continue Definition
“Dismantling, razing, destroying or wrecking any building or
– It is a specialize work in construction process and expert is structure or any part thereof by pre-planned and
needed. controlled methods”
(MS 2318:2012 Malaysia standards 2012)
– Should be designated as priority by contractors - creates high
potential for risks to workers and the general public.
– Can be classified into two - Fully Demolition and Partial “Demolition works means the complete or partial
Demolition. dismantling of a building or structure. It is include
refurbishment, provided this work does not involve the
alteration of existing structural components”
(ACT Safe Demolition Work Code of Practice Third Revised
Edition 2000)
3 4
3 4
1
11/1/2023
5 6
7 8
2
11/1/2023
9 10
Demolition Procedures
4. Building
• To prevent injury from broken glass, all glass must be removed from windows
Stages and
before demolition begins Works -
• Opening in walls, floors and stairways, through which people could fall, must be flow chart
boarded up or be provided with the guardrail and toe board
of
• Notices erected to warn of the danger at each point entry demolition
• All stairs or installed ladder must be checked before use process
• When dismantling pitches roof trusses, the last frame should be guyed before the
second last truss is removed, because its stability depends on the support from
adjacent members
• Remove a small section first in order to determine the direction of the main steel
when demolish reinforce concrete floor
• Column must be guyed before cutting or weakening the base, so that their fall may
11 12
be controlled
11 12
3
11/1/2023
– The demolition plan needs to include, showing the plan, i. The occupancy usage of the floor
such as the layout plan of all roof of the buildings that need ii. The structural support systems
to be demolished with adequate section and many more. iii. Principal material construction
iv. The condition of the building e.g. the degree of deterioration
v. Relationship of the building to be demolished with the neighboring
properties that affected by the demolition
13 14
13 14
4. The procedures for the demolition of the building (detail sequenced, or method
that will be adopted and list of equipment. 9. A plan with details of the description notes on the purposed method
for handling and disposal of the debris like method of handling the debris,
5. The route of movement of powered mechanical plant and equipment including transportation, time and frequency of debris proposal site, and also a
the method of lifting mechanical plant and also the additional structural temporary parking layout for machineries.
required to suit with the demolition.
7. The proposed for shoring and precautionary measures for all affected adjacent
buildings, slopes retaining structures and services at each stages of the
demolition work.
15 16
15 16
4
11/1/2023
Demolition process
The process can be divided into three main a) Pre-demolition phases
phases:
• Pre demolition Process also can be called as deconstruction
method.
• Activity consist of;
i. Site survey
ii. Site preparation and mobilization
iii. Decommissioning
iv. Soft stripping
v. Recycling and reuse
17 18
iii) Decommissioning
i) Site survey – Decommission also one of the important things.
– It is an on- site investigation. – It done by terminating all charged system like electrical, gases piping,
– To gain information about the site area, surrounding traffic, any obstacle water plumbing, telecommunication cables and also removing any
items. chemical agents that have been attached to the building.
– To identify the condition of the building whether it saves to carry out the – By terminating this item, indirectly it can reduce the hazardous level
work. during demolition work.
– To identify what type of method of demolition need to use.
iv) Soft stripping
ii) Site preparation and mobilization – Removal all non-structural items such as fixtures, fittings windows, lamp,
roof tile and many more.
– Important to prepare the site.
– In other word this items have value which can be resale or maybe being re
– Contractor know the level of hazard, but people in surrounding area did used for other construction.
not really know about it.
– Need to apply safety precaution like, fencing and hording, safety
signboard, safety net, protection of existing services and property. v) Recycling and reuse
– The good preparation and mobilization of site also can make the – Related to the soft stripping process where the material that have a value
demolition work became more efficient and safe. or can be reused or maybe can be recycle is being collected.
19 20
19 20
5
11/1/2023
21 22
21 22
c) Post-demolition phases
iii) Environmental monitoring
• is a phase focus on the implement or effect after the
– Environmental quality is including element like the water, air, sound,
vibration and many more need to take alert and need to monitored demolition work or project had been complete.
during or after the work to ensure there are not causing any trouble to
the environment and also to the public safety and health.
• Activity consist of;
i. Environmental monitoring
ii. Site clearance
23 24
23 24
6
11/1/2023
25 26
– Unlike the balling method, demolition by super high rise machine can be
said to be controlled. Therefore the introduction of high reach machine is
become necessary.
27 28
7
11/1/2023
Demolition Technique
• From the history we can now know the techniques that were used in this
demolition industry.
• This industry itself had showed how complex and hard a demolish work can be and
it requires stable, agility, suitable equipment and most important producing massive
power to tear down the structures.
• According to BS 6187, 2000, the techniques of demolition can be group into 4 main
groups:
a) Demolition by hand
b) Demolition by machine
c) Demolition by chemical agents
d) Demolition by water jetting
29 30
29 30
– Usually involves tools such as hammers, wrecking bars, cutters and also a ii) Pneumatic hammer
shovel. iii) Electric hammer
– Over the past years the tools also become more advance, the work is iv) Hydraulic hammer
become faster and save time and more important it can reduce the uses of
human power. v) Gasoline hammer
– This technique usually involved in a small scale of demolition project vi) Chipping hammer
operation. vii) Diamond drilling and sawing
– In a large scale of demolition it usually use for weakening the certain place
viii) Hydraulic bursting
of structure first before the advance tools like pneumatic hammer,
hydraulic hammer and chipping hammer takes place to proceed with the ix) Hydraulic crushing
work. x) Hydraulic splitter
31 32
31 32
8
11/1/2023
33 34
33 34
35 36
35 36
9
11/1/2023
– Only produced low stroke – Being used in vertical and overhead surfaces
energy compare to works and because of that it must be light in
hydraulic types of hammer weight.
and pneumatic hammer.
37 38
37 38
– First developed for quarry industry and – Known as the most economical
then implement to the demolished and practical methods for
industry. removing or tears up apart
reinforced or mass concrete.
39 40
10
11/1/2023
41 42
41 42
43 44
11
11/1/2023
45 46
45 46
– This hydraulic shear jaw and blade use for cutting purposed.
– The disadvantages are it
produces a high noise, dust
– Allows cutting through anything such as wood, concrete, and steel. and vibration.
47 48
12
11/1/2023
49 50
49 50
51 52
51 52
13
11/1/2023
– Dangerous and highly expensive but it can make the demolition work
become easier and faster.
– Used in cases where relatively
– Safety precaution is highly required because it is dealing with bursting, hot
cutting and also explosion. quite, dust-free, controlled
– Recommended for highly expertise man power to manage and handle the demolition is preferred.
work.
53 54
55 56
14
11/1/2023
Method of Explosive/Implosion
57 58
57 58
59 60
59 60