the information contained in the profile, there is general institutional stability
in the district and IGR structures, Council and its Committees are functional. Hereunder
is an indication of municipal structures involving communities and stakeholders in
matters of municipal governance.
Local Govt KPAs MDM Structures that involve members of communities in matters
of governance
The office of the Speaker is responsible for the following programmes and they are
budgeted for annually:
48
also hotline for the Executive Mayor to assist at any given time when members of
communities or anyone need his assistance.
Izimbizo: These are open public meetings for the communities to ventilate their
concerns to the Leadership for attention.
District Ward Committees forum (five representatives from each Local
Municipality)
Speakers’ forum.
Municipal Public Accounts Committee
Portfolio Heads (Councillors) are also responsible for different Clusters, e.g
Economic, Social & Infrastructure Gov. & Admin.
Public Participation
In terms of the above process (schedule of IDP meetings), it is apparent that public
participation had been entrenched full blast at the final phase of the process. The local
municipalities also held their IDP Representative Forum meetings whose outputs inform
the district IDP process. Local municipalities involved ward committees in conducting
ward surveys in the respective local municipalities. Public participation in respect of IDP
and Budget offered a good platform for the communities to add value to the final
commitment of the Council in the IDP approval phase. The District deployed MMCs to
all Local municipalities Public participation meetings to present District projects together
with Locals. The initiative assisted local communities in clarifying the programs of
government in one face.
49
INTER-GOVERNMENTAL RELATIONS
The relationship between the district municipality, the local municipalities and sector
departments in Mopani is improving. There are also inter-municipal structures (i.e.
District Intergovernmental Forum, District IDP Engagement forum, Speakers’ Forum
and District Managers’ Forum) that discuss and resolve on issues cutting across all
municipalities and sector departments.
There are, however, grey areas on how the hierarchical inter-municipal and inter-
governmental structures should cross feed into each other’s programmes and be
measured in terms of performance. For example, it is still a challenge for MDM to hold
any sector department accountable for the non-implementation of projects which are
included in the IDP document.
One of the Objectives of Local Government captured in section 152 of the Constitution
is to encourage the involvement of communities and community organizations in
matters of local government. The White paper on local government provides that
municipalities should be working with citizens and groups within a community to find
sustainable ways to meet their economic, social and material needs and improve the
quality of their lives. Therefore municipalities use a number of ways and systems to
involve communities and improve governance.
50
Over and above the formal structure of MDM, the following are in place:
Audit committee to track performance and advise Council. For several years the
Auditor General had not expressed his opinion on the financial statements
received unqualified audit reports from Auditor General. The 2010/11 shows
Risk Management Strategy in place: the unit is not adequately staffed since there
HR policies are in place and most of them are addressing labour issues.
51
District Managers’ forum: Municipal Managers of District and Local municipalities,
Disaster Management unit that is linked to the office of the Municipal Manager for
Institutional Challenges
The Function of Air Quality has been the responsibility of the District Municipalities since
year 2010. Todate the District is having one incumbent for the air quality responsibility.
Challenges obviously overweigh the resources.
The MDM has not yet embraced the Airport function ‘though it is the District Power &
function. So, there is no unit created to carry out this function yet. There is also budgetary
allocations from National Treasury that tend to scale down budget against a number of
functions that are still expected of district municipality to carryout, e.g roads.
Office space is one limiting factor on appointing units that are office-bound. There is only
one block in the former Gazankulu parliamentary complex that is fully full. Some of the
Units like, Internal Audit and GIS are accommodated at the Disaster Management centre
in Tzaneen to lessen the pressure on office space. Conversely that still put pressure on
this specialised facility.
Mopani has 11 disabled out of 633 employees, which is 1,7% of the current workforce.
MDM is thus below 2% threshold required of the staff complement being disabled
persons. Greater Letaba and Greater Giyani are also still below threshold with 1% and
0% respectively. Maruleng and Ba-Phalaborwa are ahead at 4,2% and 4,5% in this
aspect of equity.
52
MDM has placed over 500 staff members transferred from DWS. The challenge is that
majority of them do not have requisite qualifications to take responsible tasks.
Municipality continues to be in dire need for qualified technicians for engineering services
while operational cost to MDM has risen to 35%, affecting negatively on budget for
service delivery projects.
MDM do not have full spread of racial diversities. There are largely Bapedi, Ba-tsonga,
Ba-Venda and some very few Afrikaans. This is informed proportionally by the racial
spread of the District. There are also those cases of people who would prefer to work in
urban environment rather than rural area (Giyani) where Mopani District Head office is
located. Currently almost all senior managers commute from Tzaneen to Giyani for work.
Office of the IDP needs HR capacity strengthening in order to execute the responsibility
with the necessary authority within the MM’s office.
There are still units that are placed in different directorates from their allocated budget,
e.g HIV and AIDS unit is in the Office of Executive Mayor while budget is in Community
services` directorate. Alignment need to be considered in this respect.
Challenges Proposed Interventions
Inadequate participation of community representatives To conduct community survey.
and stakeholders in IDP meetings Assess and implement the community Survey.
Programmes/ projects implementation reporting is Make use of quarterly Mayoral Imbizos to report
not shared with communities. progress on implementation of projects.
Lack of Shared vision Marketing of the Vision be made at administrative level.
All meeting Agenda must have foot note of Vision.
Community protests Identify and address communities with critical shortage
of water and other services.
Maintain continual feedback meetings with Communities.
Lack of implementation on issues raised by Strengthen IGR (Technical committees) structures in all
communities by sector departments levels
Poor integration of plans between municipalities and Map the Technical committee meetings in line with the
sector departments. IDP process
Non implementation of projects Comply with MBRR on limits set for shifts in adjustment
budget process. This be approved by Council.
Non-adherence to IDP Process plan Ensure the IDP Process plan guides all other plans in the
institution. Ensure that discussion documents are compiled
timeously & submitted to IDP unit. Report to superiors for
corrective action
Involvement of Royal Leaders in Council activities in CoGHSTA and Executive Mayor to monitor progress and
some Municipalities. address the matter at different platforms.
53
6.2. Immediate Intergovernmental Institutional Stabilisation and Strengthening
Actions
IDP be a tool of governance in municipal space.
54
MOPANI DISTRICT MUNICIPALITY
Index
55
5.4.1 KPA: GOOD GOVERNANCE AND PUBLIC PARTICIPATION
58
Parliament parliament Municipality
2. Children`s rights day Advocacy MDM N/A Annual Children’s right day Mopani District 60 000 62 520 65 271 200
Municipality
3. Children`s advisory Advocacy MDM N/A Annual children’s advisory Mopani District 0 0 0 380
council council Municipality
4. Youth Advisory Council Awareness MDM N/A # of youth advisory councils Mopani District 100 000 104 200 108 785 500
held. Municipality
5. Youth council assembly Awareness MDM N/A Annual youth council Mopani District 300 000 312 600 326 354 670
assembly Municipality
6. Youth Month Advocacy MDM N/A # youth activities held. Mopani District 300 000 312 600 326 354 380
Municipality
7. Youth career Expo Awareness MDM N/A # of youth career Expo held Mopani District 400 000 416 800 435 139 480
Municipality
8. Youth economic indaba Youth empowerment MDM N/A Annual youth economic Mopani District 0 0 0 400
indaba Municipality
9. Youth Bursaries Youth support MDM N/A # of students awarded the Mopani District 33
bursary Municipality 2 400 000 2 500 800 2 610 835
Project Name Project Project Baseline Annual Annua Medium Term Expenditure Implementi
Description Location Performance l Framework ng Agent
Indicator Target
2021/202 2022/202 2023/202
2 3 4
External Auditing by the Municipalit Unqualifie Number of 1 5,000,000 5,210,00 5,439,24 MLM
auditing office of Auditor- improved audit
59
General y d opinion 0 0
Internal auditing Audit plans & Municipality 4 Number of quarterly 4 100,000 1,042,00 1,087,84 MLM
programmes internal audit reports 0 8
with
recommendations
generated
Risk Risk management Municipality Risk Based Number of Risk 1 OPEX OPEX OPEX MLM
Management plans Internal Plan Based Internal Plan
approved
Fraud and Minimization of Municipality 0 Number of fraud and All OPEX OPEX OPEX MLM
corruption corrupt activities corruption cases reporte
investigated d cases
Project Name Project Project Baselin Annual Performance Annua Medium Term Expenditure Implementi
Description Location e Indicator l Framework ng Agent
Target
2021/202 2022/202 2023/202
2 3 4
Council Functionality of Municipali 8 Number of Council sitting 4 OPEX OPEX OPEX MLM
function & Council ty supported
support structures
Complaints Promote Municipali 100% % of complaints resolved 100% OPEX OPEX OPEX MLM
management accountability ty
Project Name Project Project Baseline Annual Performance Annua Medium Term Expenditure Implementin
Description Location Indicator l Framework g Agent
Target
2021/20 2022/20 2023/2024
22 23
Communicatio Review of the Municipali 2020/21 Number of 1 60,000 62,520 65,270.88 MLM
n strategy ty Communication strategy
Communicatio
reviewed
n Strategy
Traditional Allowance given Municipali 4 Number of traditional 4 12,000 12,504 13,054.18 MLM
61
Leaders to Traditional ty leaders receiving
Allowance Leaders allowance
attending council
meetings
Project Project Project Baselin Annual Performance Annu Medium Term Expenditure Implementin
Name Description Location e indicator al Framework g Agent
Target
2021/202 2022/2023 2023/2024
2
Public Mayoral public Municipalit 12 Number of Mayoral 4 650,000 685,100 722,780 MLM
Participation participation y public participation
meetings meetings held
INTERNAL AUDIT
Project Project Name Project Project Duration Five (5) Year Budget Source of Implementation
No. and Location Description Funding Agent
Start Finish 2021/22 2022/23 2023/24 2024/25 2025/26
Date Date
MM-109 Internal Audit Purchase of 01/07/2024 30/06/2025 R600 000 Own GTM
system Internal Audit
62
Project Project Name Project Project Duration Five (5) Year Budget Source of Implementation
No. and Location Description Funding Agent
system
63
STRATEGIC OBJECTIVE: To develop governance structures and systems that will ensure effective public
consultation and organizational discipline.
PROJECT/PROGRAM 2021 /22 2022/23 2023/24 2024/25 2025/26 SOURCE
1. IDP Review(expenses) R600,000 R605,000 R610,000 0 0 GGM
2. Public meetings and Campaigns R400,000 R210 000 R220,000 0 0 GGM
3. Audit R200,000 R0 R0 0 0 GGM
4. Events management R50,000 R60,000 R70,000 0 0 GGM
5. MPAC R216,000 R257,000 R298,000 0 0 GGM
6. PMS programme R130,000 R130,000 R130,000 0 0 GGM
7. Remuneration of ward committee’s R5,9,000 R5,900,000 R6,000,000 0 0 GGM
8. Audit committee fees R896,000 R934,000 R973,000 0 0 GGM
5.4.1.6 Ba-Phalaborwa Municipality: Governance
Project Project Cost Fund Project Cost Funding Project Cost Funding Project Project
No. ing
(R’000) (R’000) (R’000)
Good IDP Review Strategic Planning and 500 Own Strategic Planning and 700 Own Strategic Planning 800 Own
corporate stakeholder stakeholder engagement and stakeholder
governanc engagement engagement
e and
Risk Risk Management 110 Own Risk Management 115 Own Risk Management 120 Own Risk Management Risk Manageme
public
management Committee fees Committee Meetings Committee Meetings Committee fees Committee fee
participati
on Insurance Provision of Short- 1 950 Own Provision of Short- 1 950 Own Provision of Short- 2 000 Own Provision of Short-term Provision of Shor
term insurance term insurance term insurance insurance term insurance
Project Project Cost Fund Project Cost Funding Project Cost Funding Project Project
No. ing
(R’000) (R’000) (R’000)
Security Provision of security 14 650 Own Provision of security 15 250 000 Own Provision of security 16 012 500 Own Provision of security Provision of
management services 000 services services services security service
Internal Audit Audit Committee 950 Own 1000 000 Own 1100000 Own Audit Committee Fees 1200 000
Specialised Audits 850 Own Specialised Audits R900 000 Specialised Audits R1000 000 Specialised Audits 1000 000
Office of the
Speaker
65
Cluster Sector / KPA Operations and Maintenance Projects
Project Project Cost Fund Project Cost Funding Project Cost Funding Project Project
No. ing
(R’000) (R’000) (R’000)
MPAC Strategic Planning session 400 Strategic Planning 450 Strategic Planning 500 Strategic Planning 500
& working sessions session& working session & working session & working
sessions sessions sessions
Total 21 970
66
5.4.2 KPA: TRANSFORMATION AND ORGANISATIONAL DEVELOPMENT
5.4.2.1 Mopani District Municipality
Corporate services
N Project Project Description Local Location Performance Implementing Budget Cost Estim
o name Municipality indicator Agent/ Funder
Ward/Village Coordinates 2021/22 2022/23 2023/24 2024/25 2025
Latitude Longitude
1 IDP Facilitation & Mopani Dist.District- N/A N/A Approved reviewed Mopani District 720 000 750 250 783 251 900 000 1 00
Review development of IDP Municipality wide IDP document. Municipality
document.
2 External Assessment of Internal Mopani N/A N/A N/A External Mopani District 950 000 989 900 1 033 456 0
Assessme Audit Activity by a District Assessment Report Municipality
nt Activity qualified external Municipality
quality assessor
3 Audit Logistics for Audit Mopani Dist N/A N/A N/A Number of Audit Own/ES 2 200 000 2 292 400 2 393 266
committee Sittings Municipality committee
meetings
Committee
4 District Coordination of MDM N/A N/A N/A Shared Own/ES 20 540 21 403 22 344 0
Internal information
audits
70
Auditors
forum
MDM: PMS
1 Electronic Electronic MDM District- N/A N/A Approval of Mopani District 900 000 1 00
Performance Performance System wide quarterly reports Municipality 000
Management System 900 000 937 800 979 063
2 Employees Payment of MDM District- N/A N/A # Individual Mopani District 1 500 1 563 1 631 772 5 000 000 5 50
Performance Bonuses performance bonuses wide Performance Municipality 000 000 000
for employees Assessments
conducted
3 Annual report Printing of the annual MDM District- N/A N/A Submission of Mopani District 100 000 104 200 108 785 350 000 400
Booklets report into booklets wide Annual Report Municipality
MDM: LEGAL
No Project name Description Location Performance Indicator Funder 2021/22 2022/23 2023/24 2024/25 2025
1 Legal Expenses Provision of legal services MDM Legal support to the municipality MDM 10 000 000 10 420 000 10 878 480 0 0
2 By laws Review and gazetting of By laws MDM Compliance and support to the MDM 1 000 000 1 042 000 1 087 848 0 0
municipality
MDM: RISK
No Project name Project Description Location Target to achieve Funder Budget Cost Estimat
1 Anti-corruption Forum for ensuring good ethical Municipal employees Municipal employees Own ES 0 0 0 250 000 250 00
71
conduct. & councilors. and Councilors
2 Physical Security Provision of security services in all All Locals Safety of employees, Own/ES 34 000 000 35 428 000 36 986 832 44 000 000 46 280
guards for MDM MDM premises /areas: Water secured assets against
assets & schemes, fire stations, satellite theft and vandalism.
employees. offices, head office, Disaster center.
5.4.2.2 BA-PHALABORWA
Project Project Cost Fund Project Cost Funding Project Cost Funding Project Project
No. ing
(R’000) (R’000) (R’000)
Upgrading of ICT Infrastructure (Cabling 1 500 Own Upgrading OF ICT 2 000 Own
, Computers , Switches , Infrastructure Funding
Subscription and Licences 2 000 Own Subscription and Licences 2 000 BPM
Total 3 700
72
5.4.2.3 GREATER LETABA MUNICIPALITY
73
IT Master plan R400,000 R0 R0 0 0 GGM
Specialised computer services R2,8 M R2,9M R3M 0 0 GGM
Disaster recovery plan and site R300,000 R0 R0 R0 R0 GGM
Legal advise and Litigations R5,000,000 R5,000,000 R5,200,000 0 0 GGM
E mail archiving R300 000 R0 R0 0 0 GGM
Compensation commission R1,300,000 R1,300,000 R1,300,000 0 0 GGM
Automated audit System R1,170,000 R0 R0 R0 R0 GGM
Business continuity plan R300,000 R0 R0 R0 R0 GGM
INFORMATION TECHNOLOGY
Project Project Name and Project Description Project Duration Five (5) Year Budget Source of Implementation
No. Location Funding Agent
Start Finish 2021/22 2022/23 2023/24 2024/25 2025/26
Date Date
CSD- Speed measuring Purchase of speed 01/07/2021 30/06/2022 R500 000 Own GTM
112 instrument measuring instrument
CSD- Computers for traffic Purchase of 01/07/2021 30/06/2022 R60 000 Own GTM
113 administration Computers for
traffic administration
CSD- Printers for traffic Purchase of 01/07/2021 30/06/2022 R15 000 Own GTM
114 administration Printers for traffic
administration
CSD- Traffic light Purchase of traffic 01/07/2021 30/06/2022 R500 000 Own GTM
115 controllers for law light controllers for
enforcement red traffic light
74
Project Project Name and Project Description Project Duration Five (5) Year Budget Source of Implementation
No. Location Funding Agent
administration offenders
CSD- Electronic National Purchase of 01/07/2021 30/06/2022 R250 000 Own GTM
116 and Traffic and ENaTIS terminal
Information System and equipment
terminal and
equipment
GTEDA
GTEDA MSCOA printers Purchase of MSCOA 01/07/2023 30/06/2024 R258 50 R235 000 OWN GTM
-117 Equipment printers Equipment 0
Project Name Project Project Baseline Annual Annual Medium Term Expenditure Implementi
Description Locatio Performance Target ng Agent
n Indicator 2021/202 2022/202 2023/202
2 3 4
IDP Review IDP Review MLM IDP/Budget IDP/budget adopted byAdopted by 217,569.6 MLM
process Adopted by Council by 31 May Council by 200,000 208,400 0
Council 29 May 31 May
75
2020 2021 2021
IDP/PMS IDP strategies MLM 1 Number of strategic 1 350,000 364,700 380,746,8 MLM
strategic review planning session held 0
planning session
Policy Review and MLM 15 policies & 2 Number of policies & 15 OPEX OPEX OPEX MLM
development, development by-laws by-laws developed/ policies &
by-laws & of Council Reviewed 2 by-laws
reviews policies and
review
Project Project Project Baselin Annual Annu Medium Term Expenditure Framework Implementi
Name Descriptio Location e Performance al ng Agent
n Indicator Target 2021/2022 2022/2023 2023/2024
76
Agreement
Labour Sound labour Municipalit 4 Number of Local 4 OPEX OPEX OPEX MLM
Forum relations y Labour Forum
meetings held
Payroll Management Municipalit 100% % accuracy on 100% 103,251,210. 109,194,651. 115,657,671. MLM
Managemen of salaries y payroll information 05 54 81
t and benefits
of councilors
and staff
Overtime Management Municipalit 100% % compliance to 100% 3,218,747.42 3,402,216.02 3,602,946.77 MLM
Managemen of overtime y overtime
t of employees management
required to
work
overtime
Project Project Project Baselin Annual Performance Indicator Annu Medium Term Expenditure Implementi
Name Description Locatio e al Framework ng Agent
n Target
2021/202 2022/202 2023/202
2 3 4
Employmen Compliance to MLM 3 Number of people from EE 2 OPEX OPEX OPEX MLM
77
t Equity EEP targeted employed in the three
highest levels of the municipality
Policy Development and MLM 1 Number of policy workshops 1 300,000 312,600 326,354. MLM
workshop review of held 4
municipal
policies
Project Name Project Project Baselin Annual Performance Annua Medium Term Expenditure Implementin
Description Location e Indicator l Framework g Agent
Target
2021/202 2022/202 2023/202
2 3 4
Disaster Risk Awareness Municipalit 12 Number of awareness 4 MLM
Management campaigns on y campaigns on disaster
(DRM) awareness disaster risks risks management held
campaigns &
management 500,000 521,000 543,924
DRM strategic Strategic Municipalit 1 Number DRM strategic 1 MLM
planning session planning y planning session held
session on
DRM
Review of the DRM Plan Municipalit 2018/19 Number of Disaster Risk 1 OPEX OPEX OPEX MLM
78
DRM Plan review y DRM Plan Management plan
reviewed
Review of District
Review of the District
Integrated Mopani Dist.
