COSTING MANUAL
MICKAEL QUESNOT
Costing
Table of contents

How to create a cost center: KA01


How to create a profit center : KE51
How to create an item:MM01
How to view/modify the item:MM02
How to calculate the hourly rate
How to roll up an item individually:CK11N
How to roll up an item globally:CK40N
To view the details of the cost of an item: CK13N
Where-used list:CS15
How to create a cost center:KA01

Enter the cost


center

Enter the valid date of


this cost center

When creating a cost center, it is necessary to link it to hierarchy


How to create a profit center

You can create one Or you can create


profit center several profit
centers

When creating profit center(s), it is necessary to link it to hierarchy


How to create a profit center

You can create one


profit center
How to create a profit center

Enter the profit


center
How to create a profit center

Fill mandatory fields as


the name, the person
Respons, the profit ctr
group,…

Save as inactive
How to create a new item:MM01

Enter the
material
you want
to create

Then create the views Accounting 1, Accounting 2, Costing 1 and Costing 2(see
MMO2, “change a material”, to view the required screens).
To view/modify an item: MM02

Viewing/modifying an item is the first step to calculate a


material cost. Check Accounting1, Accounting2,Costing1
Costing2 and MRP2 (if the item is made in Congers) and
modify them if needed.

Enter the number of the


material you want to
modify. Then click on enter.
Material Cost Calculation (MCC)

The screens you have to check are:


MRP2, Accounting1, Accounting2,
Costing1, Costing2 if it is a material
produced in Congers. If it is not made here,
the view MRP2 does not exist, you just
have to check Acct1, Acct2, Costing1 and
Costing2

Enter plant: 0410


Material Cost Calculation (MCC)

F= External
Procurement Click here to
X= Both Procurement
go to the next
Type
screen and
E=In house check it
production

SAP CODE MEANING


HALB Semi-Finished
Good
ROH Raw Material
VERP Packaging
FERT Finished Good
Material Cost Calculation (MCC)

To display
the next
-Division01: screen
Pharm
-Division02:
Parf&Cosm

The standard
8000=HALB (semi cost
finished goods)
9000=FERT To display
(Finished Goods) costing
details
Material Cost Calculation (MCC)

Make sure nothing


has been entered in
Accounting 2
Material Cost Calculation (MCC)

Enter the
“Procurement Type” if
F (in MRP2 view) or if
Check off these
the MRP 2 view is
two boxes
nor created.
XXXX: Purchased out
of Group Check the
XSTE: Purchased in
profit center
Group

Plant specific
material status:
-Z1:not active
-Z2:the material is
active. The material
can be used. Make
sure the roll up has
been released before
putting the item in Z2
Material Cost Calculation (MCC)

To enter a new
price. This will
be effective
The current
during the next
effective
roll-up
price (after
roll up)
Material Cost Calculation (MCC)

After checking theses screens(MRP2, Accounting1, Accounting2, Costing1 and Costing 2), make the links
between them

If in MRP2: X (Both Procurement) is entered, you need to fill in Alternative BOM and Group in the screen
Costing1.

All views of the article are checked. You can now calculate the material cost
Material Cost Calculation (MCC)

2) To calculate a Material Cost (KP-26)

Enter
version 0 You can enter one
cost center or a
range of cost
Enter the centers
period(i.e.1 to
12)
If you want to select all the
cost centers, enter group:
Enter the year 0400

Activity type group

Check off “Forum-


based” to view it on
Then click on the icon “Overview screen” in bar tool screen
Material Cost Calculation (MCC)
If in PPI:
The first cost center appears 1 is displayed, then you need to
manage it for the budget. Fill in
data…
3 is displayed, you don’t need it
because it is a fixed element
To display the hourly rate

After filling in
this screen, click
here to execute
Check off “cost
center group”

Enter
version:0

Enter the period


and the fiscal year

Check off: “Test run”


and “Detailed list”

