BIM Development & Implementation

SHIMIZU CORPORATION
Int’l Division – Engineering Department

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


210+ Years of History Company Profile

Global Network
1804 1900 2000

Quality and craftsmanship


made SHIMIZU No.1
Contractor in Edo Period Changi Singapore Concept of
Airport Terminal 3 Space Hotel
Founder: Trans-Tokyo Bay Highway
Kisuke Shimizu

Yoyogi National Concept of


Kabukiza Theatre City in a Pyramid
Stadium

Mode Gakuen
Cocoon Tower
Head Office of TOYOTA
Japan’s National Bank
Concept of Green Float

Historical Heritage Todaiji Temple Fukuda Denshi Arena


First Western-style hotel World Largest wooden structure
in Japan

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


Global Presence Company Profile

Shanghai (China HQ)


Tokyo (JP HQ)

Singapore (Int’l HQ)

Offices in 21 countries

Turnover: US$15bn (26th global GC ENR ranking 2019)

Employees: ~16,000

Business Activities: Architecture, Investment, Design, Civil Engineering, Engineering, Construction,


Real Estate Development & Management, Research & Development

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


International Engineering Department

CONTENTS Duration
• Shimizu-Int’l Division BIM Implementation Roadmap 05mins

• Showcase of BIM & ICT Implementations in Int’l Division 20mins

SHIMIZU VIET NAM- BIM & Engineering


01-April-2023

Phạm Trường Giang

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


International Engineering Department

Shimizu- Int’l Division BIM Implementation Roadmap

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


Int’l Division BIM Implementation Roadmap International Engineering Department

 Shimizu has been using In-house 3D coordination software in Japan since 1984.
Shimizu đã tự phát hành và sử dụng phần mềm 3D coordination từ những năm 1984

 In Singapore, Shimizu started to use In-house 3D coordination software from 2003.


Phần mềm này sau đó được phát triển và áp dụng tại Singapore từ năm 2003

 The key objectives of the


software were common as
those set under the current
BIM Implementation.
Các mục tiêu cơ bản vẫn
phù hợp với việc áp dụng BIM
hiện hành

2003

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


Int’l Division BIM Implementation Roadmap International Engineering Department

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


Int’l Division BIM Implementation Roadmap International Engineering Department

B
A

B C
A

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


Int’l Division BIM Implementation Roadmap International Engineering Department

2010. Thành lập Trung tâm CNTT Xây dựng giúp các cơ quan quản lý và công ty xây dựng
khởi động BIM
2011. Làm việc với các cơ quan quản lý về các dự án thí điểm

2017
2012. Làm việc với các cơ quan quản lý để chuẩn bị cho các chuyên gia tư vấn và nhà thầu
đảm nhận dự án khu vực công sẵn sàng cho BIM
2015

2013

PHASE-1
2003 ( General Function )

• 3D
• 4D
• Connection details
• Coordination ASME
• Shop drawing

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


International Engineering Department

PHASE-1
( General Function )

• 3D
• 4D
• Connection details
• Coordination ASME
• Shop drawing

COPYRIGHT © SHIMIZU CORPORATION APPENDIX-(I) INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


International Engineering Department

PHASE-1
( General Function )

• 3D
• 4D
• Connection details
• Coordination ASME
• Shop drawing

COPYRIGHT © SHIMIZU CORPORATION APPENDIX-(I) INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


International Engineering Department

PHASE-1
( General Function )

• 3D
• 4D
• Connection details
• Coordination ASME
• Shop drawing

COPYRIGHT © SHIMIZU CORPORATION APPENDIX-(I) INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


International Engineering Department

PHASE-1
( General Function )

• 3D
• 4D
• Connection details
• Coordination ASME
• Shop drawing

COPYRIGHT © SHIMIZU CORPORATION APPENDIX-(I) INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


International Engineering Department

PHASE-1
( General Function )

