You are on page 1of 1

AAA EDM Overview Level 2 Rig -- Display1 / AAA EDM Overview Level 2 Rig

DM_REPORT_JOURNAL DM_RIG_OPERATION
Report journal for navigation and CD_DATUM Currently this is the RIG_OP table in
communication flags DFW 3. Have an occurrence in RIG_RUN
each time the rig works on the well.

CD_CASE
CD_DATUM_T CD_RIG_PUMP
Depth Reference Datum Information Rig Pump Information
CD_RIG_SURFACE

CD_CASE_T
CD_RIG_BOP_COMPONENT
Wellplan case and Tubulars scenario,
BOP Components
what a file used to hold

CD_RIG_HYDROCLONE
Rig Hydrocyclone Information
CD_RIG_BOP
Blow out preventers

CD_RIG_MOTOR
CD_RIG_ANCHOR Rig Motor Information
Rig Anchor Information

CD_RIG_PIT
CD_RIG CD_RIG_CENTRIFUGE
Rig Pit Information
Rig Information Rig Centrifuge Information

CD_RIG_BOILER
Rig Boiler Information
CD_RIG_SHAKER
Rig Shaker Equipment Information

CD_RIG_DEGASSER
Rig Degasser Equipment Information DM_RISER
Rig Riser Equipment Information

DM_RIG_MOVE
Rig Move Information

1, 1 / 1, 1 -- 1:48:31 PM , 5/8/2008

You might also like