1 Integrated Transport District-wide NA NA Reviewed ITP MDM 1 200 000 1 250 4001305 418 0
Transport Plan Municipality
Plan
(DITP)
79
Repair and
Mopani Dist. Operational
3 Vehicles (Graders) maintenance of District-wide NA NA MDM 1 300 000 1 354 600 1 414 202 0
Municipality Graders
graders
NB: The above projects (1 – 7) will not need Environmental Impact Assessment
No Project name Project EIA Local Location Performance Implementin Budget Cost Estima
80
needed
g Agent/
Description Municipality Ward/ Coordinates indicator
Funder 2021/22 2022/23 2023/24 2024/25 202
Village Lat Long
Construction of No 0 0 0
Kampersus Water water reticulation Kampersrus, N/A Installed Water
1 Maruleng N/A MIG 20mil 20
Reticulation pipeline including Scortia Reticulation pipes
yard connections
Water Reticulation No
Construction of N/A
Infrastructure for Middle Greater Hlaneki, Bode, Installed Water 41 606
2 water reticulation N/A MIG 15 000 000 0 0
Letaba Water Scheme Giyani Maswanganyi Reticulation pipes 589
network
Cluster 6
Construction of No N/A
Lulekani Water Scheme Ba- Lulekani, Installed Water 50 000 87 350
3 water reticulation N/A MIG 40 000 000 0
(Benfarm) Phalaborwa Benfarm Reticulation pipes 000 665
network
7 Rural Household Construction of No Maruleng Greater N/A N/A Constructed VIP MIG 20 065 667 0 0 25 000 25
Sanitation (Greater Giyani VIP toilets Giyani toilets 000 0
81
LM)
No Increased number
Rural Household N/A of households with
Construction of Ba- Ba- 18 971 25 000 25
8 Sanitation (Ba- N/A access to 15 MIG 20 000 000 0
VIP toilets Phalaborwa Phalaborwa 369 000 0
Phalaborwa LM) sanitation
Infrastructure
Construction of No N/A
Greater Ritavi, Muhlava Installed Water 60 000 125 867 18 414
9 Ritavhi 2 Water Scheme water reticulation N/A MIG 40 000 000
Tzaneen Cross Reticulation pipes 000 851 720
network
Construction of No N/A
Thabina to Lenyenye Bulk Greater Thabina, Installed Water 60 000 80 499 17 676
10 water reticulation N/A MIG 40 000 000
Water Supply Tzaneen Lenyenye Reticulation pipes 000 848 634
network
Construction of No N/A
Greater Installed Water 60 000 124 533
11 Sekgosese Water Scheme water reticulation Sekgosese N/A MIG 40 000 000 0
Letaba Reticulation pipes 000 750
network
No
Makushane Water Construction of water Ba- Installed Water 60 000 66 646
12 Makhushane N/A N/A MIG 40 000 000 0
Scheme reticulation network Phalaborwa Reticulation pipes 000 232 0
13 Lephephane Bulk Water Construction of No Greater Lephephane N/A N/A Installed Water MIG 30 144 706 50 000 36 922 8 166 9160
water reticulation
82
Tzaneen
network Reticulation pipes 000 404
No
Construction of
Greater Installed Water 53 981
14 Tours water reticulation water reticulation Tours N/A N/A MIG 44 004 000 0 0
Tzaneen Reticulation pipes 403
network
No
Construction of bulk Hoedspruit,
Hoedspruit Bulk Water Installed Water
15 water supply line and Maruleng SANDF base, N/A N/A MIG 15 904 901 0 0 0
Scheme Reticulation pipes
storage facilities Drakensig
No
Construction of
Thapane Regional Water Greater Installed Water
16 water reticulation Thapane N/A N/A MIG 23 754 995 0 0 0
Scheme Tzaneen Reticulation pipes
network
Construction of bulk No
Tours water scheme ,
water supply pipeline Greater Installed Water
17 bulk lines refurbishment Tours N/A N/A MIG 3 216 755 0 0 0
including storage Tzaneen Reticulation pipes
and reticulation
facilities
Construction of Sefofotse,
Sefofotse to Ditshosini bulk Greater Bulk pipeline
19 bulk water Ditshosini, N/A N/A MIG 14 270 862 0 0 0
water supply (Ramahlatsi) No Letaba installed
pipeline Ramahlatse
20 Giyani Water Scheme Construction of Yes Greater Dzingidzingi N/A Installed Water WSIG 0 0 0 20,000 0
83
water reticulation
Pipeline A and B pipeline including Giyani N/A Reticulation pipes 000
stand pipes
Yes 0 0 0
Construction of
Giyani Water Scheme Greater Installed Water
21 water reticulation Mapuve N/A N/A WSIG 0,00 0
Pipeline C&D Giyani Reticulation pipes
pipeline
Yes 0 0 0
Construction of
Lower Molototsi Water Greater Installed Water
22 water reticulation Dzumeri N/A N/A WSIG 0,00 0
Scheme Tzaneen Reticulation pipes
pipeline
Yes 0 0 0
Construction of
Greater Installed Water
23 Modjadji Water Scheme water reticulation Kubjana N/A N/A WSIG 0,00 0
Tzaneen Reticulation pipes
pipeline
Yes 0 0 0
Construction of
Greater Installed Water
24 Modjadji Water Scheme water reticulation Iketleng N/A N/A WSIG 0,00 0
Tzaneen Reticulation pipes
pipeline
Yes 0 0 0
Construction of
Mametja-Skororo Installed Water
25 water reticulation Maruleng Metz N/A N/A WSIG 0,00 0
Scheme Reticulation pipes
pipeline
26 Ritavi 1 Scheme Construction of Yes Greater Mabjebilong N/A Installed Water WSIG 0 0 0 0,00
water reticulation Tzaneen Reticulation pipes
N/A
pipeline
84
EIA
Location Budget Cost Est
needed Implementi
Project Local Performance
Project name ng Agent/
Description Municipality Coordinates indicator
Ward/Village Funder 2021/22 2022/23 2023/24 2024/25 2025
Lat Long
Yes 0 0 0
Construction of
Lulekani/ Namakgale Ba- Installed Water 2 500 5 0
27 water reticulation Namakgale N/A N/A WSIG
Water Scheme Phalaborwa Reticulation pipes 000 000
pipeline
Yes 0 0 0
Construction of
Lulekani/Namakgale Ba- Installed Water 2 500 5 0
28 water reticulation Lulekani N/A N/A WSIG
Water Scheme Phalaborwa Reticulation pipes 000 000
pipeline
Yes 0 0 0
Construction of
Greater Installed Water 2 500 5 0
29 Giyani Pipeline C & D water reticulation Mageva N/A N/A WSIG
Giyani Reticulation pipes 000 000
pipeline
Yes 0 0 0 5
Construction of
Greater Installed Water 2 500 0
30 Giyani Pipeline C & D water reticulation Makhuva N/A N/A WSIG
Giyani Reticulation pipes 000
pipeline
Yes 0 0 0 5 0
Construction of
Greater Installed Water 2 500
31 Giyani Pipeline C & D water reticulation Zava N/A N/A WSIG
Giyani Reticulation pipes 000
pipeline
85
Yes 0 0 0 5 0
Construction of
Greater Installed Water 2 500
32 Modjadji Scheme water reticulation Mokwasela N/A N/A WSIG
Letaba Reticulation pipes 000
pipeline
Yes 0 0 0 5 0
Refurbishment of
Lulekani/Namakgale Ba- Installed Water 2 500
33 the water Mapikiri N/A N/A WSIG
Water Scheme Phalaborwa Reticulation pipes 000
storage facility
Yes 0 0 0 5
Construction of 0
Greater Makhubidun Installed Water 2 500
34 Tours Water Scheme water reticulation N/A N/A WSIG
Tzaneen g Reticulation pipes 000
pipeline
Yes 0 0 0 5
Construction of 0
Ba- Tshelang Installed Water 2 500
35 Namakgale Sewer System water reticulation N/A N/A WSIG
Phalaborwa Gape Reticulation pipes 000
pipeline
Yes 0 0 0 5
Construction of 0
Middle Letaba Water Greater Makgakgapa Installed Water 2 500
36 water reticulation N/A N/A WSIG
Bolobedu NW Letaba tse Reticulation pipes 000
pipeline
Yes 0 0 0 5
Construction of 0
Greater Installed Water 2 500
37 Giyani RWS Scheme water reticulation Giyani N/A N/A WSIG
Giyani Reticulation pipes 000
pipeline
38 RItavi I RWS Construction of Yes Greater Mariveni N/A Installed Water WSIG 0 0 0 2 500 5
water reticulation Tzaneen Reticulation pipes 000 0
pipeline
86
N/A
Yes 0 0 0 5 0
Construction of
Greater Installed Water 2 500 0
39 Giyani Pipeline C & D water reticulation Makosha N/A N/A WSIG
Giyani Reticulation pipes 000
pipeline
Yes 0 0 0 5 0
Construction of 0
Greater Installed Water
40 RItavi II RWS water reticulation Lenyenye N/A N/A WSIG 2 500 000
Tzaneen Reticulation pipes
pipeline
Yes 0 0 0 5 0
Construction of VIP Toilets 0
Construction of VIP Ba- Matikoxikaya, Constructed VIP
41 in Ba-Phalaborwa Local N/A N/A WSIG 2 500 000
toilets Phalaborwa Bernfarm. toilets
Municipality
Yes 0 0 0 3 500 3
Construction of VIP Toilets
000 000
Construction of VIP Molalane, Constructed VIP
42 in Maruleng Local Maruleng N/A WSIG
toilets Finale. N/A toilets
Municipality
43 Upgrading of the Bulk Construction of Yes Greater Thabina N/A Installed Water WSIG 0 0 0 10 000 0
87
bulk water supply N/A
pipeline Tzaneen Reticulation pipes 000
pipeline
Yes 0 0 0
Construction of
Nhlaniki Upgrading Of Greater Installed Water 43 000
46 water reticulation Nhlaniki N/A N/A WSIG 0
Water Reticulation Tzaneen Reticulation pipes 000
pipeline
Yes 0 0 0
Construction of
Ramaroka Village Bulk Greater Installed Water 23 000
47 water reticulation Ramaroka N/A N/A WSIG 0
Water Supply Upgrade Letaba Reticulation pipes 000
pipeline
Yes
Refurbishment of Kgapane Refurbishment of
Greater Installed Water 8 000
48 Waste Water Treatment the water Kgapane N/A N/A WSIG 2 000 000 0,00 0,00 0
Letaba Reticulation pipes 000
Plant treatment plant
49 Refurbishment of Refurbishment of Yes Greater Nkambako N/A Installed Water WSIG 0 0 0 3 200 2 0
Nkambako Water the water Tzaneen Reticulation pipes 000
N/A
88
Treatment Plant treatment plant
Yes 0 0 0
Refurbishment of Middle Refurbishment of
Greater Installed Water 5 000
50 Letaba Water Treatment the water Middle LetabaN/A N/A WSIG 4 5
Giyani Reticulation pipes 000
Plant treatment plant
Yes
Refurbishment of Refurbishment of
Ba- Installed Water
51 Namakgale Water the water Namakgale N/A N/A WSIG 5 000 000 0 0 0,00 0
Phalaborwa Reticulation pipes
Treatment treatment plant
Yes
Construction of
Eco Park (Xikukwane) Water Greater Installed Water
52 water reticulation Xikukwane N/A N/A WSIG 4 629 550 0 0 0,00 0
Reticulation Giyani Reticulation pipes
pipeline
Yes 0 0 0
Construction of
Ngove Water Supply & Greater Installed Water 12 000 33 0
53 water reticulation Ngove N/A N/A WSIG
Reticulation Giyani Reticulation pipes 000 000
pipeline
Yes
Construction of
Santeng Source Installed Water 10 000
55 water reticulation Maruleng Santeng N/A N/A WSIG 0 0 0 3 00
Development Reticulation pipes 000
pipeline
89
No
Construction of 4 Operator Construction of Safe residential
Ba- 12 000 33
56 Houses at Nondweni water reticulation Nondweni N/A N/A accommodation at WSIG 0 0 0
Phalaborwa 000 0
Treatment Plant pipeline the plant
EIA
Location Budget Cost Esti
needed Implementin
Local Performance
Project name Project Description g Agent/
Municipality Coordinates indicator
Ward/Village Funder 2021/22 2022/23 2023/24 2024/252025
Lat Long
Yes
Construction of
Bolobedu Moshate Water Greater Installed Water 25 000 17 023
57 water reticulation Bolobedu N/A N/A WSIG 5 000 000 0,00 0
Supply Letaba Reticulation pipes 000 732
pipeline
Yes 0 0 0
Construction of
Giyani Water Treatment Greater Installed Water 10 000
58 water reticulation Giyani N/A N/A WSIG 0
Plant Giyani Reticulation pipes 000
pipeline
Yes 0 0 0
Construction of
Nkowankowa Water Works Greater Installed Water 10 000
59 water reticulation Nkowankowa N/A N/A WSIG 0
Upgrading Tzaneen Reticulation pipes 000
pipeline
90
Maselapata Refurbishment, Yes 0 0 0
Construction of
Replacement & upgrading Greater Installed Water 25 000 20
61 water reticulation Maselapata N/A N/A WSIG
of Internal Water Letaba Reticulation pipes 000 0
pipeline
Reticulation network
Yes 0 0 0
Construction of
Refurbishment of Thapane Greater Installed Water 25 000
62 water reticulation Thapane N/A N/A WSIG 20 00
Water Treatment Plant Tzaneen Reticulation pipes 000
pipeline
Replacement and
upgrading Construction of
Installed Water 25 000 20
63 water reticulation Maruleng Hlohlokwe N/A N/A WSIG
of Internal Water Reticulation pipes 000 0
pipeline
Reticulation
network
Mediengeng Yes 0 0 0
Refurbishment,
Construction of
rehabilitation and Greater Installed Water 25 000 20
64 water reticulation Mediengeng N/A N/A WSIG
upgrading Letaba Reticulation pipes 000 0
pipeline
of internal water
reticulation
No Improved 0 0 0
Construction of
Installation of bulk water Municipal accountability for 10 000
65 water reticulation Mopani N/A N/A WSIG 6 00
meters in Reservoirs wide water distribution 000
pipeline
and losses
91
Yes 0 0 0
Construction of
Ba- Installed Water 145 000
66 Selwane Water Scheme water reticulation Selwane N/A N/A WSIG 0
Phalaborwa Reticulation pipes 000
pipeline
Yes 0 0 0
Construction of
Giyani Water Scheme Greater Installed Water 10 000
67 water reticulation Bode N/A N/A WSIG 0
Pipeline A and B Giyani Reticulation pipes 000
pipeline
Yes 0 0 0
Construction of
Greater Installed Water 5 000
68 Xikhumba Water Supply water reticulation Xikhumba N/A N/A WSIG 0
Giyani Reticulation pipes 000
pipeline
Yes 0 0 0
Construction of
Noblehoek Booster Greater Installed Water 3 500
69 water reticulation Noblehoek N/A N/A WSIG 0
Pump station Giyani Reticulation pipes 000
pipeline
Yes 0 0 0
Construction of
Vaalwater water Greater Installed Water 10 000
70 water reticulation Vaalwater N/A N/A WSIG 0
reticulation Giyani Reticulation pipes 000
pipeline
71 Nkomo Upgrading of Construction of Yes Greater Nkomo N/A Installed Water WSIG 0 0 0 10 000 0
Wate Reticulation water reticulation Giyani Reticulation pipes 000
92
N/A
pipeline
Yes 0 0 0
Construction of
Homu Upgrading of Greater Installed Water 5 000
72 water reticulation Homu N/A N/A WSIG 0
Water Reticulation Giyani Reticulation pipes 000
pipeline
Yes 0 0 0 0
Construction of
Uprading of Water Installed Water 10 000
74 water reticulation Maruleng Maruleng N/A N/A WSIG
Reticulation in Maruleng Reticulation pipes 000
pipeline
Yes 0 0 0
Construction of
Shawela Water Greater Installed Water 10 000
75 water reticulation Shawela N/A N/A WSIG 0
Reticulation Giyani Reticulation pipes 000
pipeline
Yes 0 0 0
Construction of
Sekhunyani Water Greater Installed Water 8 000
76 water reticulation Sekhunyani N/A N/A WSIG 0
Reticulation Giyani Reticulation pipes 000
pipeline
77 Energy Saving Plan Review and No Mopani Institutiona N/A Reviewed energy Equitabl 200 000 208 217 90 000 100
Approve Energy l Plan plan e shares 400 570
N/A
Saving Plan
93
No 0 0 0
Uninterrupted Power Energy back-up To cover all Installed Equitabl 12 500 15
78 Mopani N/A N/A
supply at various plants system LMs generators e shares 000 0
Conduct a study No
on the following Institutional
energy sources: Plan for
Exploration of Boreholes Report on
Wind energy Equitable 72 1 500 1
79 renewable energy Mopani and Offices, N/A N/A renewable energy 69 856 75 993
shares 790 000 0
source Hydro -electricity Fire stations plan
and Water
Methane/WWTW
Infrastructure
Solar energy
No Equitable
Development of Share
Development of Water To cover all 700
80 Water Services Mopani N/A N/A WSDP (Awaiting 0 0 0
Services Development Plan LMs 000
Development Plan funding from
DBSA)
81 Development of Water Development of No Mopani To cover all N/A N/A WSPs Equitable 0 0 0 650
Safety Plan Water Safety Plan LMs Share 000
94
(Awaiting
funding
from DBSA)
Development of No Equitable
Water Demand and Share
Development of Water Water Demand and
To cover all conservation 300
82 Demand and conservation conservation Mopani N/A N/A (Awaiting 1 500 000 0 0
LMs Management 000
Management Strategy Management funding
Strategy
Strategy from DBSA)
No Equitable
Development of
Share
Development of the Water the Water and To cover all Water and Sanitation 500
83 Mopani N/A N/A (Awaiting 0 0 0
and Sanitation Master Plan Sanitation Master LMs Master Plan 000
funding
Plan
from DBSA)
No Equitable
Alignment of the
Alignment of the Water Share
Water Master Plan To cover all Water and Sanitation 500
84 Master Plan with the Mopani N/A N/A (Awaiting 0 0 0 30
with the Provincial LMs Master Plan 000
Provincial Master Plan funding
Master Plan
from DBSA)
No Equitable
Development of
Share
Development of the Waste the Waste Water To cover all Waste Water Risk
85 Mopani N/A N/A (Awaiting 750 000 0 0 0
Water Risk Abatement Plan Risk Abatement LMs Abatement Plan
funding
Plan
from DBSA)
86 Functionality Assessment Functionality No Mopani To cover all N/A N/A Report on Equitable 0 0 0 250
and Infrastructure Audit Assessment and LMs Infrastructure Share 000
Infrastructure functionality
95
Audit assessment
No Improved
Installation of Bulk Water Installation of Bulk To cover all accountability for Equitable 20 640
87 Mopani N/A N/A 20 000 000 21 756 960 0,00
Meters Water Meters LMs water production, Share 000
distribution and loss
EIA
Location Budget Cost Estimate
needed Implementi
Local Performance
Project name Project Description ng Agent/
Municipality Coordinates indicator Funder
Ward/Village 2021/22 2022/232023/24
2024/25 202
Lat Long
Full SANS 241 Water Full SANS 241 No To cover all SANS 241 Test Equitable
89 Mopani N/A 0 0 0 800 000 1 00
Quality Test Water Quality Test LMs N/A results Share
No Provision of safe
Bulk Purchasing of Bulk Purchasing of To cover all Equitable 41 680 43 513 21 000
90 Mopani N/A N/A potable water to 40 000 000 23 0
Chemicals Chemicals LMs Share 000 920 000
communities
No Continuous water
Bulk Purchasing of BoreholeBulk Purchasing of To cover all Equitable 31 260 32 635 36 000
91 Mopani N/A N/A supply to 30 000 000 33 0
Spares Borehole Spares LMs Share 000 440 000
communities.
92 Construction, Construction, No Mopani To cover all N/A N/A Safe residential Equitable 0 0 0 13 000 10 0
refurbishment and refurbishment and LMs accommodation for Share 000
upgrading of Operators upgrading of employees at the
96
houses Operators houses plant
Application for No
Application for
Accreditation of To cover all Proof of application Equitable
93 Accreditation of water Mopani N/A N/A 1 100 000 0 0 3 000 0003 00
water quality LMs for accreditation Share
quality testing laboratory
testing laboratory
Development of No N/A 0 0 0
Development of drought To cover all Drought mitigation Equitable 2 000
94 drought mitigation Mopani N/A 2 00
mitigation Plan LMs plan Share 000
Plan
Construction of Yes 0 0 0
Water Storage
facilities, Mametja,
Mametja Sekororo RegionalTreatment works, Sekororo, The Installed Water 20 000 20
95 Maruleng N/A N/A RBIG
Water Scheme bulk water supply, Oaks, Finale, Reticulation pipes 000 0
water reticulation, Mothomeng,
electrical and
mechanical works.
