Professional Documents
Culture Documents
Project Name
G/F WOW World Building, Rizal Highway, Subic Bay Freeport Zone
Project Location
QTY. UNIT LABOR & MAT'LS MARK-UP TOTAL MARK-UP VAT TOTAL TOTAL UNIT
DIV. DESCRIPTION
DIRECT COST OCM PROFIT % VALUE INDIRECT COST COST COST
1 GENERAL REQUIREMENT:
1.1 Permits 1.00 lot 0.00 0.00 0.00 0.00
1.2 Bonds & Insurance 1.00 lot 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
1.3 CARI (Comprehensive All Risk Insurance) 1.00 lot 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
1.4 As-built plan 1.00 set 0.00 8% 0.00 0.00 0.00 0.00 0.00
1.5 Temporary water, power and facilities 1.00 lot 0.00 8% 0.00 0.00 0.00 0.00 0.00
1.6 Mobilization / Demobilization 1.00 lot 0.00 0.00 0.00 0.00
1.7 Meter and Service Deposit to water service 1.00 lot 0.00 0.00 0.00 0.00
1.8 Project Billboard 1.00 lot 0.00 8% 0.00 0.00 0.00 0.00 0.00
1.9 Health and safety 1.00 lot 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
1.10 COVID-19 protocol compliance 1.00 lot 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
1.11 Other Required Works (Please Indicate)
3.3 Concrete
3.3.1 Cash vault 4.02 cu.m 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
3.3.3 Concrete Topping (2" thickness) 157.45 sqm 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
3.3.1 Kitchen counter 1.00 lot 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
Other item of work necessary to complete the intent of the plan and specs. (Specify):
QTY. UNIT LABOR & MAT'LS MARK-UP TOTAL MARK-UP VAT TOTAL TOTAL UNIT
DIV. DESCRIPTION
DIRECT COST OCM PROFIT % VALUE INDIRECT COST COST COST
5.1.5 Vault structural steel component 1.00 lot 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
5.1.6 Genset Housing with heavy duty padlock (exterior) 1.00 lot 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
0.00 sub-total= 0.00
6 WOOD AND PLASTIC
6.1 Partitions
6.1.1 12.5 mm. thk. Gypsum board partition on metal studs
a. Double wall
- Floor to underslab partition (Single wall above ceiling height) 53.40 sq.m. 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
6.2 Architectural Woodworks
6.2.1 Pantry counter 1.20 lm 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
6.2.2 Overhead Cabinet
6.2.2.1 for cash vault 3.28 lm 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
6.2.2.2 for pantry 1.20 lm 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
6.3 Prefabricated modules
6.3.1 Tellers counter inclusive of rubber mat & all acrylic modules forms, picos tray 2.00 set 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
6.3.2 New accounts low counter 2.00 set 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
6.3.3 Guards Podium 1.00 set 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
6.3.4 Forms counter 1.00 set 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
6.3.5 Server counter 1.00 set 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
6.3.6 Typing table 1.00 set 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
6.3.7 Money counter module 1.00 set 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
6.3.8 Sand box 1.00 set 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
6.3.9 Poster module 1.00 set 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
0.00 sub-total= 0.00
7 THERMAL AND MOISTURE PROTECTION