• 3D
• 4D
• Connection details
• Coordination ASME
• Shop drawing

COPYRIGHT © SHIMIZU CORPORATION APPENDIX-(I) INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


International Engineering Department

PHASE-1
( General Function )

• 3D
• 4D
• Connection details
• Coordination ASME
• Shop drawing

COPYRIGHT © SHIMIZU CORPORATION APPENDIX-(I) INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


Int’l Division BIM Implementation Roadmap International Engineering Department

2013. Bắt buộc áp dụng BIM- Kiến trúc cho tất cả các dự án xây dựng mới > 20,000 m2

2014. Bắt buộc áp dụng BIM cho tất cả các dự án xây dựng mới > 20,000 m2

2017
2015. Bắt buộc áp dụng BIM cho tất cả các dự án xây dựng mới > 5,000 m2

2015

2013
PHASE-2
(Automatic Function )

PHASE-1
2003 ( General Function )
• Clash detection
• Quantity take off
• Link to other
• 3D software schedule,
structural analysis,
• 4D etc
• Connection details
• Coordination ASME
• Shop drawing

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


International Engineering Department

PHASE-2
(Automatic Function )

• Clash detection
• Quantity take off
• Link to other software
schedule, structural
analysis, etc

COPYRIGHT © SHIMIZU CORPORATION APPENDIX-(I) INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


International Engineering Department

PHASE-2
(Automatic Function )

• Clash detection
• Quantity take off
• Link to other software
schedule, structural
analysis, etc

COPYRIGHT © SHIMIZU CORPORATION APPENDIX-(I) INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


International Engineering Department

PHASE-2
(Automatic Function )

• Clash detection
• Quantity take off
• Link to other software
schedule, structural
analysis, etc Schedule software BIM Model

BIM Model Structural analysis software

COPYRIGHT © SHIMIZU CORPORATION APPENDIX-(I) INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


International Engineering Department

PHASE-2
(Automatic Function )

• Clash detection
• Quantity take off
• Link to other software
schedule, structural
analysis

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


International Engineering Department

PHASE-2
(Automatic Function )

• Clash detection
• Quantity take off
• Link to other software
schedule, structural
analysis, etc

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


Int’l Division BIM Implementation Roadmap International Engineering Department

2017
2015
PHASE-3
2013 ( Full Function )
PHASE-2 PHASE-1 + PHASE-2
(Automatic Function )
• Full BIM
PHASE-1
2003 ( General Function )
• Clash detection
• Quantity take off
• BIM for FM
• Common
collaboration platform
• Link to other software
schedule, structural
• 3D analysis
• 4D
• Connection details
• Coordination ASME
• Shop drawing

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


International Engineering Department

PHASE-3
( Full Function ) COBie data embedded in BIM Model
PHASE-1 + PHASE-2

• Full BIM
• BIM for FM Sample COBie Template
• Common collaboration
platform

Collaborations with Client / Consultants / Sub-Contractors on FM-COBie data management

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


Int’l Division BIM Implementation Roadmap International Engineering Department

PHASE-3
( Full Function )
PHASE-1 + PHASE-2

• Full BIM
• BIM for FM
• Common collaboration
platform

Collaboration
Platform
• Share BIM Project Information
remotely
• Clash results, Mark-ups, etc
• Model Interrogation
• 4D Planning Tools.
COPYRIGHT © SHIMIZU CORPORATION APPENDIX-(I) INTERNATIONAL DIVISION – BIM WORKING COMMITTEE
International Engineering Department

Conventional Process
Specialist / Sub-
cons Input

Construction Consultant Client


Shopdrawing Review
Construction
Drawing Review

Reject Problem
Reject Found

BIM Process
 Solutions 1
Specialist / Sub- Problem  Solutions 2
cons Input Found  Solutions 3
 …

Construction Coordination /
Shopdrawing Construction
Drawing Collaboration

• Early Detection of Problems.