Rehabilitation / No 0 0 0
maintenance of To cover all Installed Water Equitable 120 000 120
96 Borehole development Mopani N/A N/A
existing & drilling LMs Reticulation pipes Share 000 0
of new boreholes
98 COVID19 Boreholes for Drill & equip 12 No Mopani G. Giyani LM TBC TBC Number of new & DBSA/MISA 0 0 0 1 000 120
Greater Giyani and new boreholes, & G. Letaba refurbished 000 0
Greater Letaba LMs refurbish 21 LM functional boreholes
97
existing ones
Identification, No 0 0 0
financing and Number of
Misalignment of Bulk to completion of To cover all incomplete projects 500 000
99 Mopani TBC TBC MISA
Reticu lation Programme projects that lack LMs financed and 000
either bulk or completed
reticulation
Completion of No 0 0 0
Sewer connections to sewer reticulation Greater 20 000
100
households in Dan Village and house Tzaneen 000
connections.
Extraction of No 0 0 0
Sand Water extraction at Greater 20 000
101 portable water from
Ramotshinyadi Tzaneen 000
sand in dry river.
Lat Long
98
No Project name Project-Description EIA Local Location PerformanceImplementin Budget Co
Needed Municipali indicator g Agent
ty Ward/Village Coordinates 2021/22 2022/23 2023/24 2024
Lat Long
The Oaks Paving of 1km gravel The Oaks (Ward 3) Paved MLM 0 0 0
1 Maruleng TBC TBC
internal streets road internal road
Santeng Paving of 400m road Maruleng Santeng (Ward 5) Paved MLM 5,440,000 5,440,000 0 0
2 Graveyard TBC TBC internal road
Access Road
Calais internal Construction of 3km Maruleng Calais Paved MLM 5,436,850 9,000,000 0 0
4 street from gravel rd to paved TBC TBC internal road
(Ward 13)
Bismarck Number of meters of Maruleng Bismark (Ward 6) Paved MLM 7,500,000 14,500,000 0 0
8 TBC TBC
Access road box cutting completed internal road
9 Maruleng low Construction of low Maruleng Hlohlokwe (Ward TBC TBC Paved MLM 7,000,000 9,000,000 0 0
100
level bridges level bridges 11), Sofaya (Ward internal road
10), Oaks (Ward 3)
& Metz (Ward 9)
Rehabilitation Construction of meters Maruleng Kampersus (Ward Paved MLM 8,250,000 10,250,000 0 0
14 of Kampersrus gravel road to paved rd 2) TBC TBC internal road
road
Lorraine Development of designs Maruleng Lorraine (Ward 12) Paved MLM 6,000,000 0 0 0
16 community of community hall TBC TBC internal road
hall
101
Botshabelo Construction of 3km Maruleng Botshabelo Paved MLM 0 7,271,850 0 0
18 internal street gravel to paved road TBC TBC internal road
(Ward 4)
Calais sports Construction of Calais Calais (Ward 12) Constructed MLM 15,848,850 0 0
20 TBC TBC
field sports field Sports field
Project Project Project Baseline Annual Performance Annua Medium Term Expenditure Implementing
Name Description Location Indicator l Framework Agent
Target
2021/2022 2022/2023 2023/2024
Maruleng Construction of Sofaya; Designs Number of low level 4 10,000,000 5,000,000 5,000,000 MLM
102
low level low level Oaks; completedbridges constructed
bridges bridges
Metz
&Hlohlokwe
Newline Ga- Construction of Newline Ga- 1.5km Number of Km of 1km 8,500,000 - - MLM
Fanie access km gravel road to Fanie (Ward paved Newline Ga-Fanie
road paved road 7) road access road paved
Rehabilitation Designs of 2km Ga- Design Number of Ga- 1.5km 10,000,000 5,000,000 - MLM
of Ga- road Sekororo s Sekororo road
Sekororo road rehabilitated
(Ward 14)
Project Project Project Baseline Annual Annu Medium Term Expenditure Implementin
Name Description Location Performance al Framework g Agent
103
Indicator Target 2021/202 2022/202 2023/2024
2 3
Bismarck Paving of Bismarck 500m Number of metres 500m 8,500,000 - 8,283,999.8 MLM
access road 500m road paved of Bismark access 5
(Ward 6)
road paved
Mabins Construction of Mabins Developme Number of 1.3km 10,000,00 22,000,00 25,000,000 MLM
cross access kilometres of nt of kilometres of 0 0
(Ward 4)
road gravel to designs Mabins access road
asphalt paved
Project Project Project Baselin Annual Annual Medium Term Expenditure Implementin
Name Description Location e Performance Target Framework g Agent
Indicator
2021/202 2022/2023 2023/2024
2
Mashoshing Construction of Mashoshin New Number of km of Designs 1,000,00 10,000,000 10,000,000 MLM
104
internal km gravel road g Mashoshing 0
street to paved road internal street
(Ward 14)
paved
Enable Construction of Enable New Designs developed Designs 1,000,00 9,000,000 8,000,000 MLM
Internal km gravel road 0
(Ward 6)
street to paved road
Shikwane Construction of Shikwane New Development of Designs 1,000,00 7,000,000 8,000,000 MLM
access road km of gravel designs 0
(Ward 11)
road to paved
road
Project Project Project Baseline Annual Annual Medium Term Expenditure Implementing
Name Description Location Performance Target Framework Agent
Indicator
2021/2022 2022/202 2023/2024
3
Scortia Construction of km Scotia New Number of km of Designs 1,000,000 10,856,299 13,969,788.8 MLM
Internal of gravel road to Scortia internal street 2
(Ward 2)
street paved rd paved
105
Bismarck Construction of Bismarck New Number of km of No - - 7,457,882.82 MLM
internal km of gravel Bismarck internal target
(Ward 6)
street road to paved street paved
road
Project Project Description Project Baselin Annual Annua Medium Term Expenditure Implementin
Name Locatio e Performance l Framework g Agent
n Indicator Target
2021/202 2022/2023 2023/2024
2
Roads & Routine maintenance Marulen 308km Number km of 308km 1,042,000 1,087,848 MLM
of municipal roads g municipal roads 1,000,00
106
bridges and bridges municip maintained 0
al area
Parks & Routine maintenance Marulen 4 Number of 6 150,000 156,300 163,177.20 MLM
gardens of 4 municipal parks g municipal parks and
& gardens municip gardens maintained
al area
Vehicles Routine maintenance Marulen 10 Number of vehicles 10 1,200,00 1,250,000 1,305,417.6 MLM
of vehicles g maintained 0 0
municip
al area
Speed Routine Maintenance Marulen 2 Number of speed 2 80,000 83,680 87,027.84 MLM
Machine of speed machines g machines
municip maintained
al area
High mast Construction of high Marulen New Number of high 4 4,000,00 9,822,230.0 9.491,633.4 MLM
lights mast lights g mast constructed 0 6 9
municip
al area
Project Project Project Baselin Annual Performance Annua Medium Term Expenditure Implementin
Name Description Location e Indicator l Framework g Agent
Target
2021/202 2022/202 2023/2024
2 3
Free basic Provision of free Maruleng 1796 Number of indigent 3700 1,500,000 1,581,000 1,666,374 MLM
electricity basic electricity to Municipal households with
indigent area access to free basic
households electricity
Project Project Description Project Baseline Annual performance Annual MTEF Implementin
Name Locatio Indicator Target g Agent
2021/202 2022/202 2023/2024
108
n 2 3
Refuse Refuse removal from Marulen 2044 Number of 11 206 6,800,00 7,085,60 7,397,366.4 MLM
removal households to the g household households with 0 0 0
Househol
landfill site in municip s basic waste
ds
Worcester al area collection
Skip Purchasing of skip Marulen New Number of skip 60 1,500,00 - - MLM
bins bins g bins purchased 0
municip
al area
Project Project Project Baseline Annual Annual Medium Term Expenditure Implementin
Name Description Locatio Performance Target Framework g Agent
n Indicator
2021/202 2022/202 2023/202
2 3 4
109
field Calais sports field field 0
constructed
OTHER ASSETS
Project Project Project Baseline Annual Annual Medium Term Expenditure Implementin
Name Description Location Performance Target Framework g Agent
Indicator
2021/202 2022/2023 2023/202
2 4
Vehicles Purchasing of Municipalit 7 cars & one Number of 1 3,000,00 2,500,000 5,500,00 MLM
municipal y waste truck vehicles purchased compacto 0 0
vehicles r
Air- Purchasing of Municipalit 30 air Number of air 15 250,000 200,000 200,000 MLM
conditioner y conditioners conditioners
Air-conditioners
s Purchased
Access Installing of access Municipalit New Number of access 2 500,000 450,000 500,000 MLM
control control equipment y control equipment
installed
Software Regular upgrading Municipalit Software Software updated Software - 450,000 500,000 MLM
of software y updated updated
Office Purchasing of Municipalit 3 Executive Number of office 20 tables 1,000,00 850,000 900,000 MLM
furniture office furniture y furniture purchased and 70 0
Tables,3 ordinary
chairs
tables, 65 high
back chairs,70
110
visitors chairs
Plant and Purchasing of plant Municipalit New Number of lawn 5 lawn 850,000 150,000 200,000 MLM
Equipmen and equipment y movers purchased mowers&1
t (lawn mowers) generator
Office Purchasing of Maruleng 2 printers, 2 Number of office 5 650,000 370,000 320,000 MLM
Equipmen office equipment municipal microwaves equipment
t purchased
Offices
Project No. Project Cost Funding Implementing Funding Funding Funding Projec
Agency
Cost (R’000) Cost (R’000) Cost (R’000)
Sustainable Integrate Infrastructure and Services Parks and Cemeteries Com1 Establishment of new cemetery in Gravelotte 1 500 000 BPM
Sustainable Integrate Infrastructure and Services Roads and stoewater Tech1 Selwane Sports Complex (Co-funding) 1 569 721,18 BPM
Total 4 125 754,73
111
Cluster Sector / KPA Capital Projects
Project Project Cost (R’000) Funding Implementing Agency Funding Funding Funding Fund
No.
Cost (R’000) Cost Cost Cost
Electrical Electrification:
Sebera; 9 000
Total 20 000
Project No. Project Cost Funding Implementing Project Cost (R’000) Funding Funding Funding Fundin
(R’000) Agency
Electrical Replacement of streetlights to energy 3 000 DOE BPM Replacement of streetlights 4 000 DOE BPM
saving lights in Ba-phalaborwa to energy saving lights in Ba-
phalaborwa
Total 3 000
112
MIG Projects
Start Finish
Tambo phase 2 Street Upgrading of 7.46km from gravel to Tar: Layer works and road surfacing 12/04 30/06 R 48 229 482,70 MIG R18 000 000.00 R 5 025 932.70
paving with 30mm continuously graded asphalt, complete with concrete open /2018 /2021
drains, edge beams, speed humps, road markings and road signs in Ward 7
Refurbishment of Upgrading of the Football field, spectator grandstand, Athletic track, TBA TBA R 44 941 439.69 MIG R 7 628 700.00 R 15 000 000.00 R 5 455 714.4
Namakgale stadium Concrete Palisade Wall Fencing, Electrification of the facility (Floodlights),
and Installation of a turf irrigation system, Netball Court, Tennis Courts,
Security/Ticket booth and Ablution Facilities in Ward 4
Benfarm upgrading of Upgrading of 2.3km from gravel to Tar: Layer works and road surfacing R 30 420 000.00 R 100 000.00 R 13 602 817.31 R 15 969 232
street with 30mm continuously graded asphalt, complete with storm water
controls, speed humps, road markings and road signs.
Installation of stormwater Installation of stormwater culverts in mashishimale Lejori, makhushane, R 26 500 000.00 R 14 372 002
culverts in mashishimale Lulekani access bridge to cemeteries and Humulani access bridge to
Lejori, makhushane, cemetery
Lulekani access bridge to
cemeteries and Humulani
access bridge to cemetery
Upgrading of B1 The project entails the upgrading of 1.1km road from gravel to tar in R 7 019 999.99 R 6 272 050.00 R 747 949.99
EXTENTION Lulekani B1 extension. The road is currently a gravel road with poor
material which slippery after rainy seasons. The project will cover surface
and sub-surface drainage for purposes of storm water control.
113
UNFUNDED PROJECTS
Cluster Sector / Capital Projects
KPA
2021/22 2022/23 2023/24 2024/25 2025
Project No. Project Cost Funding Implementin Project Cost Funding Project Cost Funding Project Proje
g Agency
(R’000) (R’000) (R’000)
Sustainable Parks and Com1 Tractors x 1 4708 2 WD PS 12 1 500 BPM Tractors x 1 4708 2 WD PS R1.7M BPM Tractors x 1 4708 2 WD PS 12 R1.9M
Integrate Cemeteries SP with heavy duty slasher for 12 SP with heavy duty SP with heavy duty slasher
Infrastructure Namakgale, Lulekani and slasher for Namakgale, for Namakgale, Lulekani and
and Services Gravelotte Lulekani and Gravelotte Gravelotte
Com2 landscaping of islands at 150 BPM landscaping of islands at 150 BPM landscaping of islands at 150
Combretum Spekboom Bataleur
Waste Com4 30 Waste lugger Bins 600 BPM 30 Waste luger Bins R600
Management
Com Procurement of one Refuse 2 500 BPM Procurement of two Refuse 5 000 BPM
Compactors Trucks Compactor Truck and one
Luger Bin
Com Establishment of New Landfill 1 500 BPM Establishment of New 10 000 BPM
Site Phase 2 (Designs,
Landfill Site Phase 3
boreholes and electrification )
114
Cluster Sector / Capital Projects
KPA
2021/22 2022/23 2023/24 2024/25 2025
Project No. Project Cost Funding Implementin Project Cost Funding Project Cost Funding Project Proje
g Agency
(R’000) (R’000) (R’000)
115
Cluster Sector / Capital Projects
KPA
2021/22 2022/23 2023/24 2024/25 2025
Project No. Project Cost Funding Implementin Project Cost Funding Project Cost Funding Project Proje
g Agency
(R’000) (R’000) (R’000)
Roads & Tech10 Procurement of a 10m³ 1 000 BPM BPM Rehabilitation Of Impala R1.5m BPM
Tipper Truck Street (Phalaborwa Fm)
Storm
In Namakgale Ward 04
water
Tech11 Humulani Access Bridge To 7 000 BPM BPM Rehabilitation Of Thulani R1.8m BPM
Cemetries In Ward 16 Street Ward 5
116
Cluster Sector / Capital Projects
KPA
2021/22 2022/23 2023/24 2024/25 2025
Project No. Project Cost Funding Implementin Project Cost Funding Project Cost Funding Project Proje
g Agency
(R’000) (R’000) (R’000)
Corp 1 Furniture & Equipment 1 000 BPM BPM Furniture & equipment 3 000 Own
funding
Total
Project Name Project Location Medium Term Expenditure Framework Implementing Agent
2021/2022 2022/2023 2023/2024
Low Level Bridges GLM R400 000 R3 000 000 R1 000 000 GLM
117
Modjadjiskloof Taxi Rank GLM R750 000
Modjadjiskloof Town Entrance GLM R750 000
Meloding Stormwater Channel GLM R1 500 000 R2 000 000 GLM
2 Tipper Truck 6m GLM R2 400 000 GLM
TLB (1) Bellview clusters GLM R1 400 000 GLM
Grader (Kgapane cluster) GLM R4 800 000 GLM
Makhutukwe street paving GLM R5 000 000 R6 000 000 R2 000 000 GLM
Raphahlelo / Phooko street paving GLM R6 000 000 R6 000 000 R2 000 000 GLM
Mapaana street Paving GLM R300 000 R2 000 000 GLM
Khethothoane street paving GLM R300 000 R2 000 000 GLM
Maupa Street paving GLM R300 000 R2 000 000 GLM
Ramoroka street paving GLM R150 000 R6 000 000 R2 000 000 GLM
Ward 15 phase 2 street paving GLM R300 000 R2 000 000 GLM
Thibeni Street Paving GLM R150 000 R6 000 000 R2 000 000 GLM
Ward 13 (Senwamokgope) street paving GLM R7 000 000 R2 000 000 GLM
Sekgopo Ramoadi street paving GLM R300 000 R2 000 000 GLM
Sephukhubye street paving GLM R6 000 000 R4 000 000 R3 000 000 GLM
Motsinoni street paving GLM R150 000 R6 000 000 R2 000 000 GLM
Mokgoba street paving design GLM R300 000 R2 000 000
4 X 4 Cherrypicker Truck GLM R1 400 000 GLM
Refurbishment of LV network GLM R50 000 R200 000 GLM
Electricity Master Plan GLM R100 000
Transformers GLM R1 500 000 R1 400 000
118
Rotaba sub station protention GLM R10 000
HV Cable Network Refurbishment GLM R500 000.00 GLM
Electrical Bulk Services EXT 11 GLM R500 000 R500 000 R3 000 000 GLM
Electrical Bulk Services Ext 12 GLM R500 000.00 R500 000 R3 000 000 GLM
Modjadjiskloof Electrical Network Integration GLM R200 000 R3 000 000 R1 000 000 GLM
Cubicles Kgapane old Sub office GLM R100 000 GLM
Office Safe Modjadjiskloof And Kgapane (DLTC) GLM R100 000 GLM
Project Name Project Location Medium Term Expenditure Framework Implementing Agent
2021/2022 2022/2023 2023/2024
Madumeleng/Shotong sports complex Madumeleng R1 000 000.00 GLM
Thakgalane Sports complex Thakgalang R1 150 000 GLM
Chain Saws GLM R50 000 GLM
Landfill site GLM R5 000 000 R2 000 000 R200 000 GLM
Kgapane new cemetery GLM R3 600 000 GLM
Highmast in various villages GLM R640 000 GLM
Fire Extinguishers GLM R100 000 GLM
Ward 5 Community hall GLM R3 600 000 GLM
Grass Cutting Machine GLM R100 000 GLM
119
PROJECTS FROM MIG
120
BASIC SERVICES
ROADS AND STORM WATER
Proje Project Project Project Duration Five (5) Year Budget Source Implementation
ct No. Name and Description Start Finish 2021/22 2022/23 2023/24 2024/2 2025/26 of Agent
Location Date Date 5 Funding
ESD-1 Upgrading of Upgrading of 01/07/20 30/06/202 R1000 000 R4 000 000 R7 000 MIG GTM
Nkowakowa B Nkowakowa B (Hope of 21 4 000
(Hope of Christ, Christ, Bombelani
Bombelani School, Giyani
School, Giyani Soshangani and
Soshangani and Xirhombarhomba)
Xirhombarhomb Streets from gravel to
a) Streets paving
ESD-2 Paving of Upgrading of 01/07/20 30/06/202 R1000 000 R4 000 000 R7 000 MIG GTM
Topanama Topanama Access 21 4 000
Access Road Road from gravel to
paving
ESD-3 Paving of Upgrading of Marirone 01/07/20 30/06/202 R5 000 000 R4 000 000 R7 000 MIG GTM
Marirone to to Motupa Street from 21 4 000
Motupa Street gravel to paving
ESD-4 Paving of Upgrading of Thapane 01/07/20 30/06/202 R1 000 000 R4 000 000 R7 000 MIG GTM
Thapane Street Street from gravel to 21 4 000
from gravel to paving
paving
ESD-5 Paving of Mulati Upgrading of Mulati 01/07/20 30/06/202 R13 900 000 R14 603 R4 890 MIG GTM
Access road Access road from 20 4 800 150
gravel to Paving
ESD-6 Tickyline to Construction of 01/07/20 30/06/202 R3 500 000 MIG GTM
Makhwibuding Tickyline to 21 2
storm water drainage Makhwibuding storm
systems. water drainage
systems.