QTY. UNIT LABOR & MAT'LS MARK-UP TOTAL MARK-UP VAT TOTAL TOTAL UNIT
DIV. DESCRIPTION
DIRECT COST OCM PROFIT % VALUE INDIRECT COST COST COST
Provide 4 pcs./FHC door and louver door
8.5.5 Stainless steel invisible hinge for secret door 4.00 set 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
8.6 Windows, Frames and Glass Panels
8.6.1 12mm thk tempered exterior glass panel full height with 6 mil security film 43.84 sq.m 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
8.6.2 12mm thk tempered Interior glass panel (mini-conference room) full height with 3M brand Illumina 4.45 sq.m 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
decorative film
8.7 Other item of work necessary to complete the intent of the plan and specs. (Specify):
QTY. UNIT LABOR & MAT'LS MARK-UP TOTAL MARK-UP VAT TOTAL TOTAL UNIT
DIV. DESCRIPTION
DIRECT COST OCM PROFIT % VALUE INDIRECT COST COST COST
9.4.3 Ceiling cove for backwall and moodboard 9.98 lm 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
9.4.4 Other item of work necessary to complete the intent of the plan and specs. (Specify):
QTY. UNIT LABOR & MAT'LS MARK-UP TOTAL MARK-UP VAT TOTAL TOTAL UNIT
DIV. DESCRIPTION
DIRECT COST OCM PROFIT % VALUE INDIRECT COST COST COST
- 15 mm dia. (1/2" dia) 2.00 pcs 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
b. Fittings and accessories 1.00 lot 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
11.3 Waste & vent line system inclusive of fittings & accessories
a. 100 mm dia. PVC pipes 8.00 pcs 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
b. 50 mm dia. PVC pipes 9.00 pcs 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
c. Fittings and accessories 1.00 lot 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
11.4 Plumbing Fixtures
11.4.1 Package (Water Closet, Lavatory, Faucet, Tissue Holder, Soap Holder & Accessories) 2.00 sets 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
11.4.2 Bidet 2.00 sets 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
11.4.3 Hand Dryer 2.00 sets 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
11.4.4 Urinal including accessories 1.00 set 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
11.4.5 Stainless steel single tub kitchen sink inclusive of 1.00 set 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
ledge type faucet and all other required accessories
11.4.6 Floor drain
- Stainless steel 100 mm x 100 mm 2.00 sets 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
11.4.7 Slop sink all-in (accessories & tiles) 1.00 lot 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
11.4.8 Floor clean out 4" 1.00 set 0.00 0.00 20% 0.00 0.00 0.00 0.00 0.00
11.5 Other item of work necessary to complete the intent of the plan and specs. (Specify):
QTY. UNIT LABOR & MAT'LS MARK-UP TOTAL MARK-UP VAT TOTAL TOTAL UNIT
DIV. DESCRIPTION
DIRECT COST OCM PROFIT % VALUE INDIRECT COST COST COST
Branches: 7-20AT, 2P; 6-30AT, 2P; 1-40AT, 2P;
d. Panel "PPups" 1.0 set/s - - 20% - - - - -
Main: 2-40AT/100AF, 2P, 230V, 30kAIC MTS
Branches: 4-20AT, 2P
e. Backboard for Timer Switches 1.0 set/s - - 20% - - - - -
f. Backboard for Telephone Terminal Cabinet (TTC) 1.0 set/s - - 20% - - - - -
g. Backboard for Private Automatic Branch Exchange (PABX) 1.0 set/s - - 20% - - - - -
13.1.4 Enclosed Circuit Breakers & Electric Meters:
150AT/250AF, 2P MCCB in NEMA 3R Enclosure 1.0 set/s - - 20% - - - - -
