Professional Documents
Culture Documents
Fredmark Builders: Option 03
Fredmark Builders: Option 03
C G
A R E A T A B U L A T I O N
AREA PER TOTAL AREA
1 SIGNAGE BOARD PLANT BOX
GENERATOR
DESCRIPTION NO. OF 0.70m. 0.70m. 0.70m. 0.70m. 0.70m. 0.70m.
RAMP UP
UNITS UNIT (SQM.) SQM. (PLAIN CEMENT)
@2.30 SQM. @2.30 SQM. @2.30 SQM. @2.30 SQM. @2.30 SQM. @2.30 SQM. @3.77 SQM.
1. COMMERCIAL UNIT A 1 104.38 104.38 2.30m.
6. OFFICE UNIT F 2 14.33 28.66 COMMERCIAL COMMERCIAL COMMERCIAL COMMERCIAL (TILES) ELEC'L
UNIT A
7
@1.56 SQM.
UP 16
8. D&A OFFICE 1 15.36 15.36 (TILES) (TILES) (TILES) (TILES) 6
7. HALLWAY (GROUND) 1 133.97 133.97 2 (TILES) @27.54 SQM. @27.54 SQM. @27.54 SQM. @27.54 SQM.
1
2
15
14
5
4
STORAGE 3 13
3
8. HALLWAY ( SECOND) 1 115.42 115.42 @104.38 SQM. 4 12
2.28m.
@4.98 SQM. 5 11
2
11 5 8
10. PARKING 1 62.20 62.20 12 4
6 502.16
3 1.00m.
13
14
3
2
GROUND FLOOR 15 1
6.62m. 3.87m. 16 UP 3.20m. 3.18m. 3.20m. 3.20m. 3.70m.
4 1
UP
A B C D E F G H I
1 0.70m.
TOILET TOILET
0.70m. 0.70m.
TOILET TOILET
0.70m. 0.70m.
0.70m.
TOILET 16 DN
15
OFFICE OFFICE OFFICE OFFICE @2.30 SQM.
14
2 (TILES)
2 14 5
COMMERCIAL 3 13 4
4 12 3
@118.69 SQM.
8 CORRIDOR UNIT C
5
6 10
11 2
1
9 7
10 6 (TILES) (TILES)
7
8
9
11 5
12 4 @81.00 SQM.
3 13
14
15
3
2
1
TOILET TOILET
DN 16
@2.30 SQM. TOILET @2.30 SQM.
0.70m. 0.70m. 0.70m.
@1.95 SQM.
OFFICE OFFICE
UNIT G UNIT G D&A OFFICE
CORRIDOR
4 (TILES)
(TILES) (TILES) (TILES)
@15.36 SQM.
@15.36 SQM. @15.36 SQM.
FREDMARK BUILDERS
GLOBAL CORPORATION LOCATION:
D&A COMPLEX BUILDING
SHEET CONTENTS:
SD
PTR NO.: AC-1788906 REG. NO.: 028219 03 03
Lot 2, Blk 12, Holy Angel Village Phase 5 bgy. Calibutbut, Bacolor Pampanga
ISSUED ON: MARCH 23, 2022 TIN.: 261-394-723-000
Contact No.: +63 949 899 9911 (Smart)/ +63 917 589 8426 (Globe)/ +63 923 957 1553 (Sun)
Email Address: fmbglobalcorp@gmail.com
PANDAN ROAD BRGY.PANDAN, ANGELES CITY, PAMPANGA
VALIDITY: OCTOBER 21, 2024 PLACE: ANGELES CITY PROJECT NO: DESIGNED BY: M.M CADD BY: M.M CHECKED BY: DATE: SEPT. 04, 2022