How to create a new item:MM01
Enter the
material
you want
to create
Then create the views Accounting 1, Accounting 2, Costing 1 and Costing 2(see
MMO2, “change a material”, to view the required screens).
To view/modify an item: MM02
F= External
Procurement Click here to
X= Both Procurement
go to the next
Type
screen and
E=In house check it
production
To display
the next
-Division01: screen
Pharm
-Division02:
Parf&Cosm
The standard
8000=HALB (semi cost
finished goods)
9000=FERT To display
(Finished Goods) costing
details
Material Cost Calculation (MCC)
Enter the
“Procurement Type” if
F (in MRP2 view) or if
Check off these
the MRP 2 view is
two boxes
nor created.
XXXX: Purchased out
of Group Check the
XSTE: Purchased in
profit center
Group
Plant specific
material status:
-Z1:not active
-Z2:the material is
active. The material
can be used. Make
sure the roll up has
been released before
putting the item in Z2
Material Cost Calculation (MCC)
To enter a new
price. This will
be effective
The current
during the next
effective
roll-up
price (after
roll up)
Material Cost Calculation (MCC)
After checking theses screens(MRP2, Accounting1, Accounting2, Costing1 and Costing 2), make the links
between them
If in MRP2: X (Both Procurement) is entered, you need to fill in Alternative BOM and Group in the screen
Costing1.
All views of the article are checked. You can now calculate the material cost
Material Cost Calculation (MCC)
Enter
version 0 You can enter one
cost center or a
range of cost
Enter the centers
period(i.e.1 to
12)
If you want to select all the
cost centers, enter group:
Enter the year 0400
After filling in
this screen, click
here to execute
Check off “cost
center group”
Enter
version:0
To view
the next
period
Enter the
material
Enter VOA
plant: 0410
Enter costing
Enter: ZPC1 version:01
Type “ENTER”
Individual Material Cost Calculation:CK11N
Click on “Cost
Component” to
have the details
of the cost
Individual Material Cost Calculation:CK11N
If it is OK, SAVE.
Individual Material Cost Calculation:CK11N
Marking
allowance by
company code
Enter VOA’s
company code:
0400
Period when
the roll up was
done
Give a name to
your costing run
and enter the run
date
SAVE
Enter ZPC1
Enter:01
Enter V000
ZPC1:roll up end of
Enter:0400 the year
ZPC2: roll up during
the year
SAVE
Global Material Cost Calculation: CK40N
Enter 0410
Structure explosion
Flag “Background
processing”. Then save
Global Material Cost Calculation: CK40N
Costing
Flag Background
processing
Global Material Cost Calculation: CK40N
Analysis
Enter the
costing run
and the
costing date
Enter 0410
Unflag Background
processing to be
able to see the result
of the analysis
Global Material Cost Calculation: CK40N
IMPORTANT:
Make sure the lines
Click here to 74 and 75 are
display the empty. If not, check
costs details F and XXXX in the
screen Costing 1
Global Material Cost Calculation: CK40N
Level in the
Bill of
Material
Marking
Release
Just check off
“With list” and
“background
processing”
To display the details of the roll up of an item: CK13N
Enter VOA’s
plant:0410
Enter
ZPC1
Enter the
valid date
Enter 1
Where-used list: CS15
Enter the
material
Check off
theses 2 boxes
Where-used list:CS15
Enter 0410
Where-used list:CS15