ESD-7 Lenyenye Street from Upgrading of Lenyenye Street 01/07/202 30/06/202 R1 000 R4 000 R7 000 000 MIG GTM
gravel to paving from gravel to paving 1 4 000 000
ESD-8 Paving of Zangoma to Upgrading of Zangoma to 01/07/202 30/06/202 R1 000 R4 000 R7 000 000 MIG GTM
Mariveni Road Mariveni Road from gravel to 1 4 000 000
paving
121
ESD-9 Paving of Moseanoka to Upgrading of Moseanoka to Cell 01/07/201 30/06/202 R14 000 R15 000 R10 100 MIG GTM
Cell C Pharare Internal C Pharare Internal Streets from 9 4 000 000 000
Streets gravel to paving
ESD-10 Paving of Nkowakowa Upgrading of Nkowakowa 01/07/202 30/06/202 R1 000 R4 000 R7 000 000 MIG GTM
Section D (Tommy Spaza Section D (Tommy Spaza Shop 1 4 000 000
Shop via Bridge, Mashaba via Bridge, Mashaba via
via Vodacom and Vodacom and Raymond
Raymond Makelana) Makelana) Streets from gravel
Streets to paving
ESD-11 Paving of Risaba, Mnisi, Upgrading of Risaba, Mnisi, 01/07/201 30/06/202 R14 000 R15 000 R10 100 000 MIG GTM
Shando, to Driving schoolShando, to Driving school 9 4 000 000
Internal Street Internal Street from gravel to
paving
ESD-12 Paving of Main road from Upgrading of Main road from 01/07/201 30/06/202 R14 000 R15 000 R10 100 000 MIG GTM
Ndhuna Mandlakazi, Ndhuna Mandlakazi, Efrika, 9 4 000 000
Efrika, Zangoma, Zangoma, Mpenyisi to Jamba
Mpenyisi to Jamba Cross Cross Internal Street (in Ward
Internal Street (in Ward 13, Mandlakazi)
13, Mandlakazi)
ESD-13 Paving of N’wamitwa Upgrading of N’wamitwa Bridge 01/07/201 30/06/202 R14 000 R15 000 R10 100 000 MIG GTM
Bridge via Nhlengeleti via Nhlengeleti School to Taxi 9 4 000 000
School to Taxi Rank, Rank, Clinic via Lwandlamuni
Clinic via Lwandlamuni School to
School to N’wamitwa/Mandlakazi Road
N’wamitwa/Mandlakazi from gravel to paving
Road from gravel to
paving
ESD-14 Access Street from Upgrading of Access Street 01/07/202 30/06/202 R2 000 000 MIG GTM
Khopo, Molabosane from Khopo, Molabosane 3 4
School via Tickyline and School via Tickyline and
Myakayaka Serutung to Myakayaka Serutung to
Malegege to Shoromong Malengenge from gravel to
paving
122
HIGH & LOW-LEVEL BRIDGES
Project Project Name and Project Project Duration Five (5) Year Budget Source of Implem
No. Location Description Start Finish 2021/22 2022/23 2023/24 2024/25 2025/26 Funding ation
Date Date Agent
ESD-19 Pedestrian Crossing bridges Construction of 01/07/2024 30/06/2025 R2 000 000 R4 722 920 MIG GTM
Pedestrian bridges
ESD-20 Low level bridges Construction of low 01/07/2022 30/06/2023 R5 000 000 OWN GTM
level bridges in villages
Project Project Name and Project Description Project Duration Five (5) Year Budget Source of Impleme
No. Location Funding ion Agen
Start Finish 2021/22 2022/23 2023/24 2024/25 2025/26
Date Date
ESD-21 Tzaneen Ext. 13 Upgrading of Tzaneen Ext. 01/07/2022 30/06/2023 R9 000 000 OWN GTM
internal streets 13 internal streets from
paving blocks to tar
ESD-22 Dannie Joubert Street Patchwork, Fog Spray and 01/07/2022 30/06/2023 R1 000 000 OWN GTM
(Police Station to CTM) Slurry Seal
in Tzaneen
ESD-23 Pusela via Van Velden Patchwork, Fog Spray and 01/07/2022 30/06/2023 R1 000 000 OWN GTM
Hospital to Billy Maritz Slurry Seal
street in Tzaneen
ESD-24 1st Avenue street in Patchwork, Fog Spray and 01/07/2022 30/06/2023 R1 500 000 OWN GTM
Tzaneen Slurry Seal
ESD-25 3rd Avenue to Hospital Patchwork, Fog Spray and 01/07/2023 30/06/2024 R2 000 000 OWN GTM
to 2nd Avenue street in Slurry Seal
Tzaneen
ESD-26 Haenertsburg Rehabilitation 01/07/2022 30/06/2023 R3 000 000 OWN GTM
Cemetery road
ESD-27 Main CBD Street and Rehabilitation of Main CBD 01/07/2023 30/06/2024 R2 000 000
Parking in Letsitele Street and Parking in
Letsitele
ESD-28 Boundary street in Rehabilitation of Boundary 01/07/2023 30/06/2024 R2 500 00 OWN GTM
Tzaneen street in Tzaneen
ESD-29 Nkowakowa Internal Rehabilitation of 01/07/2022 30/06/2023 R8 000 000 OWN GTM
123
Project Project Name and Project Description Project Duration Five (5) Year Budget Source of Impleme
No. Location Funding ion Agen
streets (Bankuna, Tambo Nkowakowa Internal
to Maxakeni Road) streets (Bankuna, Tambo
to Maxakeni Road)
ESD-30 Lenyenye Internal Streets Rehabilitation of Lenyenye 01/07/2022 30/06/2023 R6 000 000 OWN GTM
(Main street to Industrial Internal Streets (Main
Area, Stadium, Ithuseng street to Industrial Area,
to Main street via Police Stadium, Ithuseng to Main
Station) street via Police Station)
ESD-31 Voster street in Rehabilitation Voster street 01/07/2023 30/06/2024 R1 200 000 OWN GTM
Letsitele in Letsitele
ESD-32 Eerste street in Rehabilitation of Eerste 01/07/2022 30/06/2023 R800 000 OWN GTM
Letsitele street in Letsitele
ESD-33 Speed humps on Construction of 30 speed 01/07/2021 30/06/2022 R1 000 000 OWN GTM
municipal streets at humps on municipal streets
various areas at various areas
Project Project Name and Project Description Project Duration Five (5) Year Budget Source of Implementation
No. Location Start Finish 2021/22 2022/23 2023/24 2024/25 2025/26 Funding Agent
Date Date
ESD-118 Walk-behind Roller Purchase of Walk-behind 01/07/2021 30/06/2022 R600 000 OWN GTM
X2 Roller X 2
ESD-34 1x Bulldozer Purchase of Bulldozer 01/07/2024 30/06/2025 R 2 800 000 OWN GTM
ESD-35 Lowbed Truck and Purchase of a Lowbed 01/07/2022 30/06/2024 R1 500 000 OWN GTM
Trailer Truck and Trailer
ESD-36 Tar cutting machines Purchasing of tar cutting 01/07/2024 30/06/2026 R200 000 R200 000 OWN GTM
and small compactors machines and small
compactors
ESD-37 Construction machinery: 4x TLB, 2x graders G140. 01/07/2021 30/06/2024 R5 000 000R4 100 000 R4 300 000 OWN GTM
TLB, Grader Dumper tractor for sewer
plant
124
BASIC SERVICE DELIVERY AND INFRASTRUCTURE DEVELOPMENT
STRATEGIC OBJECTIVE: To develop sustainable infrastructure networks which promote economic grown and improved quality of life.
A. ELECTRICITY:
PROJECT/PROGRAM 2021/22 2022/23 2023/24 2024/25 2025/26 SOURCE
125
27. Electrification of 200 HH Dzingidzingi R0 R0 R4,000,000. 0 0 INEP
28. Electrification of 200 HH Gonono R1,800,000 R0 R0 0 0 INEP
29. Electrification of 200 HH Gonono R100,000 R0 R0 R0 R0 GGM
30. Electrification of 200 HH Maphata village R0 R3,000,000 R0 0 0 INEP
31. Electrification of 200 HH Zava village R0 R0 R3,000,000. 0 0 INEP
32. Electrification of 200 HH Mphakane village R0 R3,000,000 R0 0 0 INEP
33. Electrification of150 HH Makhuva village R0 R0 R3,000,000 0 0 INEP
34. Electrification of 150 HH Botshabelo village R0 R0 R3,000,000 0 0 INEP
35. Electrification of 100 HH Nwadzekudzeku village R0 R3,000,000 R0 0 0 INEP
36. Electrification of 539 HH Giyani section F R50,000 R0 R9,000,000 0 0 GGM
37. High mast energising R0 0 0 0 0 GGM
38. Installation of high masts in 93 villages(CBD) R500,000 R0 R0 0 0 GGM
39. Installation of traffic lights and R81 lighting in Giyani R100,000 R0 R0 0 0 GGM
40. Installation of energy saving street lamps R8,000,000 R4,000,000 R4,000,000. 0 0 GGM
41. Installation of traffic lights in Giyani township R0 R500,000 R500,000 0 0 GGM
B. ROADS AND STORM WATER
126
15. Blinkwater upgrading of internal streets R100,000 R11,500,000 R0 R0 R0 GGM
16. Nkurhi zamani upgrading of internal streets R8,000,000 R0 R0. R0 R0 MIG
17. Nkurhi Zamani upgrading of internal streets R100,000 R0 R0 R0 R0 GGM
18. Thomo upgrading internal streets R12,023,641 R10,693 R0. R0 R0 MIG
19. Thomo upgrading of internal streets R0 R6,805,400. R0 R0 R0 GGM
20. Culvert bridges to Cemeteries ward 1 to 31 R0 R0 0 R0 R0 GGM
21. Silawa upgrading from gravel R0 R1,220.845 R24,431,420 R0 R0 MIG
22. Upgrading of Road D3187 from gravel to tar R0 R0 R0 R0 R0 GGM
23. Siyandhani ring road R0 R0 R20,000,000. R0 R0 MIG
24. Shimange upgrading of road from gravel to paving R100,000 R0 R0 R0 R0 GGM
25. Shimange – upgrading of road from gravel to paving (5km) R20,00,000 R0 R0 R0 R0 MIG
C. COMMUNITY FACILITIES
PROJECT/PROGRAM 2021/22 2022/23 2023/24 2024/25 2025/26 SOURCE
1. Homu 14b sport centre development R0 R0 R0 R0 R0 MIG
2. Homu B Sports Centre Development R4,600,000 0 0 R0 0 GGM
3. Purchase of bins R200,000 R0 R100,000 R0 0 GGM
4. Refurbishment of Gawula Sports Centre R50,000 R0 R0 R0 R0 GGM
5. Refurbishment of Shivulani Sports Centre R1,500,000 R0 R0 R0 R0 GGM
6. Refurbishment of Mzilela, Shawela, Mavhuza, Muyexe and Khani Sports R0 R0 0 R0 0 GGM
Centres
7. Mavalani Indoors Sports Centre R R21,457,650 R0. R0 0 MIG
8. Mavalani indoor sport center R2,000,000 R0 R0 R0 R0 GGM
9. Jim Nghalalume Community Hall R0 R19,500,000 R8, 000,000. R0 R0 MIG
10. Jim-nghalalume community hall R2,000,000 R0. R0 R0 R0 GGM
11. N’wadzekudzeku Community Hall R0 R19,500,000 R10, 000.000. R0 0 MIG
12. Nwadzekudzeku Community hall R2,000,000 0 0 0 0 GGM
13. Redevelopment of Giyani Golf course R1,000,000 R800,000 R500,000 R0 0 GGM
14. law enforcement R250,000 R250,000 R250,000 R0 0 GGM
15. Ndhambi Taxi Rank Development R13,457,000 R0 R0 R0 R0 MIG
Ndhambi taxi rank R0 R0 R0 R0 GGM
16. Refurbishment of Giyani stadium and TP Khuvutlu tennis court section A R50,000 R0 R0 R0 R0 GGM
127
17. Mageva sport centre pitch extension R1,000,000 R0 R0 R0 R0 GGM
15 Giyani section E sport centre R50,000 R0 R0 0 0 GGM
D. MUNICIPAL FACILITIES
PROJECT/PROGRAM 2021 /22 2022/23 2023/24 2024/25 2025/26 SOURCE
1. Giyani Civic Centre Phase 4 - Upgrading R7,064,924 R12,840,000 R0 0 0 GGM
2. Giyani civic centre phase 3 R0 R0 R0 0 0 GGM
3. Waste Disposal Site R0 R0 R0 0 0 MIG
4. Waste Disposal Site(Own funding) R500,000 R0 R0 0 0 GGM
5. Office furniture and Equipments R1,000,000 R1,50,000 R1,100,000 0 0 GGM
6. Rehabilitation of the Giyani Dumping Site R R5, 000,000. R5,000,000. 0 0 GGM
7. Law enforcement equipment R250,000 R250,000 R250,000 0 0 GGM
8. Refurbishment of the Giyani Arts and Culture Centre R0 R0 0 0 0 GGM
9. Installation of camera and monitor R500 000 R0 R0 0 0 GGM
10. Firearm acquisition R500 000 R0 R0 0 0 GGM
11. Upgrading of the Giyani Parking lot R2,000,000 R0 R0 0 0 GGM
12. Purchase of monitor and camera R500,000 R350,000 R410,000 0 0 GGM
13. Acquisition of air conditioners R500,000 R600,000 R1,100,000 0 0 GGM
14. Walk through metal detector purchase R268,000 R380,000 R401,000 0 0 GGM
128
Department of Public Works, Roads and Infrastructure
Capital and Maintenance of Projects Municipality Coordinates Period Project cost vs Budget over MTEF
Expenditure to date period
Project Name Project Description Local Status Latitude Longitude Starting End Total Actual Exp. 2020/21 2021/22 202
Municipality date date Project 2019/20
Cost
1 Installation of Lifts Installation of Lifts Tzaneen, - - - 01/02/2020 31/10/2022 - - 3m 1m 1
2 Installation of Lifts Installation of Lifts Giyani - - - 01/02/2020 31/10/2022 - - 3m 1m 1
3 Refurbishment of Refurbishment of Giyani Giyani Planning - - 01 April 22 31 March - - 0 7m 9
Giyani Government Government Complex: 2023
Complex: Block F Block F
4 Gidela Secondary Construction of new Greater Site 23,40 30,33 26/01/21 26/07/22 26m 0.00 17m 0 0
School facilities and renovation of Giyani handover
existing
5 Letaba Hospital- Letaba Hospital- Contract Greater - -23,8744 30,2678 07-Dec-17 23-Nov-21 98m 34m 50m 0 0
Contract A6 A6: Burnt Female Surgical Letaba
Ward, waste store, etc
6 Maphutha Malatji Construction of new Ba- - -23,9253 31,036913-Feb-17 23-Jul-21 353m 253m 65m 0 0
OPD, Casualty, X-Ray Phalaborwa
building including
associated external works
7 LDPWRI-ROADS Household Routine Maruleng - - - Mar-18 Nov-21 39m 15m 12m 8m 0
17020 Maitenance
8 LDPWRI-ROADS Household Routine Greater - - - Mar-18 Nov-21 40m 21m 12m 14m 0
17021 Maitenance Tzaneen
10 LDPWRI-ROADS Household Routine Greater - - - Mar-18 Nov-21 42m 11m 12m 456 974 0
129
18013 Maitenance Giyani
SUB-TOTAL
Routine Road
Maintenance: Greater Various villages
Routine road Maintained
1 Greater Letaba & Letaba and along the R81 TBC TBC SANRAL 80 831 279 0 0 0 0
maintenance roads
Greater Giyani Giyani road
Municipality
Routine road
Routine Road
maintenance inclusive of
Maintenance: Ba- Ba- Various villages Maintained
3 bush clearing and TBC TBC SANRAL 48 124 195 0 0 0 0
Phalaborwa Phalaborwa along the R71 road
stormwater
Municipality
management
4 Routine Road Routine road Greater Various villages TBC TBC Maintained SANRAL N/A 0 0 0 0
130
maintenance inclusive of
Maintenance:
bush clearing and along the R36
Greater Tzaneen Tzaneen road
stormwater and R71
Municipality
management
Greater Improved
Improvement of the Various villages
5 R81 Improvement Letaba and TBC TBC road SANRAL 162 271 667 0 0 0 0
existing road along the R81 rd
Giyani conditions
Upgrading of
National Road R71 Greater
from Gravelotte Upgrading of the road Tzaneen Gravelotte Upgraded
6 TBC TBC SANRAL 0 0 0 0 0
to Ga-Selwane: capacity and condition and Ba- Selwane road
Upgraded with Phalaborwa
paved shoulders
Upgrade of Thomo
Upgrade of Provincial Greater Upgraded
8 Provincial Road TBC TBA SANRAL TBA TBA TBA TBA TBA
Road D3810 Giyani Hlomela road
D3810
Upgrade of Mageva
Upgrade of Provincial Greater Upgraded
9 Provincial Road TBC TBA SANRAL TBA TBA TBA TBA TBA
Road D3187 Giyani Makhuva road
D3187
Upgrade of
Upgrade of Provincial Calais to Upgraded
10 Provincial Road Maruleng TBC TBA SANRAL TBA TBA TBA TBA TBA
Road D3878 Sekororo road
D3878
11 New Grade- New Grade-separated Maruleng Hoedspruit TBC TBA Constructed SANRAL TBA TBA TBA TBA TBA
131
separated
Interchange on Interchange on National
traffic inter-
National Route Route R40 and R527 at
change
R40 and R527 at Hoedspruit.
Hoedspruit.
1 RAL/C759 RAL/T759 D523, D589 Agatha roads (Flood) GTM TBC TBC TBC Maintained road RAL 3.8 M 0 0 0
4 RAL/T986 RAL/T986 Maintenance on Road D11 GLM TBC TBC TBC Maintained rd RAL 33.9 M 0 0 0
5 T1010 Giyani College – Mninginisi Block - 2 GGM TBC TBC TBC Maintained rd RAL 39 M 0 0 0
6 T986A Maintenance of Road D11 GLM TBC TBC TBC Maintained rd RAL 36 M 0 0 0
7 RAL/C991 Maintenance of Georges Valley Road D548 GTM TBC TBC TBC Maintained rd RAL 10 M 40 M 0 0
8 T1049 Tshatshama Road (D3734) GLM TBC TBC TBC Upgraded Road RAL 5.2 M 0 0 0
132
Location BUDGET ESTIMAT
Implementing
Project Local Performance
No Project Description Village/ Coordinates Agent/
name Municipality indicator 2021/22 2022/23 2023/24 2024/2
Ward Funder
Lat Long
9 T1053 Thapane Cross to Namithwa GTM TBC TBC TBC Upgraded Road RAL 3.0 M 0 0 0
13 RAL/T530BRAL/T530B: 3KM D3878 Balloon to Sekororo MM TBC TBC TBC Upgraded Road RAL 5M 0 0 0
No Projec Project Description Local Location Performance Implementing Budget Cost Estim
t Munici indicator Agent/ Funder
name pality Ward/Village Coordinates 2021/22 2022/23 22023/24 2024/25 2025
Lat Long
1 RL2 Giyani bulk water Greate 55 Villages N/A N/A Installed bulk line IA- Lepelle 111 341 249 989 250 000 0
8 supply (Nandoni to r supplied from from Nandoni to Northern Water
133
Nsami pipeline) Giyani Nsami WTW Giyani Funder - DWS
2 RM08 Giyani Water Services Greate 55 Villages N/A N/A Construction of 324 IA- Lepelle 130 000 120 000 11 595 0
r supplied from km of bulk potable Northern Water
Giyani Nsami WTW water pipeline
Funder - DWS
covering 55 villages
within Giyani.
