Professional Documents
Culture Documents
625
625
625
CANYON BIANCO 40MM ALUMINUM 298 2 360A
POWDERCOATED Date:
CL
CL VERTICAL FRAME
AS-BUILT DRAWING VETTED BY CONSULTANTS
190
300
300
2
BT2 Company: P&T CONSULTANTS PTE LTD
300
2025
2 142
2
WC2/FV
300
1400
1400
1400
2
150x600mm HT Checked By: TUN TUN OO (ARCHI RTO)
3025
3025
1850
HABANA PEARL
300
1960
2000
300 1660 40 Signature:
2
2 199 2
1660
2400
528 B 2 600 2 528
300
JRP 250 350 Date:
CL
2 199 2
M2
2
SP This as-built drawing has been, prepared, in part, based upon information
SP SP
1
2 199 2
300
SD furnished by others. While this information is believed to be reliable, the
350
JRP architect/ consultant assumes no responsibility for the accuracy of this
2700
2
record drawing [or record specification] or for any errors or omissions that
may have been incorporated into it as a result of incorrect information
3600
3600
300
1000
1000
1000
BT2
300
BT2 provided to the architect. Those relying on this record document are
4 2 WC2/FV
250
LV1/T1
3300
2
40
650
550
BT1
300
WC2/FV REFERENCE NO:
350
AS-BUILT DRAWING
300
449
2
FFL FFL
94
OPENING DATE SUBMITTED: 19 Dec 2022
3 CL 40MM ALUMINUM
94
94
900
POWDERCOATED
2
SP VERTICAL FRAME
449
TOILET
(MV)
1 ELEVATION 1 2 ELEVATION 2
40
KYC_CIS_TSO_12B 1 : 40 KYC_CIS_TSO_12B 1 : 40
LV1/T1 0 19 Dec 2022 1st Submission - Toilet Tile Setting Out
700
660
600
C&S CONSULTANT:
0 TOILET 3 TILE SETTING OUT 1200
P&T CONSULTANTS PTE LTD
Structural & Civil Engineers
625
625
625
625
KYC_CIS_TSO_12B 1 : 40 1462 300 2 300 2 300 2146
40MM ALUMINUM 24 RAFFLES PLACE TEL : 6535 2011
CL #23-00 CLIFFORD CENTRE FAX : 6535 1283
4 5 6 7 8 9 10 11 POWDERCOATED SINGAPORE 048621
VERTICAL FRAME
100 100 100 100 100 100 100 100 100 100 100 100
M&E CONSULTANT:
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
54 100 100 100 100 100 100 100 100 100 100 100
A
J. ROGER PRESTON (S) PTE LTD
B MECHANICAL & ELECTRICAL CONSULTING ENGINEERS
C SOLID SURFACE 152 BEACH ROAD, #07-01/04, GATEWAY EAST, SINGAPORE 189721
VANITY TOP TO HIDE
1400
D TEL : +65 6732 0288 FAX : +65 6732 0988
BOTTLE TRAP C/W
BACKSPLASH & NON-
3025
ID CONSULTANT:
1850
1850
DRIP PROFILE
E FD CHAPMAN PTE LTD
L1 KEY PLAN 7500A BEACH ROAD TEL : 6570 6377
2400
2400
#09-323 THE PLAZA FAX : 6570 6355
F
SCALE: 1:1000 M2 SP
SINGAPORE 199591
PTD PTD
M2 JRP MAIN CONTRACTOR:
SD KWAN YONG CONSTRUCTION PTE LTD
1 2 3 4 5 6 7 8 9 10 11 11 Joo Koon Crescent
150
Singapore 629002
1000
1000
TEL : 6898 2323 ; FAX : 6861 1900
A LV1/T1 LV1/T1 Website : www.kwanyong.com.sg
Email : kwanyong@kwanyong.com.sg
550
550
B
BT1 WC2/FV SUB CONTRACTOR:
350
C FFL FFL
94
D
PROJECT TITLE:
E PROPOSED ADDITION AND ALTERATIONS TO
EXISTING CANADIAN INTERNATIONAL SHOOL
F
3 ELEVATION 3 4 ELEVATION 4 INVOLVING NEW ERECTION OF 4-STOREY
EDUCATIONAL INSTITUTION BLOCK ON LOT
3869T, 4506C MK06 AT JURONG WEST STREET 41
KYC_CIS_TSO_12B 1 : 40 KYC_CIS_TSO_12B 1 : 40 (JURONG WEST PLANNING AREA)
DRAWING TITLE:
L2 KEY PLAN
SCALE: 1:1000
TYPICAL CLASSROOM KIDS
TOILET 3 TILE SETTING OUT
KEYNOTES DESCRIPTION KEYNOTES DESCRIPTION
BT1 BIB TAP M2 450MM DIA. ROUND MIRROR
FINISHES:
DRAWN BY: TG
SCALE: As indicated
BT2 2-WAY BIB TAP W/ HANDHELD SHOWER HEAD PTD PAPER TOWEL DISPENSER CHECKED BY: DDC
PHOTO DESCRIPTION PHOTO DESCRIPTION PHOTO DESCRIPTION
JRP JUMBO ROLL PAPER HOLDER SD SOAP DISPENSER DDC 19 Dec 2022
APPROVED BY: DATE:
LV1/T1 UNDER COUNTER LAVATORY/ SELF-CLOSING WC2/FV WATERCLOSET (CHILD)/FLUSH VALVE 150x600mm HT Habana Pearl 300x600mm HT Canyon Bianco 100x300mm WT-13AW1M DWG. NO: REVISION:
DELAY ACTION TAP
KYC_CIS_TSO_12B 0