You are on page 1of 1

Contingency Plan

Name of Production: Producers Name: Contact Number:

Time Disco Dance Anna-Sophia de Leon 07510120965

Location / Potential problem Effect on production Control Measure Existing measures


scene
Swanage One of the costumes rip We might not have another Find a backup costume to use or
30 Days Road costume to use keep some safety pins on the side
| for emergencies and if it needs to
| be used then and try to hide it from
\/ the camera.
One of the actors might We’ll have a missing Find another back up costume that
be ill and not able to person which means and 2 could fit someone and film them
make it spare costumes that might instead
not fit someone else
Lighting might go wrong The transition would look Try find another lamp to use or film
half way through filming dodgy if one light was fine each scene with different lighting
one scene then went out incase something does go wrong
for another scene and the transition would look funny
Losing the footage by One decade or more could Once everything is filmed (20s-
accident be lost and there would be 2020s), back up the clips onto my
a massive time jump (for laptop and save them into a folder,
example, 50s to 70s as the if lost then I can gain them back
60s shot would be missing) again by sending them to myself on
my email.