3 RS135 Babanana/Nkambako Greate Nwamitwa, N/A N/A Construction of IA- Lepelle 95 572 106 542 30 000 0
Bulk Water Project r Mawa, Nkambako to Northern Water
Tzanee Mookgo, Babanana pipeline,
Funder - DWS
n Hlohlokwe the refurbishment of
Nkambako Water
Treatment Works and
the existing
distribution pipelines
5 Refurbishment of Greate Politsi Plant - 30,0946 Refurbished motors Lepelle Northern 500 1000
Electrical, Motor and r 23,772 and pumps Water
pumps Politsi Scheme Letaba 49 300
6 Greate Politsi Plant - 30,0946 Consulting services Lepelle Northern 1200 4 000 8 960
Politsi Upgrade r 23,772 for upgrade of Politsi Water
Professional Fees - Letaba 49 Water treatment
Ingerop Consulting works 600
7 Politsi raising main Greater Politsi Plant - 30,0946 Construction of rising Lepelle Northern 20 000 32 000
pipeline installation Letaba 23,772 main from Politsi to Water
134
49 Florida
8 Refurbishment of Electrical Ba- Phalaborwa - 31,14155 Refurbished Lepelle Northern 1500 2400 6000
Infrastructure Phalaborwa Phalabor Plant 24,0650 electrical Water
wa 67 infrastructure
9 Refurbishment of radial Ba- Phalaborwa - 31,14155 Refurbished barrage Lepelle Northern 9000 20 000 7 000
gates at Phalaborwa Phalabor Plant 24,065 radial gates Water
Barrage, replacement of wa 067
stoplogs at Phalaborwa
plant Phase 2
10 Radial Gates Phalaborwa - Ba- Phalaborwa - 31,14155 Consulting services Lepelle Northern 3150 7000 2450
Professional Fees Phalabo Plant 24,065 for refurbishment of Water
rwa 067 radial gates
11 Main pumpstation valves Ba- Phalaborwa - 31,14155 Installation of valves on Lepelle Northern 7500 7700 10 000 5000
(PMC Valves and Flow Phalabo Plant 24,065 main pumpstation Water
meters) rwa 067
12 Phalaborwa Cathodic Ba- Phalaborwa - 31,14155 Refurbished cathodic Lepelle Northern 5400 3200 9000 5000 50
Protection Phase 2 Phalabo Plant 24,065 protection Water
rwa 067
13 Phalaborwa Sludge lagoon Ba- Phalaborwa - 31,14155 Construction of Lepelle Northern 8300 9000 9200
and Chlorine House Phalabo Plant 24,065 sludge lagoon and Water
rwa 067 chlorine roon
14 Phalaborwa Sludge lagoon Ba- Phalaborwa - 31,14155 Consulting services Lepelle Northern 3800 2500 2100
and Chlorine House Phalabo Plant 24,065 for construction of Water
Professional Fees rwa 067 sludge lagoon and
chlorine room
135
15 Refurbishment of Ba- Phalaborwa - 31,14155 Refurbished Lepelle Northern 0 0 15000 15000 15
Reservoirs and processing Phalabo Plant 24,065 reservoir and Water
Structures rwa 067 structures
16 Refurbishment of Pumps Ba- Phalaborwa - 31,14155 Refurbished pumps Lepelle Northern 500 300 2000 2000 20
and Motors Phalabo Plant 24,0650 and motors Water
rwa 67
### Projects funded by LNW are subject to approval by the board. The list as provided may not be final.
No Project name Project Description Local Location Performanc Implemen Budget Cost
Municip e indicator ting
ality Ward/ Coordinates Agent 2021/22 2022/23 2023/24 2024/25
Village
Lat Long
Water 0 0 0
Installation of a Telemetric system
Conservation / Mopani District- Approved
2 at nodes of water supply system Mopani DM 45 000 000
Demand DM wide WCDM
to monitor NRW and water losses.
Management
4 Infrastructure Program to update the asset Mopani District- Approved Mopani DM 40 000 000 0 0 0
and Asset register & develop an operation
136
5.4.3.11 MUNICIPAL INFRASTRUCTURE SUPPORT AGENCY
No Project name Project Description Local Location Performanc Implemen Budget Cost
Municip e indicator ting
ality Ward/ Coordinates Agent 2021/22 2022/23 2023/24 2024/25
Village
Lat Long
Groundwater 0 0 0
development
project - Completion of bulk project and
Borehole reticulation for 55 villages in
5 GGM 55 villages Mopani DM 95 000 000
development & Giyani and refurbishment for
refurbishment additional 38 villages
in several
villages
Giyani Water 0 0 0
Bulk lines for water distribution
6 Services GGM 55 Villages Mopani DM 874 000 000
to 55 villages
Project
137
5.4.3.11 MUNICIPAL INFRASTRUCTURE SUPPORT AGENCY
No Project name Project Description Local Location Performanc Implemen Budget Cost
Municip e indicator ting
ality Ward/ Coordinates Agent 2021/22 2022/23 2023/24 2024/25
Village
Lat Long
Thabina 0 0 0
Provision of water reticulation
Regional Water
and yard connections to villages
10 Scheme Water GTM 3 931 HH Mopani DM 75 000 000
under Thabina Regional Water
Reticulation &
Scheme
Cost Recovery
13 Ritavi II Water Upgrade of Nkowankowa WTW GTM 20 058 HH Mopani DM 14 000 000 0 0 0
138
5.4.3.11 MUNICIPAL INFRASTRUCTURE SUPPORT AGENCY
No Project name Project Description Local Location Performanc Implemen Budget Cost
Municip e indicator ting
ality Ward/ Coordinates Agent 2021/22 2022/23 2023/24 2024/25
Village
Lat Long
Supply
PROJECTS
Latitude Longitude
139
1 Transpor Re- Design BusAll District District-wide N/A N/A New subsidized Department of 4 500 000 0 0 0
t Subsidy service municipalities Transport and
service networks
Planning networks Community
and contracts
Safety
Project developed
2 Subsidis Subsidised Greater Giyani, N/A N/A Subsidised Department of 79 000 000 83 000 87 000 91 000 96
ed bus services Greater Tzaneen, Transport and 000 000 000 00
bus services
Greater Letaba Community
bus provided
and Maruleng Safety
services
Household based Routine Road Maintenance Household based Routine Road Maintenance 118 567 108
5.4.4.1 MOPANI DISTRICT MUNICIPALITY: BASIC SERVICES: Social Security and Social Protection
MDM PROJECTS
No Project name Project Description Local Location Performan Implementing Budget Cost Estim
141
Municip Ward/ Coordinates ce Agent/ Funder 2021/22 2022/23 2023/24 2024/25 2
ality Village indicator
Lat Long
1 Fire & Rescue Provide for Replacement of MDM MDM/ ES 12 000 000 0 22 000 000 24 000 2
old non-operational vehicles 000 0
Services
& purchasing of New
Specialised
Vehicles
Vehicles
4 Fire & Rescue Procurement of Fire & MDM MDM/ ES 2 750 000 5 000 000 5 500 000 6 500 7
Equipment Rescue Equipment 000 0
5 Fire protection Provide wild fire units for MDM MDM/ ES 0 0 0 600 000 6
association operations and helicopter
standing fees
6 Aerial firefighting Veld & Forest Aviation MDM MDM/ ES 480 000 500 160 522 167 600 000 6
support Support for Mopani DM
7 District Fire Plan Development of fire plan MDM ALL MDM/ ES 245 000 0 0 300 000
142
8 Fire Services Plan and develop a MDM MDM/ ES 0 0 0 20 000
Training Centre District Fire Training 000
Centre
9 Fire awareness Public education and Fire MDM MDM/ ES 100 000 104 200 108 785 150 000 1
campaigns Awareness
(PIER)
PROJECTS
No Project name Project Description Local Location Performance Implementin Budget Cost Es
Munici indicator g Agent/
pality Ward/Village Coordinates Funder 2021/22 2022/23 2023/24 2024/25
Latitude Longitude
1 Feasibility Study Feasibility study of MDM N/a N/a n/a Reports MDM/ ES 500 000 521 000 543 924 0
for Regional the possibility of
Landfill developing the
regional land fill
2 Development of To develop the MDM n/a n/a n/a Developed & MDM/ ES 0 0 0 5 000
Regional Landfill regional landfill operation of 000
site. regional landfill
4. Development of Developing IWMP MDM n/a n/a n/a Developed/ MDM/ ES 600 000 200 000 0 0
adopted of by
Integrated Waste
the council
Management Plan
IWMP/
(IWMP)
6 Development of Develop EMF of MDM n/a n/a n/a Developed/ MDM/ ES 200 000 600 000 200 000 0
Environmental the District adopted EMF
Management by council
Framework (EMF)
7 Review of Air Quality Review the AQMP MDM n/a n/a n/a Reviewed and MDM/ ES 400 000 200 000 100 000 0
Management Plan adopted AQMP
Plan (AQMP)
8 Development of Develop the MDM n/a n/a n/a Developed and MDM/ ES 200 000 600 000 200 000 0
Environmental district EMP adopted EMP
Management Plan
(EMP)
144
MOPANI DISTRICT: MUNICIPAL HEALTH SERVICES
No Project name Project Description Local Location Performan Implementin Budget Cost Es
Municip ce g Agent/
ality Ward/ Coordinates indicator Funder 2021/22 2022/23 2023/24 2024/25
Village
Lat Long
1 Food safety and Inspections of food premises and MDM All n/a n/a MDM/ ES 20 000 20 840 21 757 25 000
hygiene Awareness Public awareness on health risks of LMs
project unsound foodstuffs
2 Food sampling Food sampling for bacteriological MDM All n/a n/a MDM/ ES 50 000 52 100 54 392 70 000
and chemical quality analysis (96 LMs
samples
3 Skills Development Capacitate EHPs through workshops MDM MDM/ ES 162 916 169 758 177 228 0
and training to enhance quality
delivery of services and to ensure
enforcement of Environmental
Health legislation
5. Municipal Health Develop Municipal Health Services MDM n/a n/a n/a MDM/ ES 0 0 0 400 000
145
Services Bylaws By-laws that covers all the 9
functions of Municipal Health Services
6 Water and Food Develop water and food sampling MDM n/a n/a n/a MDM/ ES 0 0 0 50 000
plans
Sampling Plans
7 Environmental Conduct pollution control All n/a n/a n/a MDM/ ES 100 000 104 200 108 785 130 000
Awareness awareness at villages and towns
campaign
8 Chemical Safety Conduct chemical safety awareness All local n/a n/a n/a MDM/ ES 70 000 72 940 76 149 78 000
on farms, schools and ECD centres areas
9 Disposal of the Pauper burials, Inspect and conduct All local n/a n/a n/a MDM/ ES 70 000 72 940 76 149 78 000
Dead workshops on mortuaries and areas
funeral undertakers
10 Development of Develop District Health and All local n/a n/a n/a MDM/ ES 0 0 0 150 000
Health & Hygiene Hygiene Strategy areas
Strategy (EHHS)
11 Chemical Safety Conduct chemical safety awareness All local n/a n/a n/a MDM/ ES 0 0 0 0
on farms, schools and ECD centers areas
12 Career expo Conduct career exhibition at high All local n/a n/a n/a MDM/ ES 0 0 0 150 000
schools following the 2020 areas
Environmental Health day
pronouncement of the Minister of
Health on Shortage of Environmental
Health Practitioners
13 Communicable Capacitate the general public on the All local MDM/ ES 70 000 72 940 76 149 0
diseases control prevention of the emerging Vector,
146
water and airborne diseases and areas
infections
PROJECTS
No Project name Project Description Local Location Performance Implementi Budget Cost Es
Municipal indicator ng Agent /
ity Ward/ Coordinates Funder 2021/22 2022/23 2023/24 2024/25
Village
Lat Long
2 Annual conference for Disaster 100 000 104 200 108 785 110 000
disaster Managers Management
Disaster Management conference held in
Conference September
147
6 AFIS Dashboard 0 0 0 20 000
10 Emergency light for Emergency light for MDM/ ES 160 000 166 720 174 056 177 000 1
disaster vehicles disaster vehicles
148
11 Upgrading and Upgrading and renovation MDM/ ES 1 750 000 1 823 500 1 903 734 1 910 0001
renovation of the of the Operational Centre
Operational Centre and Tactical Centre
and Tactical Centre
13 Disaster Management Disaster Management MDM/ ES 100 000 104 200 108 785 120 000
Seminar Seminar
15 Smoke detectors for Supply of smoke All locals MDM/ ES 75 000 78 150 81 589 90 000
detectors to informal
informal settlements &
houses and households
communities
vulnerable for fires
vulnerable to fires
16 Fire safety project Purchasing and supply All locals MDM/ ES 10 000 10 420 10 878
of fire safety kits
17 Upgrading of Upgrading of the Disaster MDM/ ES 1 950 000 2 031 900 2 121 2 280
Emergency Managemen 304 000
Emergency
Communication Centre/ t Centre and
Communication Central Communication the Locals
Centre /Central Centre. To improve the
Communication emergency
communication with
Centre communities in need and
during emergencies and
149
disasters to comply with
the National Minimum
Infrastructure Guidelines
for Disaster Management
Centre and Council
Resolution OCD/ 08 /2020
dated 31 January 2020
20 Disaster Risk School Competition on All locals MDM/ ES 100 000 104 200 108 785
Reduction School how to implement
Competition disaster risk reduction
project
21 Training for Disaster Training for Disaster All locals MDM/ ES 0 0 0 120
Management Forums Management Forums 000
and Disaster Task and Task Teams, District
Teams and Local. (Budget is for
pamphlets, catering,
Workshop facilitation,
traveling &
accommodation
23 Disaster Relief Relief during All MDM/ ES 3 000 000 3 126 000 3 263 3 500
Support emergencies & disasters. 544 000
(Emergency relief is
available for all
emergencies like
flooding, droughts,
150
emergency water and
emergency housing).
HIV/AIDS
1. District AIDS Council District AIDS Council MDM # People to attend Departments, Civil society, 50 000 52 100 54 392 55
meetings Local municipalities
2. Partnership with NGOs, support MDM # People to attend Departments, NGO’s, Civil 108 785
Civil Society, etc. society, Local Munic 100 000 104 200 11
3. Red Ribbon Awareness raising MDM # People to attend Departments, Civil society, 50 000 52 100 54 392 70
Local municipalities
4. World AIDS Day Commemoration of HIV & MDM # People to attend Departments, Civil society, 150 000 156 300 163 177 18
Aids victims Local municipalities
5. STI Condom week Awareness campaign MDM # People to attend Departments, Civil society, 0 0 0 70
Local municipalities
6. World TB Day Commemoration of MDM # People to attend Departments, Civil society, 150 000 156 300 163 177 18
World TB Day Local municipalities
7. Candle Light Memorial Commemoration of HIV & MDM # People to attend Departments, Civil society, 0 0 0 30
Aids victims Local municipalities
8. Migrant Health Forum Awareness on migrant MDM # People to attend Departments, Civil society, 50 000 52 100 54 392 55
health Local municipalities
9. Support to Child headed Buying of groceries and MDM #of families to be Mopani District Municipality 200 000 208 400 217 570 22
151
families school uniform for Child supported
headed families.
1. Indigenous Games 17 Games that are played BPM N/A # of people MDM at Local and District 0 0 0 17
by all the age groups under participating in the level; DSAC at Provincial and
mass participation. indigenous games National level
2. Golden Games 19 games that are played by GGM N/A # of older persons MDM at local and District 0 0 0 35
older persons from the age participated in the Level
of 60 and above under mass golden games DSD at Provincial and
participation National level
3. Women and Sport Women play games that are GTM N/A # of women MDM from local to 0 0 0 32
male dominated e. g participating in male District.
Football ,rugby ,cricket dominated
under sport development codes/games
and to identify talent .
4. Junior Dipapadi They are the games that are GLM N/A # of children MDM from local to 0 0 0 32
played by children in the participated in the District
category of early childhood games
development from 4-6
years.
5. Disability Games To support games that are BPM N/A # of activities were MDM 0 0 0 36
played by people living with supported
disability –(Physical
disabled, Intellectual
Impaired and deaf).
6. Support to Federations Support to twelve District N/A # of federations MDM 410 000 427 000 466 018 47
federations (football, Provinc were assisted
netball, softball, baseball, ial
cricket, rugby, volleyball, Nation
basketball, chess, al
gymnastics, hockey,
152
athletics) that are found in
the District. The support is
by means of transport,
accommodations and meals
during their tournaments/
championships.
7. Library Activities To support library activities GTM N/A # of activities were MDM 0 0 0 19
such as Readathon and supported.
library week. It also support
the activities of the library
forum to buy trophies and
medals during competitions.
8. District Arts and Culture To support artists in GGM N/A # of artists were MDM 0 0 0 39
Activities different genres with supported
workshops and during their
activities such as auditions
& competitions. To also
support two Arts Centers in
the District.
9. Sport Against Crime To assist Community Safety MDM N/A # of activities were MDM 0 0 0 34
and SAPS to reduce crime supported SAPS
and identify talent at the
hotspots. Four Police
stations (Namakgale,
Nkowankowa , Giyani and
Kgapane )were identified in
this Programme. SAPS
utilize Sport for awareness
campaigns.
10. Farm Sport To encourage healthy GTM N/A #of activities were MDM-Sport, HIV & AIDS 0 0 0 140
lifestyle, awareness Farms supported
campaigns and talent
identification.
153
11. Ku luma vukanyi An event to celebrate BPM N/A # of activities were MDM 0 0 0 150
heritage of drinking the first supported DSAC
fruit of marula. LEDET
12. District Arts and Culture To support the council of MDM N/A # of activities were MDM 0 0 0 150
Council artists in their activities such supported
meals ,transport and
accommodation during
meetings and events
13. District Sport To support the MDM N/A # of activities were MDM 0 0 0 190
Confederation Confederation in their supported
activities such as meals,
transport & accommodation
during meetings & events.
14. Xitsonga music awards To promote indigenous MDM N/A Annual celebration Munghana Lonene 400 000 416 800 435 139 500
languages
154
Location Budget Cost Estimat
Implementing
Project Local Performance
No Project name Coordinates Agent/ 2024/25 2025
Description Municipality Ward/Village indicator 2021/22 2022/23 2023/24
Funder
Lat Long
1 Skip Bins (x30) Skip Bins (x30) Greater Letaba Greater Letaba TBC TBC Purchased skip bins GLM 1 000 000 0 0 0 0
2 Trolley bins Trolley bins Greater Letaba Greater Letaba TBC TBC Purchased trolley bins GLM 1 000 000 0 0 0 0
3 Tractor Tractor Greater Letaba Greater Letaba TBC TBC Purchased tractor GLM 500 000 0 0 0 0
4 Skip Truck Skip Truck Greater Letaba Greater Letaba TBC TBC Purchased skip truck GLM 1 200 000 0 0 0 0
Madumeleng/ Madumeleng/
Madumeleng/ Constructed sports
1 Shotong sports Shotong sports Greater Letaba TBC TBC GLM 5 500 000 0 0 0 0
Shotong complex
complex complex
155
Madumeleng/ Madumeleng/
Madumeleng/ Constructed sports
5 Shotong Sports Shotong Sports Greater Letaba TBC TBC MIG 13 300 000 9 486 057 0 0 0
Shotong complex
Complex Complex
Project Project Name Project Description Project Duration Five (5) Year Budget Source of Implementation
No. and Location Start Finish 2021/22 2022/23 2023/24 2024/25 2025/26 Funding Agent
Date Date
CSD-38 Grass cutting Purchase of Grass 01-07-2024 30-06-2026 R800 000 R800 000 OWN GTM
Machines cutting Machines
ESD-39 Power Generator for Installation of Power 01/07/2021 30/06/2022 R600 000 OWN GTM
Aqua Park Booster Generator for Aqua Park
Pump Station Booster Pump Station
ESD-40 Fleet Management Purchase of Fleet 01/07/2021 30/06/2022 R800 000 OWN GTM
System Management System
ESD-41 Waste removal truck Purchase of the Waste 01/07/2021 30/06/2023 R1 800 000 R1 800 000 OWN GTM
removal truck
ESD-42 1 x Trailer for traffic Purchase of 1 x Trailer 01/07/2021 30/06/2022 R270 000 OWN GTM
services for traffic services
ESD-43 Mayor’s vehicle Purchase of the Mayor’s 01/07/2021 30/06/2022 R750 000 OWN GTM
vehicle
ESD-44 Speaker’s vehicle Purchase of the Speaker’s 01/07/2021 30/06/2022 R750 000 OWN GTM
vehicle
ESD-120 Vehicle for Electrical Purchase of vehicle for 01/07/2021 30/06/2022 R450 000 OWN GTM
Department Electrical Department
156
Project Project Name and Project Description Project Duration Five (5) Year Budget Source of Implement
No. Location Funding on Agent
Start Finish 2021/22 2022/23 2023/24 2024/25 2025/26
Date Date
ESD-45 New ablution block, Construction of New ablution 01/07/2021 30/06/2022 R 1 000 000 OWN GTM
offices and storage block (4 x male and 4 female),
facility at Tzaneen offices and storage facility at
testing grounds Tzaneen testing grounds,
ESD-46 Nkowankowa testing Painting inside, floor tiles access 01/07/2023 30/06/2024 R1 500 000 OWN GTM
grounds gate and fence
ESD-119 Tzaneen testing grounds Painting inside, floor tiles, access 01/07/2023 30/06/2024 R1 500 000 OWN GTM
gate and fence
ESD-47 Toilet block and change New ablution block and change 01/07/2024 30/06/2025 R1 500 000 OWN GTM
rooms in parks rooms
ESD-48 Shiluvane and Mulati Carports and Guardroom and 01/07/2024 30/06/2025 R500 000 OWN GTM
library painting, tiling and repairs to
leaking roof
ESD-49 Public toilets in Tzaneen New floor tiles, painting, security 01/07/2024 30/06/2025 R700 000 OWN GTM
gates
ESD-50 Public toilets in Nkowa New floor tiles, painting, security 01/07/2024 30/06/2025 R200 000 OWN GTM
gates
ESD-51 Public toilets in Letsitele New floor tiles, painting, security 01/07/2024 30/06/2025 R200 000 OWN GTM
gates
ESD-52 New ablution block, Construction of New ablution 01/07/2024 30/06/2025 R1500 000 OWN GTM
offices and storage facility 4X male and female toilet.