Consultant Client • More time and options to solutions.
Review Review
• Less mistakes and abortive works.

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


International Engineering Department

Showcase of BIM & ICT Implementations in Int’l Division

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


BIM Implementation in Int’l Division International Engineering Department

MAPLETREE BUSINESS CITY II PSA BUILDING

(MBC2)
 Design & Build Office
Project with full BIM EXISTING
Implementation MAPLETREE
BUSINESS CITY II
MAPLETREE BUSINESS CITY
(MBC I)
(MBC II)

 Site Area = 108,535m2

 Total GFA = 309,050m2

 Client = MAPLETREE
*Artist’s impression
 Project Sum = SGD$350 Mil.

 Project Duration = 26-mths

 Won the BIM Platinum


Award from BCA in 2015

 Selected by BCA to host


BIM AWARD CEREMONY
the International Panel
of Experts (BIM) for site
visit session during 2015
IPE Conference in
Singapore.

IPE-BIM GROUP PHOTO @ MBC-2 SITE

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


BIM Implementation in Int’l Division International Engineering Department
KEY HIGHLIGHTS
 75% of Construction
Shop Drawings were
generated from BIM
COORDINATION ACTUAL
 Reduction of RFIs by
80% as compared to
coordination by
conventional method.

 Precast shop production


drawings were generated
for PC site-factory. MODEL ACTUAL

Cost of drawings is
20% less than other
Non-BIM Project.

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


BIM Implementation in Int’l Division International Engineering Department
KEY HIGHLIGHTS Initial Model As-built Model by
from Consultant Shimizu
 Significant increase in the
amount of modeling
information from the initial
model issued by the
consultant at the beginning
stage of the project.

 Initial Model = 341MB

 As-built Model = 9.21GB

 An increase of approx. 27
AR models 2.77 GB
times the original data
size STR models 1.40 GB

ME models 5.04 GB
AR models 341 MB
Total file size 9.21 GB

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


BIM Implementation in Int’l Division International Engineering Department
KEY HIGHLIGHTS
 BIM helped to manage
design changes issued
by the Architect.

 Complex structural
geometry & Site Execution /
Coordination can be
conducted with ease using
BIM-to-Field solutions.

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


International Engineering Department

Visualization Tool (3D PRINTER)

3D printer was utilized to create


physical models of complex
areas for better visualization to
facilitate communication and to
resolve interfacing issues.

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


International Engineering Department

BIM BOARD
Approximately 80 images were selected and plotted from different areas of the
BIM models to be displayed for use by the construction team, sub-contractors
and site workers.

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


International Engineering Department

BIM 360 Glue with IPAD


VIDEO

By using BIM 360 glue (app) with an iPad, the


construction team was able to bring utilize the
BIM models and review them on site.

• Facilitate on-site discussion with sub-


contractors for the sequence of work at
the complex areas.

• Check the site condition compared with


the coordinated model information.

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


International Engineering Department

AUTODESK POINT LAYOUT

Add points in BIM .csv or .txt

EXPORT LOAD TO TOTAL STATION


BIM
Innovative process

AutoCAD
Export to Export
AutoCAD for
consultants
not equipped
with BIM

Check the coordinate point

Conventional process Manual input

AutoCAD or Hard copy

Uses:
Using “Point layout” add-in to identify the coordinate points and export information to surveyor for their input to the station. Surveyor can
easily able to select the points from the BIM model via the iPad.

Advantages:
• Improves the productivity of surveyor.
• Reduces discrepancies upon transfer of information.
COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE
International Engineering Department

AUTODESK POINT LAYOUT

1) Add points to the model 2) Export information to .txt file 3) Load file to Total station 4) Make measurement
(X , Y, Z coordination point)

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


BIM Implementation in Int’l Division International Engineering Department
YISHUN COMMUNITY
HOSPITAL (YCH)

 Build-only Contract except


D&B Super-Structure with
full BIM Implementation

 Site Area = 1.16ha

 Total GFA = 56,270m2

 Client = Ministry of Health

 Project Sum = SGD$205Mil.

