CLIENT INFORMATION

Company
Project Name KUANTAN COASTAL PROTECTION
Project N°

MACCAFERRI INFORMATION

Subsidiary
Project N°

PRELIMINARY DESIGN

Officine Maccaferri S.p.A. assumes no responsibilities for the drawings and calculations it provides, as they must be intended
as general indications to suggest the proper use of its products.

30/8/2022
MACTUBE STABILITY CHECK SCHEME

SINGLE LAYER

m 1.00
Hs significant wave height
ft 3.28
MACTUBE relative density - 1.00

kg/m 3 1600
ρ filling material mass density 3
lb/ft 100
Tp wave peak period s 6.00

m/s 2 9.81
g gravity acceleration 2
ft/s 32.18
m 56.21
L0 deep water wave lenght
ft 184.41
α slope angle degrees 1

ξp surf similarity parameter - 0

f friction coefficient of the MACTUBE and subsoil - 0.50

Note: Vastenburg formula is valid only if ξp < 3, if ξp > 3 it is assumed ξp = 3


MACTUBE STABILITY CHECK

Filling material - sand


m 2.70
D theoretical diameter
ft 8.86
m 1.70
H geotextile tube maximum height
ft 5.58
m 2.30
B geotextile tube base width
ft 7.55
m 3.50
W geotextile tube maximum width
ft 11.48
m2 5.00
A tube cross section
ft 2 53.79
kg/m 3 1600.00
ρ filling material mass density
lb/ft 3 99.84
ph,b filling percentage % 70

RELATIVE SETTLEMENT OF THE TUBE (%) 3.60

STABILITY CHECK OK
GEOTEXTILE SELECTION

AOS (Apparent Opening Size) of the geotextile

The geotextile has to ensure a correct water filtration, water expulsion during and after filling phase and a
correct soil retention to avoid lack of filling material. On basis of the grain distribution of the filling material,
we can select the suitable AOS by using a soil retention criteria.

Filling material (grain size distribution) mm in


d 10 0.180 0.0071
d 60 0.610 0.0240
d 90 1.100 0.0433

Geotextile opening size mm in


O 90 0.440 0.0173

Geotextile type : Woven

SAND TIGHTNESS CRITERION (CUR 2006): SATISFIED


MACTUBE INSTALLATION PROCEDURE

mm 0.30
Dmf average grain diameter
in 0.012
m 0.30
Φpipe pipe diameter
ft 0.98
m/s 3.43
vcrit slurry critical speed
ft/s 11.25
m 3 /hr 200
Q pumping rate of filling material
ft 3 /hr 7063
m 8.48
MACTUBE circumference C
ft 27.81
m2 5.00
MACTUBE cross-section A (*)
ft 2 53.79
m 10.00
MACTUBE lenght L
ft 32.81

Extimated filling time (**) hr:min 0:29

* Calculated using GEOCOPS


** Filling time calculated considering an efficiency factor of 50%