facility at Nkowakowa Painting of existing wall, access
testing grounds gate and replacing tiles
ESD-53 Ablution block in Sanlam Construction of New ablution 01/07/2023 30/06/2024 R1 500 000 OWN GTM
centre block
ESD-54 New sleeping quarters at Construction of Sleeping quarters 01/07/2023 30/06/2024 R1 500 000 OWN GTM
Tzaneen dam and new kitchen
ESD-55 New sleeping quarters Construction of Sleeping 01/07/2023 30/06/2024 R1 500 000 OWN GTM
for electrical department quarters and new kitchen
ESD-56 New sleeping quarters at Construction of Sleeping 01/07/2023 30/06/2024 R1 500 000 OWN GTM
Georges valley treatment quarters and new kitchen
plant
ESD-57 New sleeping quarters at Construction of Sleeping 01/07/2023 30/06/2024 R1 500 000 OWN GTM
Nkowankowa plumbers quarters and new kitchen
workshop
ESD-58 New sleeping quarters at Construction of Sleeping 01/07/2023 30/06/2024 R1 500 000 OWN GTM
Tzaneen plumbers quarters and new kitchen
157
Project Project Name and Project Description Project Duration Five (5) Year Budget Source of Implement
No. Location Funding on Agent
workshop
ESD-59 New sleeping quarters at Construction of Sleeping 01/07/2023 30/06/2024 R1 500 000 OWN GTM
Letsitele water treatment quarters and new kitchen
works
ESD-60 Airfield fencing New concrete palisade fencing 01/07/2023 30/06/2024 R1 500 000 OWN GTM
ESD-61 Mechanical workshop Painting of the entire workshop, 01/07/2023 30/06/2024 R1 000 000 OWN GTM
revamping for heavy vehicles
and paving road to workshop
ESD-62 Diagnostic machine for Purchase of Diagnosis 01/07/2023 30/06/2024 R500 000 OWN GTM
the workshop and Mechanical and replacement of
replacement of hydrolicjack Hydrolicjack tools for the
& toolbox workshop
ESD-63 The chlorine dosage New installation 01/07/2023 30/06/2024 R300 000 OWN GTM
rooms for all water extracor fans for chlorine and
treatment plant sensors for chlorine
ESD-64 The chlorine dosage New installation extracor fans 01/07/2023 30/06/2024 R300 000 OWN GTM
rooms for all water for chlorine and sensors for
treatment plant chlorine
ESD-65 Concrete palisade fence Erection of concrete palisade 01/07/2021 30/06/2022 R2 000 000 OWN GTM
at Lenyenye cemetery fence at Lenyenye cemetery
ESD-66 Ablution block with Construction of ablution facility 01/07/2023 30/06/2024 R150 000 OWN GTM
change room at Lesedi at cemetery between Lesedi
Regional Cemetery Regional cemetery (Lenyenye)
(Lenyenye)
ESD-67 Storeroom with guard Construction of Storeroom with 01/07/2023 30/06/2024 R800 000 OWN GTM
house at Lesedi ablution at Lesedi Regional
Regional cemetery cemetery (Lenyenye)
(Lenyenye)
ESD-68 Environmental Impact Conducting Environmental 01/07/2023 30/06/2024 R400 000 OWN GTM
Study at Lesedi Regional impact study and monitoring
Cemetery (Lenyenye construction of the cemetery
ESD-69 Earthworks at Lesedi Mass excavation to remove 01/07/2023 30/06/2024 R1 000 000 OWN GTM
Regional cemetery unsuitable material & replacing it
(Lenyenye) with suitable material from
commercial sources including
compaction. conducting full
Environmental Impact study
ESD-70 Ablution with change Construction of ablution facility 01/07/2023 30/06/2024 R1 200 000 OWN GTM
room at Nkowankowa with change room
cemetery
158
Project Project Name and Project Description Project Duration Five (5) Year Budget Source of Implement
No. Location Funding on Agent
ESD-71 Earthworks with full Mass excavation to remove 01/07/2023 30/06/2024 R1 000 000 OWN GTM
Environmental Impact unsuitable material & conducting
Assessment study and Environmental Impact study
designs at Nkowankowa
cemetery
ESD-72 Agatha cemetery Fencing Agatha cemetery 01/07/2023 30/06/2024 R1 000 000 OWN GTM
extension at Tzaneen extension
ESD-73 Earthworks with road Mass excavation to remove 01/07/2023 30/06/2024 R1 000 000 OWN GTM
construction at Tzaneen unsuitable material
ESD-75 Guardroom at Nkowa Construction of new guard house 01/07/2023 30/06/2024 R500 000 OWN GTM
testing ground
ESD-76 Guardroom at Tzaneen Construction of new guard house 01/07/2023 30/06/2024 R500 000 OWN GTM
testing ground
ESD-77 Concrete palisade fence Erection of concrete palisade 01/07/2021 30/06/2022 R2 000 000 OWN GTM
at Nkowakowa cemetery fence at Nkowakowa cemetery
ESD-78 Fencing at Tzaneen Construction of new clear view 01/07/2023 30/06/2024 R1 600 000 OWN GTM
cemetery fencing
ESD-79 Archive storage at Construction of new archive 01/07/2023 30/06/2024 R1 200 000 OWN GTM
Tzaneen testing storage
ground
ESD-80 Heanertzburg library Construction of sleeping 01/07/2023 30/06/2024 R1 500 000 OWN GTM
sleeping quarters quarters and kitchen
ESD-81 Ablution facility at Construction of ablution facility 01/07/2023 30/06/2024 R800 000 OWN GTM
Tzaneen
ESD-82 Furniture for sport and Purchasing furniture for sport & 01/07/2023 30/06/2024 R300 000 OWN GTM
recreation facilities at recreation facilities
Juliesberg, Burgersdorp,
Runnymede, Lenyenye,
Nkowankowa
ESD-83 Clear view Fencing at Construction of Clear view 01/07/2024 01/06/2025 R1000 OWN GTM
Civic Centre and Fencing at Civic Centre and 000
Stores Stores
ESD-84 Civic centre roof Construction of civic centre roof 01/07/2021 30/06/2022 R3 500 000 OWN GTM
ESD-85 Civic centre building Upgrading of civic centre 01/07/2023 30/06/2024 R10 000 000 OWN GTM
building
ESD-86 Nkowakowa offices (Old Renovation of Nkowakowa 01/07/2022 30/06/2023 R800 000 OWN GTM
Home Affairs building) offices (Old Home Affairs
building)
ESD- Electricity connection at Electricity connection at 01/07/2022 30/06/2023 R500 000 OWN GTM
Runnymede Sport Runnymede Sport Facility
159
Project Project Name and Project Description Project Duration Five (5) Year Budget Source of Implement
No. Location Funding on Agent
Facility
Project Project Name and Project Project Duration Five (5) Year Budget Source of Implementati
No. Location Description Funding on Agent
Start Date Finish Date 2021/22 2022/23 2023/24 2024/25 2025/26
EED-87 Installation of High Mast Install Apollo lights 01-07-2021 30-06-2022 R650 000 MIG GTM
Lights at Nkowankowa
EED-88 Installation of High Mast Install Apollo lights 01-07-2021 30-06-2022 R650 000 MIG GTM
Lights at Petanenge
EED-89 Installation of High Mast Install Apollo lights 01-07-2021 30-06-2022 R650 000 MIG GTM
Lights at Zanghoma/
Mariveni
EED-90 Installation of High Mast Install Apollo lights 01-07-2021 30-06-2022 R650 000 MIG GTM
Lights at Moime and
Shikwambana
EED-91 Installation of High Mast Install Apollo lights 01-07-2021 30-06-2022 R650 000 MIG GTM
Lights at Lusaka
EED-92 Installation of High Mast Install Apollo lights 01-07-2021 30-06-2022 R650 000 MIG GTM
Lights at Sethong
EED-93 Installation of High Mast Install Apollo lights 01-07-2021 30-06-2022 R650 000 MIG GTM
Lights at Moleketla
EED-94 Installation of High Mast Install Apollo lights 01-07-2024 30-06-2025 R 1 100 000 MIG GTM
Lights at Xihoko
EED-95 Installation of High Mast Install Apollo lights 01-07-2024 30-06-2025 R 1 100 000 MIG GTM
Lights at Mandlakazi
EED-96 Installation of High Mast Install Apollo lights 01-07-2024 30-06-2025 R 1 250 000 MIG GTM
Lights at Burgersdorp
EED-129Installation of High Mast Install Apollo lights 01-07-2021 30-06-2022 R650 000 MIG GTM
Lights at Sunnyside 4-
way
Project Project Name and Project Description Project Duration Five (5) Year Budget Source of Impleme
No. Location Start Finish 2021/22 2022/23 2023/24 2024/25 2025/26 Funding on Agen
160
Project Project Name and Project Description Project Duration Five (5) Year Budget Source of Impleme
No. Location Date Date Funding on Agen
EED-97 Connections (Consumer New Electricity Connections 01-07-2020 30-06-2023 R10 000 000 R10 000 000 R10 000 000 Own (Service GTM
Contribution) (Consumer Contribution) Contributions)
EED- 98 Prepaid meters and Renewal Repairs and 01-07-2020 30-06-2024 R500 000 OWN GTM
infrastructure in phases maintenance on Prepaid meters
(Talana Politsi, Mieliekloof and infrastructure) in phases
and Tarentaalrand) (Talana Politsi, Mieliekloof &
Tarentaalrand)
EED-99 01-07-2023 30-06-2025 R1 000 000 R1 000 000 OWN GTM
Urban distribution Miniature substation Urban
networks distribution networks in phases
EED-100 11kv cables Tzaneen Replacing 11kv cables due to 01-07-2023 30-06-2025 R3 000 000 R3 000 000 OWN GTM
CBD in phases required increase in capacity
EED-101 2 x 15 MVA 66/11 Kv Replace 2 x 15 MVA 66/11 Kv 01-07-2022 30-06-2023 R5 000 000 OWN GTM
Transformers with 2 x 20 Transformers with 2 x 20 MVA
MVA at Tzaneen Main sub at Tzaneen Main sub Phase 1&2
Phase 1 and 2
EED- 102 11 kV and 33 kV Auto Replace 11 kV and 33 kV Auto 01-07-2020 30-06-2025 R1 500 000 R1 500 000 OWN GTM
reclosers per annum (x5) reclosers per annum
EED-103 Monitoring system on Install scada monitoring system on 01-07-2023 30-06-2025 R1 000 000 R3 000 000 OWN GTM
GTM electrical network GTM electrical network
EED-104 11kv Feeder from New 11kv Feeder from Western 01-07-2023 30-06-2025 R1 000 000 R3 000 000 OWN GTM
Western sub to Industrial sub to Industrial area
area
EED-105 Valencia 11Kv lines in Rebuilding of Valencia 11 kv lines 01-07-2023 30-06-2025 R0 R3 000 000 OWN GTM
phases
EED-130 Electricity connection at Installation of electricity connection 01-07-2021 30-06-2022 R500 000 OWN GTM
Runnymede Sport Facility
Project Project Name Project Project Duration Five (5) Year Budget Source of Implementatio
No. and Location Description Start Finish 2021/22 2022/23 2023/24 2024/25 2025/26 Funding Agent
Date Date
EED-106 Lenyenye Stadium Upgrading of Lenyenye 01/07/2022 30/06/2024 R2 000 000 MIG GTM
Phase 2 Stadium Phase 2
ESD-107 Runnymede Sport Construction of 01/07/2023 30/06/2024 R2 000 000 MIG GTM
Facility Phase 2 Runnymede Sport
161
Facility Phase 2
ESD – 131 Leretjeni Sports Construction of Leretjeni 01/07/2023 30/06/2024 R1 000 000 GTM
Complex Sports complex at
Leretjene village
ESD-108 Bulamahlo Construction of Bulamahlo 01/07/2023 30/06/2024 R2 000 000 MIG GTM
Community hall Community hall
Project Name Project Description Project Baselin Annual Annual Medium TermImplemen
Location e Performance Target Expenditure Framework ting
Indicator Agent
2021/202 2022/202 2023/202
2 3 4
Lorraine Development of designs Lorraine (Ward Designs Designs of Brickwall 9,800,00 - - MLM
community of community hall 12) complete community hall completed 0
hall d completed
Calais sports Construction of Calais Calais 80% % of sports field 20% 1,850,00 - - MLM
field sports field constructed 0
162
OTHER ASSETS
Project Project Project Baseline Annual Annual Medium Term Expenditure Implementi
Name Description Location Performance Target Framework ng Agent
Indicator
2021/202 2022/202 2023/202
2 3 4
Vehicles Purchasing of Municipalit 7 cars & one Number of vehicles 1 3,000,00 2,500,00 5,500,00 MLM
municipal y waste truck purchased compactor 0 0 0
vehicles
Air- Purchasing of Municipalit 30 air Number of air 15 250,000 200,000 200,000 MLM
conditioners Air- y conditioners conditioners
conditioners Purchased
Access Installing of Municipalit New Number of access 2 500,000 450,000 500,000 MLM
control access control y control equipment
equipment installed
Software Regular Municipality Software Software updated Software - 450,000 500,000 MLM
upgrading of updated updated
software
Office Purchasing of Municipality 3 Executive Number of office 20 tables and 1,000,00 850,000 900,000 MLM
furniture office furniture furniture purchased 70 chairs 0
Tables,3
ordinary tables,
65 high back
chairs,70 visitors
chairs
163
Plant and Purchasing of Municipality New Number of lawn 5 lawn 850,000 150,000 200,000 MLM
Equipment plant and movers purchased mowers&1
equipment (lawn generator
mowers)
Office Purchasing of Maruleng 2 printers , 2 Number of office 5 650,000 370,000 320,000 MLM
Equipment office equipment municipal microwaves equipment
purchased
Offices
PROJECTS
No Project name Project Description Local Location Performance indicator Implementi Budget Cost Estim
Municipality ng Agent
Ward/ Coordinates 2021/22 2022/23 2023/24 2024/25
Village
Lat Long
3 Review of the DRM DRM Plan review MLM Number of Disaster Risk MLM OPEX OPEX OPEX
Plan Management plan
reviewed
164
5.4.4.6 BA-PHALABORWA MUNICIPALITY: SOCIAL SERVICES PROJECTS 2021
KPA 2: Basic Services and Service Delivery
Project No. Project Cost Funding Project Cost Funding Project Cost Funding Project Proj
Parks Parks signage board 100 BPM Parks signage board 400 BPM Parks signage board 450 BPM Parks signage board Parks sig
board
Purchasing of nursery 34 BPM Purchasing of nursery 300 BPM Purchasing of nursery 350 BPM Purchasing of Purchasi
plants/ Greening plants plants nursery plants nursery p
165
Sector / KPA Operations and Maintenance Projects
Project No. Project Cost Funding Project Cost Funding Project Cost Funding Project Proj
Poles for fencing of 100 BPM Poles for fencing of 150 BPM
parks parks
Renovate traffic and 2 000 Own Renovate traffic and 2 000 Own
pedestrian system for pedestrian system for
road safety purpose at road safety purpose at
checkers to taxi rank checkers to taxi rank
Increase filing system 640 BPM Increase filing system 700 BPM
capability to National capability to National
compliance levels.- compliance levels.-
Purchase “zippel” Purchase “zippel”
systems systems
166
Sector / KPA Operations and Maintenance Projects
Project No. Project Cost Funding Project Cost Funding Project Cost Funding Project Proj
to be implemented as a
multi-year ongoing
project
Design and construct a 3 000 Own Design and construct a 3 000 Own Design and construct a
new drivers licence new drivers licence new drivers licence
testing and issue facility testing and issue facility testing and issue facility
and Disaster/ emergency and Disaster/ emergency and all applicable legal
control room and all control room all requirements
applicable legal applicable legal
requirements requirements
Procure and
Implement Draeger
167
Sector / KPA Operations and Maintenance Projects
Project No. Project Cost Funding Project Cost Funding Project Cost Funding Project Proj
evidential breath
analyzer unit
Establish
Traffic Ve
Pound
Electricity Replacement of old 12 000 BPM Replacement of old 10 000 BPM Replacement of old 10 000 BPM
11kV underground 11kV underground 11kV underground
cables cables cables
Installation of remote 4 000 BPM Installation of remote 4 000 BPM Installation of remote 4 000 BPM
control in Substations control in Substations control in Substations
168
Sector / KPA Operations and Maintenance Projects
Project No. Project Cost Funding Project Cost Funding Project Cost Funding Project Proj
169
Sector / KPA Operations and Maintenance Projects
Project No. Project Cost Funding Project Cost Funding Project Cost Funding Project Proj
Roads Upgrading of Zorba 350 Own Rehabilitation Of 2 200 Own Upgrading of HI-Q 800 Own
Phosphate Street in Parking area from tar
Parking area from Tar
Ward 01 to pavement blocks
to pavement blocks.
Roads And Storm 3 200 Own Rehabilitation Of 3 500 Own Rehabilitation Of 3 750
Water Master Plan Desmond Tutu Street Asibasabi Street in
in Ward 01 Ward 07
170
Sector / KPA Operations and Maintenance Projects
Project No. Project Cost Funding Project Cost Funding Project Cost Funding Project Proj
Building Palisade fencing at 400 Own Pallisade fencing at 1 200 own Pallisade fencing at 4 500 own
Namakgale entrance park White house offices. Namakgale cemeteries
Total 27 209
171
5.4.4.7 DEPARTMENT OF SPORT, ARTS AND CULTURE: MOPANI DISTRICT INFRASTRUCTURE PROJECTS
N Project Name Project Local Location Performance Implementin Budget Cost Estima
o Description Municipality Indicator g Agent
Ward/Village Coordinates 2021/22 2022/23 2023/24 2024/25 202
Lat Long
1 Runnymade Building of New Greater Tzaneen N’wamitwa N/A N/A Building of New DSAC (IDT) 9 845 873 0 0 0
Library Libraries Village Libraries
2 Timamogolo Upgrading of Maruleng Tickline Village N/A N/A Upgrading of DSAC 500 000 0 0 0
Modular Lib.. libraries libraries (DPWR&I)
3 Muyexe Maintenance of Greater Giyani Muyexe Village N/A N/A Maintenance of DSAC 620 000 0 0 0
Library existing libraries existing libraries (DPWR&I)
4 Makhuva Maintenance of Greater Giyani Makhuva Village N/A N/A Maintenance of DSAC 460 000 0 0 0
Library existing libraries existing libraries (DPWR&I)
5 Metz Library Maintenance of Maruleng Metz Village N/A N/A Maintenance of DSAC 300 000 0 0 0
existing libraries existing libraries (DPWR&I)
PROJECTS
172
No Project name Project Description Local Location Performa Implementi Budget Cost Estimate
Municipal nce ng Agent
ity Ward/ Coordinates indicator 2021/22 2022/23 2023/24 2024/25 2025/2
4 D.Z.J. Mtebule Construct 28 classrooms, Medium Greater -23,88575 30,298931 IDT 2 000 8 1 250 1 25
Secondary Admin block, septic tank, steel
173
palisade fence. Refurbish 2 x 4
classrooms blocks and 1 x 2
classroom block with the Principal
Office, 2 x 12 seats waterborne
toilets. Demolish 2 classrooms. Drill
equip borehole and provide 80KL
water storage tanks. Refurbish 34
waterborne toilets Tzaneen 000 7 750
14 Hipambukile Construct 14 ordinary enviroloos, 6 x Greater - 30,334316 The Mvula 4 000 3 600 0 0
Primary Grade R waterborne toilets, new
175
Septic tank, Steel Palisade fence and
Guard House. Refurbish 18 available
enviroloos. Refurbish existing
borehole and provide 35KL water
storage. Demolish 7 pit toilets Giyani 22,777377 Trust 400
176
19 Kgopsane 0 0
Primary Refurbish 2 x 5 and 1 x 3 classroom Ba-
(Multigrade block classroom blocks infested by Phalabor -
Teaching) temites (Replace roof structures). wa 23,932309 31,044394 ITRU 3 500 6 000 500
177
24 Construct 25 ordinary enviroloos, 6 x 0 0
Grade R waterborne toilets and a
new septic tank. Refurbish existig
borehole and provide 20KL Water
storage tanks. Demolish 20 plain pit Greater
Khopo Primary toilets Tzaneen -23,97217 30,287319 LDoE 1 900 1 900 200
178
tank. Demolish 4 classrooms and
29 Laerskool Dr 0 0
Annecke Construct 12 classrooms. Demolish Greater -
Primary 12 asbestos classrooms. Tzaneen 23,891115 30,389938 ITRU 2 000 5 600 400
179
32 Construct 24 ordinary enviroloos, 7 x 0 0
Grade R waterborne toilet, a new
septic tank, steel palisade fence and
guard house. Refurbish 10 existing
enviroloos. Upgrade existing The
borehole and provide 35KL water Greater Mvula
Lerale Primary storage tanks. Demolish 12 pit toilets Letaba -23,524327 30,61091 Trust 4 000 3 600 400
33 Lorraine Banareng 1 0 0
Primary Construct Medium Admin block Maruleng -23,40325730,225746 IDT 1 000 850 150
181
toilets
42 Construction of 4 classrooms, 0 0
Medium Admin block, 4 new
waterborne toilets for educators,
Septic tank. Erect Steel Palisade
fence. Refurbish 9 classrooms, and 20
enviroloos. Demolish 12 pit toilets,
Makgopele storeroom. Refurbish borehole and Greater - 7
Secondary provide 30KL water storage tanks Letaba 23,429097 30,560379 LDPWR&I 2 000 000 5 250
182
43 The 0 0
Malenga Upgrade Water Supply system and Greater Mvula
Secondary renovate 34 Waterborne toilets Letaba -23,37048 30,51793 Trust 3 000 1 750 250
183
48 Construct 14 classrooms, Medium 0 0
Admin block, and 8 additional toilets
for learners plus 6 waterborne toilets
for educators. Erect Steel Palisade
Fence. Refurbish 12 classrooms,
existing 36 enviroloos, borehole and
provide 40KL water tanks. Demolish 3
Matimu classroom block, 2 x tank houses, and Greater - 7
Secondary 20 seats plain pit toilets. Tzaneen 23,926303 30,241846 LDPWR&I 2 000 000 5 250
184
provide 15KL tanks. Demolish 14
plain pit toilets.