30AT/100AF, 2P MCCB in NEMA 3R Enclosure 5.0 set/s - - 20% - - - - -
CL200, SФ Digital Kwhr Meter 1.0 set/s - - 20% - - - - -
13.1.5 Wires & Cables:
3.5mm sq. THWN stranded 14.0 roll/s - - 20% - - - - -
5.5mm sq. THWN stranded 4.0 roll/s - - 20% - - - - -
8.0mm sq. THWN stranded 1.0 roll/s - - 20% - - - - -
14mm sq. THWN stranded 15.0 mtr/s - - 20% - - - - -
30mm sq. THWN stranded 10.0 mtr/s - - 20% - - - - -
38mm sq. THWN stranded 100.0 mtr/s - - 20% - - - - -
80mm sq. THWN stranded 200.0 mtr/s - - 20% - - - - -
13.1.6 Conduits, Fittings & Accessories:
20mm dia. PVC Pipe 170.0 lgt/s - - 20% - - - - -
20mm dia. PVC adaptor & locknut 85.0 pc/s - - 20% - - - - -
25mm dia. PVC Pipe 85.0 lgt/s - - 20% - - - - -
25mm dia. PVC adaptor & locknut 43.0 pc/s - - 20% - - - - -
40mm dia. PVC Pipe 2.0 lgt/s - - 20% - - - - -
40mm dia. PVC adaptor & locknut 4.0 pc/s - - 20% - - - - -
63mm dia. PVC Pipe 25.0 lgt/s - - 20% - - - - -
63mm dia. PVC elbow 6.0 pc/s - - 20% - - - - -
63mm dia. PVC locknut & bushing 6.0 pc/s - - 20% - - - - -
63mm dia. service entrance cap 1.0 pc/s - - 20% - - - - -
Grounding Rod 3/4"x 3mtrs 2.0 pc/s - - 20% - - - - -
Grounding clamp 4.0 pc/s - - 20% - - - - -
13.1.7 Boxes, Pullbox, & Wire gutter:
Junction boxes with cover ga#16 80.0 pc/s - - 20% - - - - -
Utility boxes ga#16 70.0 pc/s - - 20% - - - - -
Pullboxes ga#16 4.0 pc/s - - 20% - - - - -
Wire Gutter 2 pc. - - 20% - - - - 0.00
13.1.8 Switches & Outlets:
One-gang switch with plate 4.0 set/s - - 20% - - - - -
Two-gang switch with plate 6.0 set/s - - 20% - - - - -
Three-gang switch with plate 4.0 set/s - - 20% - - - -
Duplex convenience outlet (grounding type) 44.0 set/s - - 20% - - - - -
30A, A/C convenience outlet 5.0 set/s - - 20% - - - - -
30A, 3prong twistlock outlet with plug (for ATM Machine & Server) 2.0 set/s - - 20% - - - - -
40A, 3prong twistlock outlet with plug 1.0 set/s - - 20% - - - - -
40A, 4prong twistlock outlet with plug 1.0 set/s - - 20% - - - - -
24 hour timer switch w/ battery back-up 2.0 set/s - - 20% - - - - -
Magnetic contactor 2.0 set/s - - 20% - - - - -
QTY. UNIT LABOR & MAT'LS MARK-UP TOTAL MARK-UP VAT TOTAL TOTAL UNIT
DIV. DESCRIPTION
DIRECT COST OCM PROFIT % VALUE INDIRECT COST COST COST
Steel enclosure for switchbank w/ lock & key 1.0 set/s - - 20% - - - - -
13.1.9 Lighting Fixtures: (use LED Lamps & provide 1 year warranty)
UFO Type Emergency Light 11.0 set/s - - 20% - - - - -
Exit Light 2.0 set/s - - 20% - - - - -
T5 16.5W Warm White Fluorescent Lamp 9.0 set/s - - 20% - - - - -
MAS LEDTUBE HF 2-1200mm HE 33watts in 1200 x 600 housing 18.0 set/s - - 20% - - - - -
DL8 - E27 LED Bulb 8watts Pinlight 39.0 set/s - - 20% - - - - -
- sub-total= -
13.2 SECURITY SYSTEM
13.2.1 Wires & Cables
Cat5e UTP Cables 4prs 4.00 box/es - - 20% - - - - -
13.2.2 Conduit, Fittings, & Accessories:
25mm dia. PVC Pipe 120.00 lght - - 20% - - - - -
25mm dia. PVC adaptor & locknut 150.00 pcs - - 20% - - - - -
13.2.3 Boxes:
Junction boxes with cover ga#16 90.0 pcs - - 20% - - - - -
Utility boxes ga#16 30.0 pcs - - 20% - - - - -
Pullboxes ga#16 4.0 pcs - - 20% - - - - -
13.2.4 FACP & BACP Accessories:
Fire Alarm Control Panel (FACP) 1.0 pcs - - 20% - - - - -
Burglar Alarm Control Panel (BACP) 1.0 pcs - - 20% - - - - -
Smoke detector addressable 12.0 pcs - - 20% - - - - -
