The document provides specifications for renovating the basement and stage area of a school in Chennai. It details the RCC concrete thickness for the floor (9 inches), walls (6 inches), and roof slab (6 inches). It also lists the quantities of materials needed, including 192 cubic feet of floor concrete, 208 cubic feet of wall concrete, and 162 cubic feet of roof slab concrete. The renovation will include a 9 inch thick brick wall backing for the stage that is 12 feet high.
The document provides specifications for renovating the basement and stage area of a school in Chennai. It details the RCC concrete thickness for the floor (9 inches), walls (6 inches), and roof slab (6 inches). It also lists the quantities of materials needed, including 192 cubic feet of floor concrete, 208 cubic feet of wall concrete, and 162 cubic feet of roof slab concrete. The renovation will include a 9 inch thick brick wall backing for the stage that is 12 feet high.
The document provides specifications for renovating the basement and stage area of a school in Chennai. It details the RCC concrete thickness for the floor (9 inches), walls (6 inches), and roof slab (6 inches). It also lists the quantities of materials needed, including 192 cubic feet of floor concrete, 208 cubic feet of wall concrete, and 162 cubic feet of roof slab concrete. The renovation will include a 9 inch thick brick wall backing for the stage that is 12 feet high.
RENOVATION OF BASEMENT AND STAGE WORK CONSTRUCTION AT
TERAPANTH SCHOOL, VADAMALAI STREET, SOWCARPET,
CHENNAI-.
SPECIFICATION:
RCC floor concrete 9” thick.
RCC all side walls concrete 6” thick. RCC roof slab concrete 6” thick. Floor steel 10 mm both way with double layer. Side wall steel 10 mm main and dist to be provide at first layer. Side wall steel 10 mm main rod and 8 mm dist rod. Roof slab steel 10mm two way slab. RCC wall height 6’6” Floor size 16’0”x16’0” Roof slab size 18’0”x18’0” 9” B/W to be provide stage back side at 12’0”height above the stage floor. M sand to be use for RCC work. R. sand to be use for ceiling and wall plastering. Demolition and Rubbish clearance include the work. I steel to be use. Flooring and painting not include the cost. GST 18% not include the cost.
NOTE:
The quantity given below is the approximate value.
The accurate quantity and amount will be finalized after the work is completed. QUANTITY
DESCRIPTION OF WORK L B D NO’S QUANTITY
Floor concrete 16’0” 16’0’ 9” ---- 192cft
Side wall concrete 16’0” 6” 6’6” 4 208cft
Roof slab concrete 18’0” 18’0” 6” ---- 162cft
Shuttering and B/b 16’0” 6’6” ---- 4 416sft
Floor B/b 16’0” 16’0” ---- ---- 256sft
Roof slab shut and B/b 18’0” 18’0” ---- ---- 324sft