185
equip borehole and provide 30 KL
water storage tanks. Demolish 7 pit
toilets
186
provide 5KL water storage. Demolish
24 pit toilets
187
64 Construct 1 x 3 classroom 1 50
block,Medium Admin block, 1 x
Multipurpose classroom, Steel
Palisade Fencing, septic tank.
Refurbish book store, 12 classrooms.
Demolish elevated PVC tank. Drill
Napsadi and equip borehole and provide 40KL - 9
Secondary water storage tanks Maruleng 24,284121 30,454113 LDPWR&I 2 000 000 9 000 1 500
65 Construction of 18 ordinary 0 0
classrooms, 2 x Grade R facilities,
Medium Admin block, 16 additional
Waterborne toilets for learners, 8
waterborne toilets for educators.
Ndzalama Demolish 15 classrooms, Makeshift Greater - 7
Primary Admin office & Shack. Giyani 23,308379 30,703814 IDT 2 000 000 6 200
67 Nkomo Goxani Construct 10 0rdinary classrooms, 2 x Greater - 30,720833 IDT 2 000 6 000 0 0
Primary (new Grade R facilities, Medium Admin Giyani 23,319444 5 300
School) block, Septic tank, Steel Palisade
188
fence, 20 enviroloos, 1. Drill
borehole and provide 30KL water
storage tanks.
190
Grade R facilities, Medium Admin
block. Refurbish 2 x 2, 2 x 4 classroom
blocks. Demolish 2 x 5 classroom Phalabor
Primary blocks. wa 23,936451 400
192
86 Construct 12 Classrooms, 2 x Grade R 0 0
facilities, Medium Admin block, 14
additional enviroloos for learners and
5 waterborne toilets for educators,
Septic tank. Refurbish 10 enviroloo
toilets. Demolish 13 classrooms, and
15 pit toilets. Upgrade Fence to steel
Palisade . Refurbish borehole &
Runnymede provide 30KL water tanks. Relocation Greater
Primary of 12 mobile classrooms Tzaneen -23,65506 30,44121 LDPWR&I 1 900 1 900 200
90 Thabisong Construct 13 ordinary enviroloos, 7 x Greater -23,424307 30,607187 The 2 000 8 000 0 0
Primary Grade R waterborne toilets, new Letaba Mvula 4 250
septic tank, steel palisade fence and Trust
193
guard house. Refurbish 20 enviroloos.
Upgrade existing borehole and
provide 35KL water storage tanks.
195
98 Construct 16 Ordinary Classrooms, 3 1 25
x Grade R facilities,16 extra
Waterborne toilets, Refurbish
existing 8 classrooms and 26 Greater - 8
Unity Primary Waterborne toilets Tzaneen 23,842297 30,170162 IDT 2 000 000 7 750 1 250
101 Xihoko Construct 5 ordinary enviroloos 4 x Greater -23,66433 30,50164 The Mvula 2 000 9 1 000 0
Primary waterborne Grade R toilets & septic Tzaneen Trust 000 8 000
tank. Upgrade borehole and provide
10KL water storage tank. Refurbish
196
existing 11 enviroloos
No Project name Project Local Location Performance indicator Implementing Budget Cost Estimate
Description Municipalit Agent
y Ward/ Coordinates 2021/22 2022/23 2023/24 2024/25 2025/2
Village
Latitude Longitude
1 0-30 days Citizen Mopani Dist. District- N/A N/A Number of Births Main Offices health 462 000 485 100 509 355 534 823 561 56
Birth Documentation Municipality wide Registered within 30 days. facilities and mobile
Registration. offices
Citizen Number of Smart ID Card
Documentation applications captured Main Offices and
Mopani Dist. District-
2 Mobile Offices
Smart card ID Municipality wide
applications N/A N/A 462 000 485 100 509 355 534 823 561 56
197
Hospital Technology: Enabling Works Program (LIM333)
Evuxakeni Evuxakeni Hospital: Replacement of Greater Giyani Giyani DOH 14 000 14 840
7
Hospital Hospital (LIM331) 000 000 0
198
Grace Mugodeni Clinic: Alternative GTM DOH
11 Grace Mugodeni back up power supply & Related Greater Tzaneen
CHC Infrastructure services (LIM333) 0 0 0
199
Letaba Hospital A4_Health DOH
21 Technology: MCCE and NeoNatal Greater Tzaneen GTM
Letaba Hospital Facilities (LIM333) 0 0 0
200
Items
39 Loloka Clinic Loloka Clinic_New Clinic: 2nd Greater Giyani GGM DOH 0 0 0
201
Contractor (Building Contract) (LIM331)
202
existing on a new site (LIM331)
New Nkhensani Nkhensane hospital_Upgrade NeoNatal Greater Giyani DOH 15 700 20 140
52 GGM
Hospital facilities. MCCE Phase B (LIM331) 000 000 0
203
a new site
Sekororo DOH
60 MLM
Hospital Sekororo Hospital_Staff Accommodation Maruleng (LIM335) 0 0 0
204
5.4.4 11 DEPARTMENT OF SOCIAL DEVELOPMENT
1 Dzumeri One Stop Centre Office accommodation GGM Dzumeri DSD 25 000 000 0 0 0
2 DSD District Offices Office accommodation GGM Giyani DSD 30 000 000 0 0 0
3 Xihoko One Stop Centre Office accommodation GTM Tzaneen DSD 25 000 000 0 0 0
No Project name Project Description Local Location Performa Implemen Budget Cost Esti
Municipality nce ting
Ward/ Coordinates indicator Agent 2021/22 2022/23 2023/24 2024/25
Village
Lat Long
Programme: EPIP
1 Lebaka Land The project will be focusing mainly on the GLM DEFF 10 000 0 0 0
Restoration restoration of land and rehabilitating areas 000
affected by soil erosion due to rain and
overgrazing that took place in the area. The
rehabilitation will include various methods of
205
intervention for the prevention of soil erosion.
The deliverables of the project will include
sloping of dongas, re-vegetation (planting of
grass and indigenous trees) rock packing and
controlling bush encroachment. The total area
for land rehabilitation is 500ha.
NRM
4 NRM LM Bahlako Ipp Alien Plant Clearing Project DEFF 1 567 844 0 0 0
Land use incentive_2
5 NRM LM Gravellotte_2 Alien Plant Clearing Project BPM Gravelotte DEFF 1 153 854 0 0 0
8 NRM SANP K2C Alien Plant Clearing and Land Rehabilitation DEFF Not
206
Rehab_2 Project indicated
9 NRM SANP WfE KNP Alien Plant Clearing Project DEFF Not
Buffer_2 indicated
10 NRM SANP WfE KNP Alien Plant Clearing and Land Rehabilitation DEFF Not
Nxanatsene Rehab_2 Project indicated
13 NRM LM WoF Giyani Fire Control and Prevention GGM Giyani DEFF Not
Fire Base indicated
14 NRM LM WoF Fire Control and Prevention MLM Hoedspruit DEFF Not
Sekororo Fire Base indicated
15 NRM LM WoF Fire Control and Prevention GTM Tzaneen DEFF Not
Tzaneen Fire Base indicated
16 NRM WOF LP SpecialHigh Altitude Alien Clearing Project GTM Lenyenye DEFF Not
Project Lenyenye 1 1 indicated
17 NRM WOF LP SpecialHigh Altitude Alien Clearing Project GTM Lenyenye DEFF Not
Project Lenyenye 2 indicated
18 NRM WOF LP Special High Altitude Alien Clearing Project GTM Nkowanko DEFF Not
Project Nkonwakowa 1 wa indicated
19 NRM WOF LP Special High Altitude Alien Clearing Project GTM Nkowanko DEFF Not
Project Nkonwakowa 2 wa indicated
207
5.4.4.13 DEPARTMENT OF ENVIRONMENTAL AFFAIRS
PROJECTS
No Project name Project Description Local Location Performance Implementin Budget Cost Estimate
Municipali indicator g Agent/
ty Ward/ Coordinates Funder 2021/22 2022/23 2023/24 2024/25 2025
Village
Lat Long
1 LP- Establishment of community nature Greater Nkomo N/A N/A Nature Department of 15 000 0 0 0
Mahumane reserve adjacent to the KNP. The Giyani LM village Reserve Environment, 000
Nature reserve requires an electrified game Forestry &
Reserve reserve, roads, water reticulation. Fisheries
2 LP-Hihanyile The project aims to expand the xisting Greater Ngove N/A N/A Essential oils Department of 5 000 000 0 0 0
Essential Oil cultivation & processing of Lippia Giyani LM village and mosquito Environment,
Development javanica for essential oils and mosquito repellent Forestry &
repellent candles in Giyani candles Fisheries
3 LP-Vahlave Establishment of lodge Greater Ngove N/A N/A Nature Department of 20 000 0 0 0
Community accommodation for 100 guest; Giyani LM village Conservation Environment, 000
Conservation environmental education centre, Area Forestry &
Project construction of 5 lecture halls and Fisheries
environment resource centre, nursery
3 ha growing of indigenous trees, 5
borehols, erection of 40km fence, 22
strands electric fence, paving of area
from the access gate to the reception,
picnic site, construct visitors
information centre, construct 5km
access road, construct security gate,
208
bicycle track of 10km within the gate
reserve, establishment of 10km hiking
track electricity, upgrade reticulation
and installation of solar energy system
with gysers, air conditioning &
reticulation.
4 LP-Serala Construction of security guard room & Greater Greater N/A N/A Environmenta Department of 25 000 0 0 0
Community the guest house, fencing of camping Letaba LM Letaba l Environment, 000
Property site, installation of gate at Serala and LM Management Forestry &
Association western side of Wolberg Nature and Fisheries
Reserve, construction of information Conservation
centre for tourists, rehabilitate the
mountain club houses, construct hiking
trails, pave 15km road to mountain
club, debushing and construction of a
bridge from George’s valley to Letaba
river, rehabilitation of Rerala CPA
wetland, reticulation of water and
electricity for bush camps and all the
surrounding facilities within Wolkberg
Nature Reserve and Resala CPA
5 LP- Upgrading of 21 km hiking trails around Greater Modjad N/A N/A Modjadji NR Department of 15 000 0 0 0
Modjadji the reserve and construction Tzaneen ji infrastructure Environment, 000
Infrastructu viewpoints, excavation of the dam and LM Nature updgraded Forestry &
re Project grading of the road for tourists. Signage Reserv Fisheries
will also be upgraded along the tourist e
road and hiking trails. construction of
staff cottages; construction of 9
cottages personel with one bedroom,
209
bedroom & a kitchen/ dining room
with bricks and corrugated iron sheets.
The cottage will be equipped with
kitchen unit, solar geyser and built-in
wardrobe and bath set; the fencing of
26km in Modjadji project, erection of
game fence with one sliding tourist
gate. Te fencing will require a bonnox
on 1.8m high x 100m length, with 50m
interval between, 2 fence posts, 10
standard posts and 22 droppers. The
fence will require 2126 angle strut, 43
corner posts, 1040 fencing posts, 5200
standard posts and 11440 droppers.
6 LP-Convertion Conversion of illegal dumping areas to Greater Giyani N/ N/A Recreational Department of 5 020 000 0 0 0
of Illegal recreational parks which include Giyani LM A Park Environment,
Dumping benches, swings, coffee shop, jungle Forestry &
Areas to gym, fencing, irrigation, tree planting, Fisheries
Recreational utilizing solar energy, vegetable
Parks gardens & umbrellas
7 LP- Development of recreational park with Greater Nwamit N/ N/A Recreational Department of 15 000 000 0 0 0
Development the required amenities and green both Tzaneen wa A Park Environment,
& Greening Khalanga Lodge and Valoyi Vatsonga LM village Forestry &
the Area Cultural Village. Fisheries
Between
Khalanga
Lodge & Valoyi
Vatsonga
8 LP-Lebaka Rehabilitation of land through control Greater Lebaka N/ N/A Rehabilitated Department of 10 000 000 0 0 0
210
Land of soil erosion and gabion construction Letaba A land Environment,
Restoration (Enhancing soil structure and function). LM Forestry &
Fisheries
212
STRATEGIC OBJECTIVE: To create an enabling environment for sustainable economic growth
PROJECT/PROGRAM 2021/22 2022/23 2023/24 2024/25 2025/26 SOURCE
1. LED SUPPORT R 1,040,000 R1,040,000 R1,140,000 0 0 GGM
2. RAND Easter Show R60,000 R0 R0 0 0 GGM
3. African travel Indaba R0 R0 R0 0 0 GGM
4. Siyandhani Airport Development R0 R0 R0 0 0 GGM
5. Shangoni Gate Development R0 R0 R0 0 0 GGM
6. Female entrepreneur awards R 245,000 R245,000 R245,000 0 0 GGM
7. Review of LED strategy R800,000 R0 R0 0 0 GGM
8. Marula show R60,000 R60,000 R60,000 0 0 GGM
9. Mopani dimension stones R0 0 0 0 0 GGM
10. Municipal internal signage R20 000 R0 R0 0 0 GGM
5.4.5.3 Maruleng Local Municipality: LED
Project Project Description Project Baselin Annual Annu Medium Term Expenditure Implementi
Name Location e Performance al Framework ng Agent
Indicator Target
2021/2021 2022/202 2023/202
3 4
K2C Provision of support Hoedspruit 3 Number of K2C 4 200,000 208,400 217,569.6 MLM
Support of K2C Biosphere programmes 0
Ward 1
supported
LED Provision of support Municipal 8 Number of LED 8 150,000 156,300 163,177.2 MLM
Programme to LED initiatives area programmes 0
s and programmes supported
EPWP Job creation through Municipal 500 Number of work 50 1,175,000 - - MLM
213
EPWP area opportunities created
through EPWP
LED Co-ordinate of LED Maruleng New Number of LED 4 OPEX OPEX OPEX MLM
forums forums area forums coordinated
Project Project Cost Funding Project Cost Funding Project Cost Funding Project Projec
No.
(R’000) (R’000) (R’000)
214
Cluster Sector / KPA Operations and Maintenance Projects
Project Project Cost Funding Project Cost Funding Project Cost Funding Project Projec
No.
(R’000) (R’000) (R’000)
Total 2 550
Project Name Project Location Medium Term Expenditure Framework Implementing Agent
2021/2022 2022/2023 2023/2024
215
SMME Support GLM R615 008 R615 639 R616 327 GLM
Review LED Strategy GLM R690 000.00 R200 000 GLM
Commercialisation of Sickle-Bush (Moretse) GLM R750 000.00 GLM
No Project name Project Description Local Location Performance Impleme Budget Cost Estima
Municipality indicator nting
Ward/ Coordinates 2021/22 2022/232023/242024/25
Agent
Village 202
Latitude Longitude
1 GRASP 4 Construction of Ba-Phalaborwa Selwane Various Various Black producers LDARD 1,765 0 0 0
6x1ha shade net and Priska supported with
projects infrastructure
Makgoba Development of Mopani DM District- -23.445942 30.578722 Westfalia & LDARD 20 mil 0 0 0
development Avocado production wide Avocado association
fields of South Africa
216
2 GRASP 5 Construction of 4 Ba-Phalaborwa Priska & Various Various Black producers LDARD 489 0 0 0
x1ha shade net Gravellote supported with
projects infrastructure
4 Exlite Repairing of Greater Deerpark 23.76373 30.22779, Black producers LDARD 553 553 0 0
shade nets Tzaneen supported 5with
infrastructure
5 Ratsatsi 5ha drip Greater Moifontein 30°15'35'' 23° 25'22'' Black producers LDARD 3,900 400 0 0
irrigation, 18ha Letaba supported with
fence and infrastructure
reservoir
6 Mabodyane Water source Greater Mohlele S 232788.83 E 303550.50 Black producers LDARD 500 2,500 0 0
development and Letaba supported with
pack shed infrastructure
7 A Hi Tirheni Energy source Greater Daniel Black producers LDARD 1,560 156 0 0
Mqekwa and reservoir Giyani Rabalela supported with
infrastructure
8 Commitment Water source and Maruleng Mentz Black producers LDARD 500 1,500 0 0
Club construction of supported with
2x2 000 Poultry infrastructure
houses
9 ShaiShai Water source and Maruleng Trichadtsdal 24° 09' 10'' 30° 23' 59'' Black producers LDARD 500 3,000 300 0
irrigation supported with
217
materials infrastructure
11 Baleti 5ha irrigation Greater Modjadjis Black producers LDARD 500 5,000 500 0
materials, Letaba kloof supported with
Estates
macadamia infrastructure
development, pack
shed and ablution
12 Goodstuff Water source and Maruleng Molalane 23,1308480S29,0992080S Black producers LDARD 500 1,500 0 0
Construction of 2x2 supported with
000 PHs infrastructure
13 Procure day old Maruleng Various 24°182674" 30° 3033457'' Black producers LDARD 315 000 0 0 0
chicks, feeds and villages supported with
medication production inputs
17 Greater Tzaneen Procure 5000 broiler Greater Various 23.64523 30. 14563 Black producers LDARD 0 0 0
feeds and supported with
218
poultry projects medication Tzaneen villages production inputs 1 000 000
18 Maruleng Procure seeds, Maruleng Various 24,13443 30,2349 Black producers LDARD 700 000 0 0 0
vegetable food seedlings, fertilizers villages supported with
security projects and Agro chemicals production inputs
20 Greater Giyani Procure seeds and Greater Various Black producers LDARD 700 000 0 0 0
seedling, fertilizers Giyani villages supported with
vegetble projects
& chemicals production inputs
required
21 Ba-Phalaborwa Procure vegetable Ba- Various 23,70'19 30'96'03 Black producers LDARD 2 200 000 0 0 0
vegetable seeds/seedlings, Phalaborwa villages supported with
projects fertilizers production inputs
&pesticides
22 Greater Letaba Procure Vegetable Greater Various S23028,135’ DALRRD Black producers LDARD 1 830 000 0 0 0
vegetable seeds/seedlings and Letaba villages supported with
projects pesticides production inputs
23 Greater Tzaneen Procure Vegetable Greater Various 23.45161 30.1441 Black producers LDARD 1 400 000 0 0 0
vegetable seeds/seedlings and Tzaneen villages supported with
projects pesticides production inputs
24 Maruleng Grain Ploughing and Maruleng 24,23358 30,23539 Black producers LDARD 307 500 0 0 0
Projects procurement of Various supported with
seeds villages production inputs
25 Greater Giyani Ploughing & Greater Various Black producers LDARD 307 500 0 0 0
Grain projects procuring 1x10kg Giyani villages supported with
maize seeds for 441 production inputs
farmers
26 BaPhalaborwa Ploughing, seeds, Ba- Various 23˚41'37" S 30˚55'39" E Black producers LDARD 780 100 0 0 0
219
dryland farmers fertilizers & Phalaborwa villages supported with
chemicals production inputs
27 Greater Letaba Ploughing, seeds, Greater Various -23,35771 30,14903 Black producers LDARD 590 300 0 0 0
grain projects fertilizers & Letaba villages supported with
chemicals production inputs
28 Greater Tzaneen Ploughing, seeds, Greater Various S24˚06'24" E30˚17'14" Black producers LDARD 858 000 0 0 0
grain projects fertilizers & Tzaneen villages supported with
chemicals production inputs
30 Greater Tzaneen Procure piggery Greater Various 23.4643 30.4071 Black producers LDARD 0 0 0
piggery projects feeds and Tzaneen farms supported with
medication production inputs 119 000
31 Maruleng food Procure seeds, Maruleng Bochabelo 30° 34'30'' Black producers LDARD 410,00 0 0 0
security seedlings, fertilizers 24°23'38" supported with
vegetable cluster and Agro chemicals production inputs
32 Greater Tzaneen Poultry Greater Masoma 24.05644 30.16731 Black producers LDARD 499 500 0 0 0
food security Tzaneen Village supported with
poultry projects production inputs
33 Greater Tzaneen Procure seeds, Greater Nyanyukani S23˚57'45" E30˚22'24" Black producers LDARD 132 000 0 0 0
food security seedlings, fertilizers Tzaneen supported with
vegetable projects and Agro chemicals production inputs
34 Mopani Govt. Operation & All local Prioritised Hectares planted LDARD 1 000 000 0 0 0
Tractor Fleet maintenance of municipalities villages and for food production
support government tractor projects
220
fleet.