Then SAVE. The system will update the data


To display the hourly rate

To view
the next
period

Check it and then post it


Individual Material Cost Calculation: CK11N

Enter the
material

Enter VOA
plant: 0410
Enter costing
Enter: ZPC1 version:01

ZPC1: roll up at the


end of the year
ZPC2: roll up during
the year
Type “ENTER”
Individual Material Cost Calculation: CK11N

Enter the range


of date

Type “ENTER”
Individual Material Cost Calculation:CK11N

Click on “Cost
Component” to
have the details
of the cost
Individual Material Cost Calculation:CK11N

Make sure line 74 and 75


are empty. If not, there is a
problem, check F and XXXX
in the screen Costing 1

If it is OK, SAVE.
Individual Material Cost Calculation:CK11N

Then update the price: CK24

Marking
allowance by
company code

Enter VOA’s
company code:
0400

VOA’s plant: 0410


Enter the material

Make sure only “With list”


is checked off
Individual Material Cost Calculation:CK11N

Mark the price: The system


shows you were the result of
the costing will appear

Check off only


“With list”
Individual Material Cost Calculation:CK11N

Release the price.


The price will be updated (see
view costing 2)

Check off only


“with list”
Individual Material Cost Calculation:CK11N

The price is now released

Period when
the roll up was
done

Result of the roll


up
Global Material Cost Calculation: CK40N

Click here to create


a new costing run. You can enter
details of your run

Give a name to
your costing run
and enter the run
date
SAVE

Enter ZPC1

Enter:01
Enter V000
ZPC1:roll up end of
Enter:0400 the year
ZPC2: roll up during
the year
SAVE
Global Material Cost Calculation: CK40N

Process step by step. For


each line, enter the
parameters and save
them. Then Execute the
transaction. Make sure the
status is green, read the
log if there is one. If there
is no mistake, go to the
next lane.
Global Material Cost Calculation: CK40N

Click here to select more


parameters (so as not to choose
Selection Select the materials you want
deleted items,Z1 items…)
to calculate. If you want to,
you can choose range(s),
single material(s) after
clicking on the key

Enter 0410

Check off “Always


recalculate
material”

Flag: “Background Processing”

Then SAVE, go back and EXECUTE


Global Material Cost Calculation: CK40N

Structure explosion

Flag “Background
processing”. Then save
Global Material Cost Calculation: CK40N

Costing

Flag Background
processing
Global Material Cost Calculation: CK40N

Choose the variant


SAP&11
Global Material Cost Calculation: CK40N

Analysis

Enter the
costing run
and the
costing date

Enter 0410

Unflag Background
processing to be
able to see the result
of the analysis
Global Material Cost Calculation: CK40N

Analysis SAP displays the cost of


the components of the
product you are calculating
(you have the cost of all the
components of the Bill of
Material)

To display details about the Variant SAP&11


material, double click on the
item.
Global Material Cost Calculation: CK40N

IMPORTANT:
Make sure the lines
Click here to 74 and 75 are
display the empty. If not, check
costs details F and XXXX in the
screen Costing 1
Global Material Cost Calculation: CK40N

The first roll up of the


month is locked, click here
to unlock it so you can
release the results of the
analysis (the first four lanes
are analysis, the last two
ones update the prices).
(Enter your company code)

Click here to display the


results of the costing (you
can display several lay
out of the costing results:
costing levels, materials
overview, analysis)
Global Material Cost Calculation: CK40N

Level in the
Bill of
Material

Check the status


Global Material Cost Calculation: CK40N

Marking

Just check off


“With list” and
“background
processing”
Global Material Cost Calculation: CK40N

Release
Just check off
“With list” and
“background
processing”
To display the details of the roll up of an item: CK13N

After calculating a material cost, you may


want to see the result of the roll up for this
material (details, machine hour, labor
hour…)

Enter the material for


which you want to
display the Material
Cost Calculation you
made

Enter VOA’s
plant:0410
Enter
ZPC1

Enter the
valid date
Enter 1
Where-used list: CS15

Enter the
material

Check off
theses 2 boxes
Where-used list:CS15

Enter 0410
Where-used list:CS15

SAP displays the


items that use the
material