You are on page 1of 2

SH1734

Research Progress Report

Members: Cahulogan, Cotiangco, Octura Date: April 15, 2023


Section: 12STEM – 401 Score:

RCC
Week
Output Task Requirement Status Coordinator
#
Signature
Group
Interest Group • Attendance F
Orientation
Capstone Project • Attendance, Capstone
F
Proposal Project Proposal
1–2 Topic • Attendance, Capstone
Formation Project Proposal,
Finding the Gap F
Finding the Gap
Activity
SHS Assessment
• Capstone Project
Part I: Proposal
3-4 F
Introduction • Finding the Gap
• Progress Report
Part II:
Review of
• Introduction Draft
5-6 Related Literature F
• Progress Report
Research (RRL)
Paper Draft Bibliography
Part III: • Introduction Draft
7-8 Methodology • RRL Draft F
Appendix • Progress Report
Complete • Introduction Draft
Research Paper • RRL Draft
F
Draft • Methodology Draft
(Parts I – III) • Progress Report
9
• Complete Research
Research Abstract,
Paper Draft
Journal Introduction, F
(Parts I – III)
Draft Methods
• Progress Report

02 Handout 1 *Property of STI


Page 1 of 2
SH1734

Part IV:
Presentation,
Analysis, and
• Research Paper Draft
10-13 Interpretation of
• Progress Report
Finalized Data
Research Appendix;
Paper and Results
Journal Part V:
Summary of • Research Paper Draft
Findings,
14-15 • Data Analysis Draft
Conclusions, and
Recommendations; • Progress Report
Discussion
SHS Expo
16 SHS Assessment
eLMS Assessment
Research • Complete Research
17 Paper (Parts I – V)
Forum/Defense
[hard-bound, two (2)
copies]
Finalized • Research Journal
Capstone (hard-bound with
Project Submission of All other research journals
18
Requirements in one book)
• Research Product (if
available)
• Integration Report

LEGEND Status
Finished - F
In - process - P

02 Handout 1 *Property of STI


Page 2 of 2

You might also like