You are on page 1of 1

1150 AS-BUILT DRAWING SUBMITTED BY MAIN CONTRACTOR

574 2 574 Main Contractor: KWAN YONG


300x600mm HT CANYON BIANCO 300x600mm HT CANYON BIANCO
CONSTRUCTION PTE LTD
1150

574 2 574 3600

300 2 528 B 2 600 2 600 2 600 2 600 2 360 A Checked By: DANIEL DELA CRUZ
300x600mm HT
CANYON BIANCO
Signature:
CFL CFL
CL Date:

625

625

625
AS-BUILT DRAWING VETTED BY CONSULTANTS
CL

300

300
BT2
Company: P&T CONSULTANTS PTE LTD

2142

2 300 2 300 2 300 2 300 2 300 2 300 2 300 2 190

2 300 2 300 2 300 2 300 2 300 2 300 2 300 2 190


WC2/FV

2 199 2
150x600mm HT
HABANA PEARL

2 199 2
Checked By: TUN TUN OO (ARCHI RTO)
1960
2000

1400

1400

1400
2 199 2
Signature:
1660

3025

3025

3025
JRP

1850
Date:

This as-built drawing has been, prepared, in part, based upon information

2400
1 furnished by others. While this information is believed to be reliable, the

2700
SP M2 architect/ consultant assumes no responsibility for the accuracy of this
record drawing [or record specification] or for any errors or omissions that
3600

3600
SP may have been incorporated into it as a result of incorrect information
JRP

350
3300
provided to the architect. Those relying on this record document are
4 2 JRP
40

SD advised to obtain independent verification of its accuracy.

1000

1000

1000

1000
449

300
AS-BUILT DRAWING REFERENCE NO:
OPENING WC2/FV LV1/T1
3

650
40MM ALUMINUM CL DATE SUBMITTED: 19 Dec 2022
BT2
900

550
2

POWDERCOATED WC2/FV

350

350
SP
VERTICAL FRAME
449

FFL FFL
TOILET

94

94
(MV)
40

SOLID SURFACE VANITY TOP


TO HIDE BOTTLE TRAP C/W
BACKSPLASH & NON-DRIP LV1/T1
PROFILE
700

660

600

1 ELEVATION 1 2 ELEVATION 2 0 19 Dec 2022 1st Submission - Toilet Tile Setting Out
SD Rev Date Description
146 2

PTD
BT1 M2 DEVELOPER / APPLICANT:
KYC_CIS_TSO_12C 1 : 40 KYC_CIS_TSO_12C 1 : 40 Canadian International School Pte Ltd
7 Jurong West Street 41, Singapore 649414
TEL : 6467 1732
575 575 FAX : 6462 1104

ARCHITECT:
P&T CONSULTANTS PTE LTD
TYPICAL CLASSROOM KIDS 100x300mm WT-13AW1M
300x600mm HT CANYON BIANCO 24 RAFFLES PLACE
#23-00 CLIFFORD CENTRE
SINGAPORE 048621
TEL : 6535 2011
FAX : 6535 1283

CFL CFL C&S CONSULTANT:

0 TOILET 4 TILE SETTING OUT 1150


40MM ALUMINUM
P&T CONSULTANTS PTE LTD
Structural & Civil Engineers
625

625

625

625
KYC_CIS_TSO_12C 1 : 40 272 2 300 2 300 2 272 POWDERCOATED 24 RAFFLES PLACE TEL : 6535 2011
VERTICAL FRAME 360 A 2 298 #23-00 CLIFFORD CENTRE FAX : 6535 1283
CL SINGAPORE 048621
4 5 6 7 8 9 10 11

100 100 100 100 100 100 100 100 100 100 100 100
M&E CONSULTANT:

190
SP

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
54 100 100 100 100 100 100 100 100 100 100 100
A J. ROGER PRESTON (S) PTE LTD

2
40MM ALUMINUM

300
POWDERCOATED MECHANICAL & ELECTRICAL CONSULTING ENGINEERS

2025
B
VERTICAL FRAME

2
C 150 660 40 152 BEACH ROAD, #07-01/04, GATEWAY EAST, SINGAPORE 189721

300
TEL : +65 6732 0288 FAX : +65 6732 0988

1400
D
SOLID SURFACE
VANITY TOP TO HIDE

2
ID CONSULTANT:

3025

3025
BOTTLE TRAP C/W
1850

1850
300
BACKSPLASH & NON- FD CHAPMAN PTE LTD
E
L1 KEY PLAN DRIP PROFILE
1660 300
7500A BEACH ROAD TEL : 6570 6377

2
2400

2400
528 2 600 2 528 B #09-323 THE PLAZA FAX : 6570 6355

300
SCALE: 1:1000 SINGAPORE 199591
CL
F
PTD M2

2
MAIN CONTRACTOR:
M2 SP SP
KWAN YONG CONSTRUCTION PTE LTD

300

2 300 2 300 2 300


SD PTD
1 2 3 4 5 6 7 8 9 10 11 11 Joo Koon Crescent

2
150

Singapore 629002

300
TEL : 6898 2323 ; FAX : 6861 1900

1000
A LV1/T1 BT2 Website : www.kwanyong.com.sg
LV1/T1

250
Email : kwanyong@kwanyong.com.sg

2
550

550
B

2 300
BT1 WC2/FV SUB CONTRACTOR:
BT1

300
C
FFL FFL

94

94
D

PROJECT TITLE:
E
PROPOSED ADDITION AND ALTERATIONS TO
EXISTING CANADIAN INTERNATIONAL SHOOL

F
3 ELEVATION 3 4 ELEVATION 4 INVOLVING NEW ERECTION OF 4-STOREY
EDUCATIONAL INSTITUTION BLOCK ON LOT
3869T, 4506C MK06 AT JURONG WEST STREET 41
KYC_CIS_TSO_12C 1 : 40 KYC_CIS_TSO_12C 1 : 40 (JURONG WEST PLANNING AREA)

DRAWING TITLE:
L2 KEY PLAN
SCALE: 1:1000 TYPICAL CLASSROOM KIDS
TOILET 4 TILE SETTING OUT
KEYNOTES DESCRIPTION KEYNOTES DESCRIPTION FINISHES:
BT1 BIB TAP M2 450MM DIA. ROUND MIRROR DRAWN BY: TG
PHOTO DESCRIPTION PHOTO DESCRIPTION PHOTO DESCRIPTION SCALE: As indicated
BT2 2-WAY BIB TAP W/ HANDHELD SHOWER HEAD PTD PAPER TOWEL DISPENSER CHECKED BY: DDC
JRP JUMBO ROLL PAPER HOLDER SD SOAP DISPENSER DDC
150x600mm HT Habana Pearl 300x600mm HT Canyon Bianco 100x300mm WT-13AW1M APPROVED BY: DATE: 19 Dec 2022
LV1/T1 UNDER COUNTER LAVATORY/ SELF-CLOSING WC2/FV WATERCLOSET (CHILD)/FLUSH VALVE
DWG. NO: REVISION:
DELAY ACTION TAP
KYC_CIS_TSO_12C 0

You might also like