Pull manual switch with alarm bell 2.0 pcs - - 20% - - - - -
Siren with strobelights 1.0 pcs - - 20% - - - - -
Auto dialer for fire alarm 1.0 pcs - - 20% - - - - -
Auto dialer for burglar alarm 1.0 pcs - - 20% - - - - -
Magnetic door contact recessed type (exit & entry) 7.0 pcs - - 20% - - - - -
Magnetic door contact heavy duty (vault door) 1.0 pcs - - 20% - - - - -
Hold-up buttons 11.0 pcs - - 20% - - - - -
Foot rail switches 3.0 pcs - - 20% - - - - -
Money clip 3.0 pcs - - 20% - - - - -
Vibration contact (Wall mounted) 17.0 pcs - - 20% - - - - -
Vibration contact (Ceiling mounted) 3.0 pcs - - 20% - - - - -
Vibration contact (Floor mounted) 3.0 pcs - - 20% - - - - -
Silent Signaling Device 1.0 pcs - - 20% - - - - -
Buzzer with emergency button 1.0 pcs - - 20% - - - - -
Motion detector 1.0 pcs - - 20% - - - - -
Wired glass break detector (shock sensor) 3.0 pcs - - 20% - - - - -
Miscellaneous Mat'ls (tape, tagging & accessories) 1.0 lot - - 20% - - - - -
13.2.5 BAS Accessories:
Biometric Access System (BAS) personal Computer 1.0 pcs - - 20% - - - - -
Finger Print Proximity Reader 1.0 unit/s - - 20% - - - - -
Single Door Electro Magnetic Lock 1.0 unit/s - - 20% - - - - -
LZ Brackets 1.0 lot - - 20% - - - - -
U Bracket 1.0 pcs - - 20% - - - - -
Stainless Steel Exit Buttons 1.0 unit/s - - 20% - - - - -
12V/3A Power Supply with Back-up Battery 1.0 unit/s - - 20% - - - - -
Proximity Card 1.0 pcs - - 20% - - - - -
QTY. UNIT LABOR & MAT'LS MARK-UP TOTAL MARK-UP VAT TOTAL TOTAL UNIT
DIV. DESCRIPTION
DIRECT COST OCM PROFIT % VALUE INDIRECT COST COST COST
Miscellaneous Mat'ls (tape, tagging & accessories) 1.0 lot - - 20% - - - - -
- sub-total= -
13.3 DATACOM SYSTEM
13.3.1 Wires & Cables:
Cat6 UTP Cable 4prs (Data & Voice) 12.0 box/es - - 20% - - - - -
Cat5e UTP Cable 25prs 10.0 mtr/s - - 20% - - - - -
AWG 22/25Pairs Alpeth Cable 30.0 mtr/s - - 20% - - - - -
5.5 mm sq. THWN stranded 10.0 mtr/s - - 20% - - - - -
13.3.2 Conduits, Fittings & Accessories:
20mm dia. PVC Pipe 40.0 lgt/s - - 20% - - - - -
20mm dia. PVC adaptor & locknut 20.0 pc/s - - 20% - - - - -
25mm dia. PVC Pipe 40.0 lgt/s - - 20% - - - - -
25mm dia. PVC adaptor & Locknut 20.0 pc/s - - 20% - - - - -
32mm dia. PVC Pipe 40.0 lgt/s - - 20% - - - - -
32mm dia. PVC adaptor & Locknut 15.0 pc/s - - 20% - - - - -
FOR TELCO DROP WIRE (COPPER FIBER & VSAT)
32mm dia. PVC Elbow 15.0 pc/s - - 20% - - - - -
32mm dia. Service Entrance Cap 3.0 pc/s - - 20% - - - - -
Grounding Rod 3/4"x 3mtrs 1.0 pc/s - - 20% - - - - -
Grounding clamp 1.0 pc/s - - 20% - - - - -
110mm dia. PVC Pipe 4.0 lgt/s - - 20% - - - - -
110mm dia. PVC adaptor & locknut 3.0 pc/s - - 20% - - - - -
13.3.3 Boxes:
Junction boxes with cover ga#16 20.0 pc/s - - 20% - - - - -
Utility boxes ga#16 15.0 pc/s - - 20% - - - - -
Pullboxes ga#16 3.0 pc/s - - 20% - - - - -
13.3.4 Datacom Accessories:
Data Terminal Cabinet 1.0 set/s - - 20% - - - - -
Dimension: (760mm H x 550mm W x 580mm D)
Service Telephone Terminal Cabinet w/ Grills & Padlock (Stainless Steel) 1.0 set/s - - 20% - - - - -
Dimension: (400mm H x 400mm W x 200mm D)
Krone Module/10 pairs 26.0 pc/s - - 20% - - - - -
5-way Back Mounting Frame 6.0 pc/s - - 20% - - - - -
24Port Patch panel 2.0 set/s - - 20% - - - - -
Private Automatic Branch Exchange (PABX) 1.0 set/s - - 20% - - - - -
*Signal booster 1.0 set/s - - 20% - - - - -