35 Mopani Fetsa Hiring of 100 All local Proritised Hectares planted LDARD 0 0 0
tlala– private tractor municipality villages and for food production
operators for projecits
mechanization
ploughing 2000ha 3 212 000
1 Broadband Broadband fibre rollout Mopani Dist. Municipality Mopani N/A N/A Number of Kms of fibre rolled out Limpopo 11.3m 0
Connexion
1 100 Thousand young Initiative targeting young people between the ages of 16 and 40 with Targeted DSBD Not indicated
entrepreneurs businesses with the potential to create a minimum of 10 sustainable jobs beneficiaries - 2400
2 SMME expansion/ scale Initiative targeting small and medium enterprises that have been in Targeted DSBD Not indicated
up existence for more than 4 years and employ more than 5/10 staff beneficiaries - 4100
members. It supports businesses to scale up and expand through access to
working capital and markets for goods and services
3 Township and rural A dedicated programme to transform and integrate opportunities in Targeted DSBD Not indicated
221
entrepreneurship townships and rural areas into productive business ventures. beneficiaries - 11592
4 Incubation and digital Business and technology incubation centres that offer enterprises Targeted DSBD Not indicated
hubs business and management skills, support and platforms for a minimum of beneficiaries - 4
3 years. It targets start-ups that require hand holding as they start their
journey in business.
5 Cooperatives Initiative aimed at supporting cooperatives as enterprises that are income Targeted DSBD Not indicated
and profit generating. It targets registered cooperatives that have beneficiaries - 240
potential to generate income and profit.
6 Informal businesses Initiative aimed at supporting informal businesses with compliance Targeted DSBD Not indicated
support, business skills development, business infrastructure and beneficiaries – 23184
technical support.
7 SMME products Initiative to coordinate and direct the buy local campaign to be Targeted DSBD Not
impactful by targeting a minimum number of enterprises that should beneficiaries - 4420 indicated
benefit.
8 Start-up nation Initiative that seeks to promote innovation that can have a ripple effect Targeted DSBD Not
on the national economy. Target beneficiaries are Tech and Engineering beneficiaries - 8840 indicated
Start-ups and Social enterprises
1 Greater Giyani grain projects Grains (Maize). Active and being supported with GGM Mhlava willem, Hlaneki, DALR&RD 400,000 0 0 0
production inputs. Estimated beneficiaries is 131. Guwela SC
2 Greater Tzaneen grain Grains (Maize). Active and being supported with GTM Ritavi, Nwamitwa, DALR&RD 389,828 0 0 0
projects production inputs. Estimated beneficiaries is 404. Tzaneen &Naphuno
3 Ba-Phalaborwa grain Grains (Maize). Active and being supported with BPM Selwane, Namakgale, DALR&RD 743,110 0 0 0
222
projects production inputs. Estimated beneficiaries is 752. Gravelotte
RID PROJECTS
4 Muyexe pavings street Muyexe pavings street GGM Muyexe DALR&RD 46,368,646 0 0 0
COED PROJECTS
RLCC PROJECTS
223
10 Mawayi family Finalisation of land claims DALR&RD 417 748 98 0 0 0
MDM; LMs, LDARD, DRDLR, LEDA, National DEPT of Small Business Development, National Dept of Public enterprise
No Project name Project Description Local Location Performance Implementi Budget Cost Estim
Municipality indicator ng Agent
Ward/ Coordinates 2021/22 2022/23 2023/24 2024/25
Village 2025
Latitude Longitude
1 Infrastructure Provision of water Ba-Phalanorwa 23 58 31 47 3.2 mil 2.5 mil 2.5 mil 0
through drilling of 3.9642 06.2442 E
boreholes
2 Infrastructure Upgrading of access road Maruleng 24 09 30 12 2.2 mil 1.25 mil 2 mil 0
to Makhutswi camp & 52.617S 39.1716E
rehabilitation of Timber
deck of tourist challets.
Strategic Objective: To have efficient, effective, economic and integrated use of land space.
225
No Project Name Project Description Location/ Target to achieve Funder Budget Costing Estimates
Ward
2021/22 2022/23 2023/24 2024/25 2025/26
DEVELOPMENT PLANNING
1 SDF Review To review district Spatial Development MDM Draft reviewed MDM 1 000 000 1 000 000 0 1m 0
Framework SDF document
2 Determination of To determine land use applications, cater and GLM, MM 10 land use MDM 1 000 000 1 000 000 0 1m 1m
Land Use pay tribunal members not in the employ of the and BPM applications
applications participating municipalities of sitting allowances, determined
travel expenses, meeting venue and
accommodation
3 Selwane Township To produce layout plan and general plan for 500 BPM 200 sites layout MDM 800 000 0 0 0 0
establishment sites at Selwane Town (village) extension plan & gen. plan.
4. Humulani/ Matiko- To produce layout plan and general plan for BPM 200 sites layout MDM 0 0 0 0
xikaya township 500 sites at Matikoxikaya/ Humulani extension. and general plan
800 000
establishment
6 Xivulani Township To produce a layout plan and general plan for GGM 200 sites layout andMDM 800 000 0 0 0 0
establishment 500 sites at Xivulani extension general plan
7 Nwamitwa Township To produce layout plan and general plan for GTM 200 sites layout andMDM 800 000 0 0 0 0
establishment 2000 sites at Nwamitwa extension general plan
8 Xihoko Township To produce layout plan and general plan for GTM 200 sites layout MDM 800 000 0 0 0 0
establishment 2000 sites at Xihoko extension and general plan
226
Geographical Information Services (GIS)
No Project Name Project Description Location Target to achieve Funder Budget Costing Estimates
/Ward
1 Land Information The development of Land MDM Land Information MDM 832 400 0 0 900 00 960 000
Management System Information Management System Management System
Application
2 Town Planning Application The development of Town MDM Town Planning MDM 1 900 000 0 0 700 000 500 000
Management System Planning Application Application Management
Management System System
3 Infrastructure Management The development of MDM Infrastructure MDM 0 0 0 700 000 500 000
System Application Infrastructure Management Management System
System Application Application
4 Disaster Management System The development of Disaster MDM Disaster Management MDM 0 2 090 1 309 800 000 600 000
Application Management System Application System Application 992 000
5 IDP Dashboard System The development of IDP MDM IDP Dashboard System MDM 0 0 570 000 600 000 200 000
Application Dashboard System Application Application
6 GIS Awareness GIS Awareness MDM GIS Awareness MDM 0 0 0 80 000 60 000
7 GIS Maintenance GIS maintenance MDM Software Maintenance MDM 0 0 0 235 216 245 263
8 Corporate GIS establishment MDM Upgrade GIS infrastructures, MDM 0 0 0 450 000 1 450
licenses, upgrades of GIS
227
software and GIS hardware. 000
9 Project Document Development of Project MDM Project Document MDM 0 860 000 200 000 0 0
Management System Document Management System Management System
Application Application Application
Project Project Description Project Baselin Annual Performance Annual Medium Term Expenditure Implemen
Name Location e Indicator Target Framework ting
Agent
2021/2022 2022/2023 2023/2024
SDF Implementation of the Municipalit Reviewed Number of SDF 1 OPEX OPEX OPEX MLM
reviewed SDF y SDF implemented
Update of Updating of Land Use Municipalit 30days Turnaround time in 30days OPEX OPEX OPEX MLM
LUMS Management Scheme y processing land use
to address land usage applications from the date
228
and expansion in the received
municipality
90 days Turnaround time in 90 days OPEX OPEX OPEX MLM
processing building plans
from the date submitted
Update of Updating of new Municipalit 4 Number of GIS updates 4 OPEX OPEX OPEX MLM
GIS information in the GIS y conducted
The effectiveness of a tribunal will ensure compliance with SPLUMA and reduce the risk of litigations
Project Project Cost Funding Project Cost Funding Project Cost Funding Project Projec
No.
(R’000) (R’000) (R’000)
Sustainable Property Vesting Transfer of 1 500 Transfer of Properties 3000 Transfer of Properties 3000 Transfer of 3000
integrated Properties Properties
infrastructure
Property Valuation Supplementary 100 Supplementary valuation 100 General Valuation roll 2 300 Supplementary 100
and services
valuation roll roll 000 valuation roll
229
Cluster Sector / KPA Operations and Maintenance Projects
Project Project Cost Funding Project Cost Funding Project Cost Funding Project Projec
No.
(R’000) (R’000) (R’000)
Land Use Develop layout plans 500 formalise the informal 500 Township Review o
Management Scheme Demarcation of sites (tribal development Establishment SDF
authority)
Total 1 700
SPATIAL RATIONALE: SPATIAL: PROJECTS & PROGRAMMES FOR 2021 – 2022 FINANCIAL YEAR
230
Project Project Name Project Project Duration Five (5) Year Budget Source of Implementation
No. and Location Description Start Finish MTREF Funding Agent
Date Date 2021/22 2022/23 2023/24 2024/25 2025/26
PED-1 Regional Cemetery Purchase of land for 01/07/2024 30/06/202 R5000 000 R20 000 000 Own GTM
at Relela Cluster Regional Cemetery at 6
Bolobedu South Relela Cluster
Bolobedu South
PED-2 Regional Cemetery at Purchase of land for 01/07/2024 30/06/202 R15 000 000 R5 000 000 Own GTM
Runnymede Cluster, Regional Cemetery at 6
N’wamitwa & Xihoko Runnymede Cluster,
N’wamitwa & Xihoko
PED-3 Regional Cemetery Purchase of land for 01/07/2024 30/06/202 R1000 000 R1000 000 Own GTM
Dusseldorp Regional Cemetery 6
Dusseldorp
PED-4 Land for the Purchase of land for 01/07/2024 30/06/202 R1000 0000 MIG GTM
establishment of a the establishment of a 5
transfer station at the transfer station at the
confluence of Relela confluence of Relela
and Runnymede and Runnymede
clusters clusters
PED-5 Land for the Purchase of land for 01/07/2024 30/06/202 R1000 000 MIG GTM
establishment of a the establishment of a 5
transfer station at the transfer station at the
confluence of Lesedi confluence of Lesedi
and Bulamahlo and Bulamahlo
clusters clusters
PED-6 On-site compacting Purchase of on-site 01/07/2024 30/06/202 R1000 000 MIG GTM
units for the transfer compacting units for 5
station the transfer station for
the transfer stations
PED-7 Geographical Purchase of 01/07/2021 30/06/202 R2 800 000 R4 000 000 R4 000 000 OWN GTM
Information Systems Geographical 4
Information Systems
5.4.6.5 Greater Letaba Local Municipality: Spatial Rationale
KPA: SPATIAL RATIONALE
231
Project Name Project Location Medium Term Expenditure Framework Implementing
Agent
2021/2022 2022/2023 2023/2024
1 Township Establishment on Farm Uitspan 172-LT GLM R1 750 000 R2 431 500 GLM
232
town
8 Ngove town expansion R1,5M R0 R0 0 0 GGM
9 Township establishment Nsavulani R300,000 0 0 0 0 GGM
10 Rezoning and subdivision of parks R300, 000. R300,00 0 0 0 GGM
0
11 Subdivision and rezoning of remainder of 1946 section F R200,000 R0 0 0 0 GGM
12 Review of SDF R350,000 0 0 0 0 GGM
13 Review of LUS and alignment to spluma R300,000 0 0 0 0 GGM
14 Demarcation of sites at ndhambi and sikhunyani R500 000 R700,00 R700,000 0 0 GGM
0
15 GIS upgrade R400 000 R100,00 R100,000 0 0 GGM
0
16 Golf course development R1,000,000 R800,00 R500,000 0 0 GGM
0
17 Proclamation programme R300,000 R600,00 R800,000 0 0 GGM
18 Deeds registration of sites and street naming R400,000 R700,00 R700,000 0 0 GGM
0
19 Dumazi land development and site demarcation. 0 0 0 0 0 Private developer/ PPP
5.4.6.7 Department of Cooperative Governance, Human Settlements and Traditional Affairs (CoGHSTA)
CoGHSTA PROJECTS
PROJECT NAME PROJECT DISCRIPTION PROJECT ANNUAL FUNDER BUDGET COST ESTIMAT
LOCATION PERFORMANC
E 2021/22 2022/23 2023/24 2024/25 2025/2
1 Mopani/ Tzaneen munic./ Inremental - 2.4 Informal settlement GTM CoGHSTA 424 086 0 0 0 0
Nhlatse (600)/ Plannning/ 20/21 upgrading
- Phase 1
233
2 Mopani/ Tzaneen munic./ Incremental - 2.2b Integrated Residential GTM CoGHSTA 7 495 555 0 0 0 0
Hermiglo (163) IRDP: Services Development Programme: Phase 1:
20/21 - Phase 1 Planning and Services Informal Settlement
3 Mopani/ Tzaneen munic./ 4.2 Rural Subsidy Communal Land Rights GTM CoGHSTA 6 125 051 0 0 0 0
Cheapest (100) Rural/ 19/20
4 Mopani/ Ba-Phalaborwa 4.2 Rural Subsidy Communal Land Rights. BPM CoGHSTA 1 502 371 0 0 0 0
Munic. / Lempitse (90) Rural
19/20
5 Mopani/ Letaba munic./ 4.2 Rural Subsidy Communal Land Rights CoGHSTA 4 160 412 0 0 0 0
Mmantwa (175) Rural 19/20
234
Preparation for Annual 3 500 000 3 647 000 3 807 468
4 Financial reports Financial statements MDM Credible Financial statements MDM 4 000 000 4 500 0
235
Project Project Name Project Project Duration Five (5) Year Budget Source of Implementatio
No. and Location Description Start Finish 2021/22 2022/23 2023/24 2024/25 2025/26 Funding n Agent
Date Date
CFO-111 Office furniture Purchase of critical 01/07/2021 30/06/2022 R700 000 R700 000 OWN GTM
office furniture
Project Project Cost Funding Project Cost Funding Project Cost Funding Project Project
No.
(R’000) (R’000) (R’000)
Improved Revenue Collection 2 000 Own Revenue Collection 1 500 BPM Revenue Collection 1000 BPM
financial
viability
Prepaid Electricity 2 500 Own Prepaid Electricity 2 500 BPM Prepaid Electricity 2 500 BPM
Meter Reading & Maintenance Own Meter Reading & BPM Meter Reading & BPM
3 000 3 200 3 500
Maintenance Maintenance
Data Cleansing 1 000 Own Data Cleansing 1 000 BPM Data Cleansing 1 000 BPM
Review of Annual Financial Own Review of Annual BPM Review of Annual BPM
2000 2000 2000
Statements Financial Statements Financial Statements
236
Cluster Secto Operations and Maintenance Projects
r/
2021/22 2022/23 2023/24 2024/25 2021/22
KPA
Project Project Cost Funding Project Cost Funding Project Cost Funding Project Project
No.
(R’000) (R’000) (R’000)
Unbundling of assets
2 300
management
Total 18 592
Project Project Project Baseline Annual Annua Medium Term Expenditure Implementin
Name Description Location Performance l Framework g Agent
Indicator Target
2021/202 2022/202 2023/202
2 3 4
Revenue Review revenue Municipalit 2020/21 Number of Revenue 1 OPEX OPEX OPEX MLM
237
enhancement enhancement y Revenue enhancement
strategy Enhanceme strategy reviewed
nt Strategy
Asset & Development of Municipalit 80% % compliance to 100% OPEX OPEX OPEX MLM
inventory fully GRAP y Asset Standard
management compliant asset (GRAP 17)
register
MFMA Compliance to Municipalit 100% % compliance to 100% OPEX OPEX OPEX MLM
implementatio MFMA y MFMA
n
Supply chain Compliance to Municipalit 80% % compliance to 100% OPEX OPEX OPEX MLM
management Supply chain y SCM Regulations
management
regulations
Project Project Project Baseline Annual Annua Medium Term Expenditure Implementin
Name Description Location Performance l Framework g Agent
Indicator Target
2021/2022 2022/202 2023/202
3 4
238
sustainability
Revenue Revenue collected Municipalit 70% % of revenue 80% OPEX OPEX OPEX MLM
collection monthly y collected monthly
MSCOA Uniform reporting Municipalit New % implementation 100% OPEX OPEX OPEX MLM
for municipality y of MSCOA
Project Project Project Baseli Annual Performance Annual Medium Term Expenditure Framework Implementin
Name Description Location ne Indicator Target g Agent
2021/2022 2022/2023 2023/2024
Capital Expenditure on Municipality 79% % of capital budget 100% 158,830,837.1 104,213,043.4 124,505,304. MLM
Expenditure capital budget spent 3 8 50
Maintenance Expenditure on Municipality 28% % of maintenance 100% 4,930,000.00 5,137,060.00 5,363,090.64 MLM
expenditure maintenance budget spent
budget
MIG Compliance to Municipality 100%% compliance to 100% 25,254,347.63 24,923,043.48 17,635,304.5 MLM
239
Expenditure MIG expenditure MIG expenditure 0
CATALYTIC PROJECTS
PROJECT NAME
FINANCIAL VIABILITY
1 Joined debt collectors for water debt.
2 Changing the conventional water meters to smart meters
ECONOMIC DEVELOPMENT
1 • Revitalization of Industrial Parks
2 • Revitalization of the Makgobaskloof Tea Estate.
240
3 • Agri-park development
4 • Development of Moshupatsela Farm
5 • Taking over LIBRA Services by Local Municipalities for SMME registration & support
6 • Partnership with Council of Geo-science – Mining in Giyani PPP
INFRASTRUCTURE
1 • Raising of the Tzaneen Dam wall to increase water storage to accommodate the growth of
the Tzaneen town.
2 • Construction of Nwamitwa Dam to support key economic developments in the District.
3 • Replacing the dilapidated water pipes that cause huge loss of portable water.
4 • Upgrading of sewer system plants that result in health hazards against water catchment.
5 • Upgrading of Ritavi 2 sub-scheme 4 to support the Nkowankowa industrial park and the new PPP
townships to be established around Dan Extension and Muhlaba’s location.
6 • The upgrading of Phalaborwa WTW and bulk pipe line to feed Gravellotte. PPP
7 • Upgrading of Waste Water and bulk water treatment works on a concession period and hand PPP
back to the WSA. (Built operate and transfer (BOT) i.e Silulimanzi project in Mbombela
Mpumalanga)
KEY RECOMMENDATIONS
Review of the municipality MTEF on grants to accommodate identified and approved projects.
1
241
PPP models on water infrastructure development on concession period
3
Takeover of Water provider services on the phases or stages, run own billing and collection
4
Development of Infrastructure Master Plans and Water Services Development Plan (WSDP)
5
242