You are on page 1of 2

Classification

1. Battery positive bus bar, cable tray, ladder and rack are connected to which zone.

P
A
N
I

2. Minimum cover of conduit for Non-traffic area – 610mm.

3. Attenuation for Single Mode Fiber & Multimode Fiber – 1310nm & 1550 nm & 840nm and
1300.

4. Minimum cover for direct buried FOC without protection. 1200mm

5. HVAC temperature range is – 18°C to 24°C.

6. Humidity for TER – 30 to 55 %.

7. When Sloping and shoring required in trench excavation? Above 1.2 meter or above depth.

8. Choose the correct color of the subduct? Orange, green, white & blue.

9. When is Mandrel test required? Before & after concrete.

10. The splice closure is classified according to the configuration of cables that enter the
closure such as,  Straight, Branch.

11. What is the height of wireless access point from FFL? (3.75 meters)

12. N non-isolated equipment (DC Power system positive return bus, computer floor,
communication racks and cable trays)

13. FOC striped inside the splice closure (2.4m to 3.5m) / (8ft to 10ft).

14. Power outlet of telecom & electrical separation (1mtrs).

15. The maximum pulling tension for a 4-pair 24-AWG UTP cable should not exceed 110 N
(25 lbf).
16. What is GPR? Ground potentials rise due to the flow of lightning or power fault currents.
Lightning, Accidental contact with light or power lines of 300 volts or more.

17. Power outlet requirement in TR


6-inches above the floor and placed at 1.8-meter (6 ft.) intervals around perimeter
walls.

Classificatio
Classification

18. What is the clearance between the telecom conduits to other Electrical utilities such as light
or power source in well‐tamped soil? 300 mm.

19. What is the depth we need to excavate for direct buried FOC? 1200mm/1.20m/120cm

20. What is the minimum depth for lateral conduit to be placed in underground non‐traffic? 610
mm.

21. What is the minimum amount of concrete encasement around the sides of conduits (top,
bottom & sides)? 75 mm

22. Overhead routing of other Utilities (such as HAVAC Equipment, Water line, drain pipelines
and Conduits pass through Telecom room? NO.

23. What is the minimum height to measure the lighting at inside of the telecom room? 2.6
meter (8’ feet & 6 inches).

24. What is the specific height of the power outlets above finish floor at telecom room? 12
inches.

25. What is the maximum length of UTP horizontal cable? 90 meters or 295 feet.

26. What is the minimum clearance in between the top rail of cable tray to ceiling in TR? 30 cm
(12 inches).

27. shall we connect the telecom ground system to power distribution panel as well. NO.

28. What is the clearance shall be provide between the conduits/cables use for electrical power
to telecom cable pathway? 1 foot (0.3 meters).

29. What is the minimum number of 90° bends allowed between pull boxes? 2.

30. The minimum clear vertical space of conduit runs, from other conduits, wires & Cables.
3inches.

31. Twisted pair cable standard code - The standard defines two alternative pinouts:
T568A and T568B.