The two-storey cargo terminal building in Dubai Logistics City has a cargo handling, cooling, and storage area of 34,000 square meters on the ground floor. It can accommodate an annual cargo volume of up to 12 million tons in the future. The upper floor contains recreation rooms, changing rooms, a canteen, and technical rooms across its 7,000 square meter area. During construction over 220,000 cubic meters of soil was removed, 35,000 cubic meters of concrete was poured, and 6,400 tons of steel was used.
The two-storey cargo terminal building in Dubai Logistics City has a cargo handling, cooling, and storage area of 34,000 square meters on the ground floor. It can accommodate an annual cargo volume of up to 12 million tons in the future. The upper floor contains recreation rooms, changing rooms, a canteen, and technical rooms across its 7,000 square meter area. During construction over 220,000 cubic meters of soil was removed, 35,000 cubic meters of concrete was poured, and 6,400 tons of steel was used.
The two-storey cargo terminal building in Dubai Logistics City has a cargo handling, cooling, and storage area of 34,000 square meters on the ground floor. It can accommodate an annual cargo volume of up to 12 million tons in the future. The upper floor contains recreation rooms, changing rooms, a canteen, and technical rooms across its 7,000 square meter area. During construction over 220,000 cubic meters of soil was removed, 35,000 cubic meters of concrete was poured, and 6,400 tons of steel was used.
Dubai Logistics City (DLC). 1s planned to have an annual car go volume of up to 12 million tons in the future, This terminal hall has a size of 300 x 10 m and is made of steel and rein- forced concrete. The Cargo- Handing, Cooling and pe.
cal Storage area s located on
an area of 34.000 m on the ground floor. On the upper floor, with an area of 7,000 thers are recreation and chang: ing rooms as well a a canteen. and technica sice room. In the course of shell and core. 220000 m' of soil were re- moved, 35,000 m’ concrete were built n and 6.400 t of steel were used up.
Cargo Terminal Building
“The contract includes the tn
Key execution of the building using the design and build sys tem. The turkey finishing of the entire technical equipment, such as the -22°C cooling ares, were especially challenging oiv- en outdoor temperatures of up. 450°C
Passenger Terminal Building
Another key building of the
Al Maktoum Intemational Ar Portis the new Passenger Ter- minal with an annual passenger capacity of 5107 millon. The first Passenger Terminal Build: ing of construction phase 11 3 two-storey building with three. wings, each 185 m long and
100 m wide and which amount
10. gross storey area of approx. imately 50000 m'. The depar- ture and arrival halls 3s well as the main hal concourse, are
located on the ground floor.
Administration offices and restaurants are on the mez. Zanine level. The construction methods used for the terminal are reinforced concrete con. ruction and constructional steelwork. The roof construc. tion is supported by steel col ums, The mezzanine level isa reinforced concrete construc tion which consists of precast hollow core slab.
The contract includes shell and
core, steel orks and the entire earthworks including amelio- ration measures. Furthermore the scope of work included sev- eral smaller adjoining buildings and gangways.