 Project Duration = 22-mths

 Won the BIM Platinum


Award from BCA in 2015

 Site selected by Authorities


for Minister’s Visit during YCH BIM AWARD CEREMONY
Inpatient Tower blocks GERI
BCA Build Smart Research Centre Tower
Conference

 First Healthcare public


project in Singapore to use
PCSS technology made
possible by Shimizu
Minister Visit @ YCH SITE
COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE
BIM Implementation in Int’l Division International Engineering Department
KEY HIGHLIGHTS
 Optimize usage of a range
of BIM Tools to improve
DfMA process.

 DfMA = Design for


Manufacturing and
Assembly.

 Coordination of BIM Model


with ASME disciplines was
captured into Steelwork
fabrication with
improved drawing
accuracy and easier
site construction.

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


BIM Implementation in Int’l Division International Engineering Department
KEY HIGHLIGHTS
 All major building elements
were integrated into the
BIM model during
collaboration process.

 This is to ensure clash


detections were resolved
prior to commencement of
construction execution in
such short project duration.

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


BIM Implementation in Int’l Division International Engineering Department

KEY HIGHLIGHTS
 This project actively
involved the Client and
End-user via the use of
BIM tools.
Routine BIM Collaboration Meeting in BIM room
 BIM ROOM

 BIM 360 GLUE

 IMMERSIVE VR

 Common Communication IMMERSIVE VR (Virtual Reality)


Median is the ROOM connect direct to BIM model.
Engaging End-User / Specialist Sub-Con on Site using
BOOK. BIM 360-Glue & IPad

ROOM BOOK as Communication Median with Client /


YCH_KSJV_RoomBook_L3-Dental_v3b.html
Consultant / End-User and all stake holders.

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


BIM Implementation in Int’l Division International Engineering Department

KEY HIGHLIGHTS
 This project has to comply
with the Client’s use of BIM
Model for Facilities
Management via COBIE.

 BIM for FM can streamline BIM Integrating Building


Management System
Change Management. Information embedded in BIM
element

 Frequency of maintenance
for both preventive &
predictive.

 FM Team to utilize BIM


model as electronic/digital
user manual.

CSD Drawings from BIM

Modelling of Services

3D-Scanning on Site for Verification of CSD As-Built Drawings


COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE
BIM Implementation in Int’l Division International Engineering Department

KEY HIGHLIGHTS
 Invited to BCA and
consultant office to
participate in their BIM
workshop to share with
them the BIM Experience in
YCH Project.

 Contributed to the YCH Shimz BIM Manager giving BIM YCH Shimz BIM Manager speaking at
publication of the BCA Orientation to BCA Management staff Project Consultant Office on BIM Use
BIM Essential Guide for
Collaborative Virtual Design
and Construction.

Corporate Social Responsibility


COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE
BIM Implementation in Int’l Division International Engineering Department

CHANGI GENERAL HOSPITAL (SG)


[FULL BIM]

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


International Engineering Department

MODELLING CHECKS / PRINCIPLES


Show key improvements made and how they contribute to long term goals.

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


International Engineering Department

MODELLING CHECKS / PRINCIPLES

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


International Engineering Department

NATIONAL CANCER CENTER (SG)


[FULL BIM]

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


BIM Implementation in Int’l Division International Engineering Department

NATIONAL CANCER CENTER (SG)


[FULL BIM]

SHIMZ SHIMZ
Misc. Fire PSG Structural Roombook
(Lift, RDWP, etc)
BIM Team BIM Team

SHIMZ SHIMZ
ACMV ELECT M&E Archi VDC Session Area
BIM Team BIM Team

[22 Shimz Staff + 20 Vendors’ Staff in VDC Room]

