Location: cavite
Subject: BILL OF QUANTITIES
Client: Mrs. Constant Cordial
Date: April 4, 2023
BILL OF QUANTITIES
ITEM NO. PARTICULARS QTY
I GENERAL REQUIREMENTS
a. Mobilization & Demobilization 1.00
b Temporary Facilities (House Rental) 1.00
c Transportation/Deliveries 1.00
d Supervision 1.00
e Water & Electrical Supply 1.00
SUB-TOTAL FOR GENERAL REQUIREMENTS
II SWIMMING POOL
2,0 1-A Siteworks
a. chipping works 4.30
b. Backfill and Compaction 0.30
c. Gravel Bed 0.80
d Rebar Works 136.00
e Formworks 21.00
f Concrete 3.60
g CHB Laying "4" 24.90
h Water Proofing 21.30
SUB-TOTAL
3.0 1-B Stair and Pathwalk/Pool Deck
a. Rebar 75.00
b Concrete 1.50
SUB-TOTAL
4.0 FINISHES
5-A Plaster
20*120 ceramic tiles wood finished 10.30
5-B Finishes
20x120 ceramic tiles wood finished 26.00
AQUASCAPE SWIMMING POOL ANDConsumables,
FOUNTAIN BUILDERS grout 1 of 8 36.00
Acid Washing 1.00
SUB-TOTAL
5.0 MECHANICAL
6-A Equipment and Accessories
jetflo Pump .75HP 1.00
emaux af100 1.00
cuetas heater 1.00
jetflo air blower 1.00
air control 1.00
hydrojets 4.00
Variflo Valve 1.00
Hydro Stream 3.00
Vacuum Fittings 2.00
Main Drain Cover 1.00
6-B Plumbing Works
Roughing Ins and Complete plumbing system and
accessories including interconnection of existing mains for 1.0
efficient filtration,drainage & water supply
Cleaning accessories consisting of vacuum head, vacuum
1.00
hose, telescopic handle, nylon brush and water test kit
SUB-TOTAL
GRAND TOTAL
TERMS OF PAYMENT:
50% DP balance thru progress billing
WARRANTY:
Ten (10) years on Structural
Five (5) years on Waterproofing
Prepared: Checked/Noted:
154,640.00
27,000.00
96,373.00
14,625.00
57,400.00
154,640.00
21,080.00
19,300.00
1,500.00
391,918.00
UBIN
agerAQUASCAPE SWIMMING POOL AND FOUNTAIN BUILDERS 7 of 8
AQUASCAPE SWIMMING POOL AND FOUNTAIN BUILDERS 8 of 8