BILL OF QUANTITY

Date: August 27, 2019

Project: CAR GARAGE

Location: TARLAC STATE UNIVERSITY

Company: LEMUEL DUPITAS

MATERIAL COST LABOR COST


ITEM DESCRIPTION QUANTITY TOTAL AMOUNT
UNIT PRICE AMOUNT UNIT PRICE AMOUNT

1 GENERAL REQUIREMENTS

a. Mobilization/ Demolition 1.00 lot


0 0 0
b. Temporary Facilities/ Fences 1.00 lot
0 0 0
c. Building Permits/ Occupancy permit (Leg work only) 1.00 lot
0 0 0
d. As Built Plans 1.00 lot
0 0 0
e. Safety, Health and Security 1.00 lot
0 0 0
Sub-total 0 0 0
2 EARTHWORKS

a. General Cleaning/ Demolition Works 1.00 lot 0 0 0


b. Stacking out 1.00 lot 0 0 0
c. Excavation 512.76 cum 0 0 0
d. Backfill and Compation 813.00 cum 0 0 0
e. Gravel Bedding 43.68 cum 0 0 0
f. Soil Poisoning 436.00 sqm 0 0 0
g. Hauling and Disposal 1.00 lot 0 0 0
Sub-total
0 0 0
3 CONCRETE WORKS

a. Retaining Walls

a.1 Concrete 44.70 cum


0 0 0
a.2 Rebars 4,487.62 kls
0 0 0
a.3 Gi Tie Wire Ga. 16 74.54 kls
0 0 0
b. Footings

b.1 Concrete 5.15 cum


0 0 0
b.2 Rebars 111.65 kls
0 0 0
b.3 Gi Tie Wire Ga. 16 74.54 kls
0 0 0
c. Columns

c.1 Concrete 6.85 cum


0 0 0
c.2 Rebars 1,006.56 kls
0 0 0
c.3 Gi Tie Wire Ga. 16 24.60 kls 0 0 0
d. Beams

d.1 Concrete 12.59 cum 0 0 0


d.2 Rebars 2,233.63 kls 0 0 0
d.3 Gi Tie Wire Ga. 16 32.40 kls 0 0 0
e. Slab on Fill

e.1 Concrete 67.76 cum 0 0 0


e.2 Rebars 3,583.01 kls 0 0 0
e.3 Gi Tie Wire Ga. 16 617.00 kls
0 0 0
Sub-total 0 0 0
4 Masonry Works with Plastering

a. CHB 6" x 4' x 8' 240.00 sqm


0 0 0
b. Rebars at 10mm x 6m 200.00 pcs
0 0 0
c. Gi Tie Wire Ga. 16 27.30 kgs
0 0 0
d. Cement 350.00 bags
0 0 0
e. Washed Sand 21.40 cum
0 0 0
f. Nature Stone Cladding 149.80 sqm
0 0 0
Sub-total
0 0 0
5 Roof Framing and Sun Baffles Framing

a. 50 x 50 x 2.0mm Tubular 95.00 pcs


0 0 0
b. 100 x 50 x 2.0mm Tubular 9.00 pcs
0 0 0
c. 100 x 50 x 4.5mm Tubular 9.00 pcs
0 0 0
d. 100 x 100 x 2/0mm Tubular 8.00 pcs
0 0 0
e. 175 x 50 x 2.0mm Tubular 16.00 pcs 0 0 0
f.200 x 200 x 4.5mm Tubular 2.00 pcs 0 0 0
g. W 12x14 12.00 lm 0 0 0
h. W 12x16 12.00 lm 0 0 0
i. C-Purlins 100 x 50 x 15 x 2mm 65.00 pcs 0 0 0
j. 16mm φ Plain Rod 8.00 pcs 0 0 0
k. 16mm φ Plain Rod 8.00 pcs 0 0 0
l. Turn buckle 4.00 pcs 0 0 0
m. L 50 x 50 x 4.5mm 13.00 pcs 0 0 0
n. Base Plates 1.00 lot
0 0 0
o. Consumables 1.00 lot
0 0 0
Sub-Total
0 0 0
6 Roofing

a. Pre Painted G.I Roof Long Span Rib Type Ga. 26 154.56 sqm
0 0 0
b. Cement Board Senepa 78.00 lm
0 0 0
c. Drip Edge Flashing 11.58 lm
0 0 0
d. Wall Fishing 11.58 lm
0 0 0
e. Polycarbonate Roofing 11.20 sqm
0 0 0
f. Consumables 1.00 lot
0 0 0
Sub-Total
0 0 0
7 Metal Works

a. Stair Railings 24.00 lm


0 0 0
b. Balcony Railings 34.00 lm 0 0 0
c. Gate Frame 50 x 200 x 2.3mm Tubular 12.00 pcs 0 0 0
d. Consumables 1.00 lot 0 0 0
Sub-Total 0 0 0
8 Carpentry

a. Random size solid wood w/ Vanish Finish 39.00 sqm 0 0 0


b. Consumables 1.00 lot 0 0 0
Sub-Total 0 0 0
9 Painting Works
a. Plastered Painted finish 452.50 sqm 0 0 0
b. Metals 223.20 sqm 0 0 0
c. Consumables 1.00 lot
0 0 0
Sub-Total
0 0 0
10 Specialty Finishes

a. Vertical Garden 12.00 sets


0 0 0
b. Vegetable Plot 1.00 lot
0 0 0
Sub-Total
0 0 0
TOTAL AMOUNT 0 0 0

Direct Amount 0

Contractor's Profit (10%) 0

VAT (12%) 0

Total Project Cost 0

Says 0