Horizontal cable manager 1.0 set/s - - 20% - - - - -
Rack shelves 1.0 set/s - - 20% - - - - -
Powerstrip 6-conv. outlet for data cabinet 1.0 set/s - - 20% - - - - -
Cat6 UTP Patch Cord 4prs (1 meter) 30.0 pc/s - - 20% - - - - -
Cat6 UTP Patch Cord 4prs (3 meters) 30.0 pc/s - - 20% - - - - -
Duplex Data port outlet, RJ45 19.0 pc/s - - 20% - - - - -
Quadruplex Data port outlet, RJ45 1.0 pc/s - - 20% - - - - -
Duplex Voice port outlet, RJ11 15.0 pc/s - - 20% - - - - -
Triplex Voice port outlet, RJ11 1.0 pc/s - - 20% - - - - -
Miscellaneous Mat'ls (tape, tagging & accessories) 1.0 lot - - 20% - - - - -
Note: *Provide signal booster (location to be verified on-site by ITCG DBP Head Office)
- sub-total= -
QTY. UNIT LABOR & MAT'LS MARK-UP TOTAL MARK-UP VAT TOTAL TOTAL UNIT
DIV. DESCRIPTION
DIRECT COST OCM PROFIT % VALUE INDIRECT COST COST COST
13.4 CCTV SYSTEM
13.4.1 Wires & Cables:
Cat5e UTP Cable 4prs (CCTV) 2.0 box/es - - 20% - - - - 0.00
13.4.2 Conduits, Fittings & Accessories:
25mm dia. PVC Pipe 40.0 lgt/s - - 20% - - - - 0.00
25mm dia. PVC adaptor & locknut 35.0 pc/s - - 20% - - - - 0.00
13.4.3 Boxes:
Junction boxes with cover ga#16 20.0 pc/s - - 20% - - - - 0.00
Pullboxes ga#16 1.0 pc/s - - 20% - - - - 0.00
13.4.4 CCTV Accessories:
CCTV Cabinet 1.0 set/s - - 20% - - - - 0.00
Dimension: (800mm H x 600mm W x 600mm D)
16 Channel DVR/NVR w/ 32" Monitor (Back office) 1.0 set/s - - 20% - - - - 0.00
16 Channel 32" Monitor (Branch Lobby) 1.0 set/s - - 20% - - - - 0.00
External Hard Drive (meet the 90 day real time retention period) 1.0 set/s - - 20% - - - - 0.00
CCTV Camera (dome type) 7.0 set/s - - 20% - - - - 0.00
CCTV Camera (bullet type) 3.0 set/s - - 20% - - - - 0.00
CCTV Camera (Fisheye type) 1.0 set/s - - 20% - - - - 0.00
0.00 sub-total= 0.00
14 SITE DEVELOPMENT WORKS
sub-total= 0.00
0.00 TOTAL ABC = 0.00
14 MODULAR FURNITURE:
14.1 Modular Furniture Seating
14.1.1 Lobby Seating (4-seater gang chair with black cushion) 3.00 set - - 8% - - - - 0.00
14.1.2 BH High-back Chair 1.00 set - - 8% - - - - 0.00
14.1.2 Mid-back Chair 4.00 set - - 8% - - - - 0.00
14.1.2 Tellers Chair 4.00 set - - 8% - - - - 0.00
14.1.2 Staff Chair 4.00 set - - 8% - - - - 0.00
14.1.3 Visitor's Chair 11.00 set - - 8% - - - - 0.00
14.1.4 Pantry Chair 2.00 set - - 8% - - - - 0.00
14.2 Modular Furniture Tables
14.2.1 Modular workstation / table (see booklet)
a. For Branch Head 1.00 set - - 8% - - - - 0.00
b. For Cashier and BDO 2.00 set - - 8% - - - - 0.00
c. For staff / rank and file 4.00 set - - 8% - - - - 0.00
14.1.1 Receiving area round table 1.00 set - - 8% - - - - 0.00
14.1.1 Mobile pedestal 14.00 set - - 8% - - - - 0.00
- sub-total -
15 UNINTERRUPTIBLE POWER SUPPLY (inclusive of delivery/freight costs)
15.1 a. 1KVA, 1Ф, 230V, 60Hz (for CCTV, FACP & BACP) 3.00 unit/s - - 8% - - - - -
b. 6KVA, 1Ф, 230V, 60Hz 1.00 unit/s - - 8% - - - - -
Note: Scope of contractor is up to convenience outlet only, supply and installation of UPSis by others
- sub-total -
16 GENERATOR
16.1 16.1.1 37KVA, 1Ф, 60HZ Generator unit 1.00 unit/s - - 8% - - - - -
16.1.2 150AT/250AF, 2P, 230V, 65KAIC Automatic Transfer Switch (ATS) 1.00 unit/s - - 8% - - - - -
QTY. UNIT LABOR & MAT'LS MARK-UP TOTAL MARK-UP VAT TOTAL TOTAL UNIT
DIV. DESCRIPTION
DIRECT COST OCM PROFIT % VALUE INDIRECT COST COST COST
- sub-total -
- TOTAL COST = 0.00