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


International Engineering Department

MODELLING CHECKS / PRINCIPLES

4D ANIMATION - (MS Project schedule link to 3D)


Design & planning / understand works relationship before construction.
COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE
International Engineering Department

MODELLING CHECKS / PRINCIPLES

IN-PROGRESS AHEAD

DELAY COMPLETED

4D CONSTRUCTION – COMMUNICATION to site team, subcons & owners


Progress monitoring & Site Weekly Meeting( work projection, delays and ahead) & Logistics
Understand sequence of work before construction. -PH/SNA (Lean Planning)
COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE
BIM Implementation in Int’l Division International Engineering Department
Collaboration Tools
CPF / 79RR Project (SG)
[FULL BIM]

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


BIM Implementation in Int’l Division International Engineering Department

CPF / 79RR Project (SG)


[FULL BIM]

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


BIM Implementation in Int’l Division International Engineering Department

PPO Project (SG)


[FULL BIM]

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


BIM Implementation in Int’l Division International Engineering Department

AAG Project (SG)


[FULL BIM]

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


BIM Implementation in Int’l Division International Engineering Department

Proton Therapy Center Project (Taipei)


[FULL BIM]

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


BIM Implementation in Int’l Division International Engineering Department

Proton Therapy Center Project (Taipei)


[FULL BIM]

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


BIM World Wide Resource Sharing International Engineering Department

Resource Sharing

INTERNATIONAL DIVISION

International Engineering
Department

BIM Working Committee


(INT’L DIVISION)

BIM Centers (INT’L DIVISION)

Corporate Social Responsibility


COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE
BIM Implementation in Int’l Division International Engineering Department

Showcase of BIM & ICT Implementations in Int’l Division


Project in Vietnam

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


BIM Implementation in Int’l Division International Engineering Department

We propose step by step tools to secure Client consensus for Operating Theatre Design
We propose an effective Workflow for determining the factors for the Operation Theatre Installation of complex functions and construction
schedules by using our experiences.)
Chúng tôi đề xuất các công cụ theo từng bước để đảm bảo sự đồng bộ của khách hàng đối với thiết kế phòng mổ.
Chúng tôi, bằng kinh nghiệm thực tế của mình, sẽ đề xuất Quy trình triển khai các bước cho từng bộ phận chức năng và lịch
trình lắp đặt thiết bị phòng mổ.
Mô phỏng ảo
ROOM BOOK Virtual Mock Up

ROOM BOOK

VR MOCK UP (ROOM BOOK) for Design coordination and easy for


Client & Engineer checking for approval before Material Order
It is one critical part of Procurement process

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


BIM Implementation in Int’l Division International Engineering Department

For operating rooms that become complicated processes, clashes detection and check the process using the 4D BIM,
including the direct work and other package such as medical equipment of hospitals.

Đối với phòng mổ có quy trình phức tạp, dễ dàng phát hiện xung đột và kiểm tra quy trình bằng 4D BIM,
bao gồm cả việc phối hợp với công tác xây dựng và các gói khác như thiết bị y tế.

1. Structure Slab Installation


2. Fire Protection Installation
3. Substructure for Wall
4. Lead Board Installation
5. Wall Panel Installation
6. M&E Concealment & Outlet Installation
7. Ceiling Support Installation
8. Duct Installation
9. Duct Insulation Installation
10. Cable Tray Installation
11. Medical Gas Pipe Installation
12. Laminar Air Plenum Installation
13. Ceiling Installation
14. Ceiling Pendant / Light Installation
15. Door / Window Installation
16. Vinyl Floor Installation
17. Fitment Installation
18. Anesthesia Installation
19. Other Equipment Installation

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


BIM Implementation in Int’l Division International Engineering Department

For operating rooms that become complicated processes, clashes detection and check the process using the 4D BIM,
including the direct work and other package such as medical equipment of hospitals.

