8 Rules of

Pile Integrity
Testing
Rule #1
When? min (7 days
after cast, or 3/4 f'c)
Rule #2
Test Before Installing
the Pile Cap
Rule #3
Remove Poor Quality
Concrete/Slurry
Rule #4
Prepare Pile Head
Surface before Test
Rule #5
Test at least 3
Locations on Pile Head
Rule #6
Pile Head Should be
above Water
Rule #7
Use Proper Coupling
/ Bonding material
Rule #8
Select Proper
Hammer Size/Weight