Task No Task Name Responsible Person Cost

1 Floor Design Arafat


2 Machine Layout Arafat
3 Floor Clean Tareq
4 Chair Servicing Tareq
5 Layoiut Wise Machine Placement Tareq
6 Floor Painting Arafat
7 Floor Rectrofitting Arafat
8 Long Head Machine Quatation analysis Arafat
9 Long Head Machine Negociation and LC open Naheel Sir
10 Feed off The Arm Machine 2nd Hand Sourcing Arafat
11 Feed off The Arm Machine Negociation and Purchase Naheel Sir
12
13
14
15
16
17
18
19
20
21
26th Nov 27th Nov 28th Nov 29th Nov 30th Nov 1st Dec 2nd Dec 3rd Dec 4th Dec 5th Dec
6th Dec 7th Dec 8th Dec 9th Dec 10th Dec 11th Dec 12th Dec 13th Dec 14th Dec 15th Dec