Đối với phòng mổ có quy trình phức tạp, dễ dàng phát hiện xung đột và kiểm tra quy trình bằng 4D BIM,
bao gồm cả việc phối hợp với công tác xây dựng và các gói khác như thiết bị y tế.

1. Structure Slab Installation


2. Fire Protection Installation
3. Substructure for Wall
4. Lead Board Installation
5. Wall Panel Installation
6. M&E Concealment & Outlet Installation
7. Ceiling Support Installation
8. Duct Installation
9. Duct Insulation Installation
10. Cable Tray Installation
Thời 11.
điểmMedical
2: kiểmGas tra
Pipe sửa chữa cơ điện
Installation
12. Laminar Air Plenum Installation
13. Ceiling Installation
14. Ceiling Pendant / Light Installation
15. Door / Window Installation
16. Vinyl Floor Installation
17. Fitment Installation
18. Anesthesia Installation
19. Other Equipment Installation

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


BIM Implementation in Int’l Division International Engineering Department

For operating rooms that become complicated processes, clashes detection and check the process using the 4D BIM,
including the direct work and other package such as medical equipment of hospitals.

Đối với phòng mổ có quy trình phức tạp, dễ dàng phát hiện xung đột và kiểm tra quy trình bằng 4D BIM,
bao gồm cả việc phối hợp với công tác xây dựng và các gói khác như thiết bị y tế.

1. Structure Slab Installation


2. Fire Protection Installation
3. Substructure for Wall
4. Lead Board Installation
5. Wall Panel Installation
6. M&E Concealment & Outlet Installation
7. Ceiling Support Installation
8. Duct Installation
9. Duct Insulation Installation
10. Cable Tray Installation
11. Medical Gas Pipe Installation
12. Laminar Air Plenum Installation
13. Ceiling Installation
14. Ceiling
Thời điểm 3: Kiểm Pendant / Light Installation
tra trước khi đóng trần
15. Door / Window Installation
16. Vinyl Floor Installation
17. Fitment Installation
18. Anesthesia Installation
19. Other Equipment Installation

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


BIM Implementation in Int’l Division International Engineering Department

For operating rooms that become complicated processes, clashes detection and check the process using the 4D BIM,
including the direct work and other package such as medical equipment of hospitals.

Đối với phòng mổ có quy trình phức tạp, dễ dàng phát hiện xung đột và kiểm tra quy trình bằng 4D BIM,
bao gồm cả việc phối hợp với công tác xây dựng và các gói khác như thiết bị y tế.

1. Structure Slab Installation


2. Fire Protection Installation
3. Substructure for Wall
4. Lead Board Installation
5. Wall Panel Installation
6. M&E Concealment & Outlet Installation
7. Ceiling Support Installation
8. Duct Installation
9. Duct Insulation Installation
10. Cable Tray Installation
11. Medical Gas Pipe Installation
12. Laminar Air Plenum Installation
Thời13.điểm
Ceiling Installation
4 Kiểm tra trước khi bàn
14. Ceiling Pendant / Light Installation
giao15. Door / Window Installation
16. Vinyl Floor Installation
17. Fitment Installation
18. Anesthesia Installation
19. Other Equipment Installation

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


BIM Implementation in Int’l Division International Engineering Department

BIM Generated Roombook

Thống nhất cùng chủ đầu tư, tư vấn để đề


xuất danh sách những phòng cần chú trọng
đấu nối giữa các bộ môn và người sử dụng

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


BIM Implementation in Int’l Division International Engineering Department

VR system:

https://shimz-idd.shapespark.com/th_opt_room_1/

Mô hình ảo hỗ trợ người sử dụng có thể tiếp


cận trước khi thi công, và đẩy nhanh tiến độ
phê duyệt

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE


International Engineering Department

THANK YOU

COPYRIGHT © SHIMIZU CORPORATION INTERNATIONAL DIVISION – BIM WORKING COMMITTEE

You might also like